[Federal Register Volume 75, Number 194 (Thursday, October 7, 2010)]
[Notices]
[Page 62121]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-25253]


=======================================================================
-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13812-000]


Osprey IV, LLC; Notice of Preliminary Permit Application Accepted 
for Filing and Soliciting Comments, Motions To Intervene, and Competing 
Applications

September 30, 2010.
    On July 12, 2010, Osprey IV, LLC filed an application for a 
preliminary permit, pursuant to section 4(f) of the Federal Power Act 
(FPA), proposing to study the feasibility of the 1 Pond Dam 
Project to be located at the 1 Pond Dam, on the Mousam River, 
in York County, Maine. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would consist of: (1) The existing 14-foot-
high, 245-foot-long 1 Pond Dam; (2) an existing 100-acre 
impoundment with a normal water surface elevation of 279 feet National 
Geodetic Vertical Datum; (3) a new 6-foot-diameter siphon intake; (4) a 
new 6-foot-diameter, 706-foot-long buried concrete penstock; (5) a new 
approximately 300-square-foot powerhouse containing two new turbines 
and generators with a total installed capacity of 850 kilowatts; (6) a 
new tailrace; (7) a new approximately 100-foot-long, 7.2 or 12.47-
kilovolt transmission line; and (8) appurtenant facilities. The project 
would have an estimated annual generation of 5,500 megawatt-hours.
    Applicant Contact: Hoon Won, 275 River Road, P.O. Box 202, 
Woolwich, ME 04579; (207) 443-9747.
    FERC Contact: Brandon Cherry, (202) 502-8328.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site at http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support. Although the Commission strongly encourages electronic filing, 
documents may also be paper-filed. To paper-file, mail an original and 
seven copies to: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13812) in the docket number field to access 
the document. For assistance, contact FERC Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-25253 Filed 10-6-10; 8:45 am]
BILLING CODE 6717-01-P