[Federal Register Volume 75, Number 192 (Tuesday, October 5, 2010)]
[Notices]
[Page 61480]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-24957]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP10-502-000]


Gulf South Pipeline Company, LP; Notice of Request Under Blanket 
Authorization

September 29, 2010.
    Take notice that on September 21, 2010, Gulf South Pipeline 
Company, LP (Gulf South), 9 Greenway Plaza, Suite 2800, Houston, Texas 
77046, filed a prior notice request pursuant to sections 157.205, 
157.208, and 157.210 of the Commission's regulations under the Natural 
Gas Act (NGA) for authorization to drill construct an additional 
compressor unit in Mobile County, Alabama. Specifically, Gulf South 
proposes to construct one 2,375 horsepower (hp) reciprocating 
compressor unit at its existing Airport Compressor Station. Gulf South 
states that the additional compressor unit is necessary to increase the 
reliability of the Airport Compressor Station by allowing the station 
to operate at both a lower minimum flow and higher maximum flow. 
Additionally, Gulf South proposes to construct a new building to house 
the existing 4,735 hp compressor unit, the new 2,375 hp unit, and a 
service crane/warehouse area, all as more fully set forth in the 
application, which is on file with the Commission and open to public 
inspection. The filing may also be viewed on the web at http://www.ferc.gov using the ``eLibrary'' link. Enter the docket number 
excluding the last three digits in the docket number field to access 
the document. For assistance, contact FERC at 
[email protected] or call toll-free, (866) 208-3676 or TTY, 
(202) 502-8659.
    Any questions regarding the application should be directed to M. L. 
Gutierrez, Director, Regulatory Affairs, Gulf South Pipeline Company, 
LP, 9 Greenway Plaza, Suite 2800, Houston, Texas 77046, telephone no. 
(713) 479-8252, facsimile no. (713) 479-1745 and E-mail: 
[email protected].
    Any person may, within 60 days after the issuance of the instant 
notice by the Commission, file pursuant to Rule 214 of the Commission's 
Procedural Rules (18 CFR 385.214) a motion to intervene or notice of 
intervention. Any person filing to intervene or the Commission's staff 
may, pursuant to section 157.205 of the Commission's regulations under 
the NGA (18 CFR 157.205) file a protest to the request. If no protest 
is filed within the time allowed therefore, the proposed activity shall 
be deemed to be authorized effective the day after the time allowed for 
protest. If a protest is filed and not withdrawn within 30 days after 
the time allowed for filing a protest, the instant request shall be 
treated as an application for authorization pursuant to section 7 of 
the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (http://www.ferc.gov) under the ``e-Filing'' link.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-24957 Filed 10-4-10; 8:45 am]
BILLING CODE 6717-01-P