[Federal Register Volume 75, Number 197 (Wednesday, October 13, 2010)]
[Notices]
[Page 62853]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-25723]
-----------------------------------------------------------------------
DEPARTMENT OF THE INTERIOR
Bureau of Land Management
[CACA-47740, LLCAD07000, L51030000.FX0000, LVRAB109AA01]
Notice of Availability of the Record of Decision for the Imperial
Valley Solar Project and Associated Amendment to the California Desert
Conservation Area Resource Management Plan-Amendment, Imperial County,
California
AGENCY: Bureau of Land Management, Interior.
ACTION: Notice of Availability.
-----------------------------------------------------------------------
SUMMARY: The Bureau of Land Management (BLM) announces the availability
of the Record of Decision (ROD)/Approved Amendment to the California
Desert Conservation Area (CDCA) Plan (the applicable Resource
Management Plan (RMP) for the project site and the surrounding areas)
located in the California Desert District. The Secretary of the
Interior approved the ROD on October 5, 2010, which constitutes the
final decision of the Department and makes the Approved Amendment to
the CDCA Plan effective immediately.
ADDRESSES: Copies of the ROD/Approved Amendment to the CDCA Plan are
available upon request from the Field Manager, El Centro Field Office,
Bureau of Land Management, 1661 S. 4th Street, El Centro, California,
92243 or via the internet at the following Web site: http://www.blm.gov/ca/st/en/fo/elcentro/nepa/stirling.html.
FOR FURTHER INFORMATION CONTACT: Jim Stobaugh, BLM Project Manager;
telephone: (775) 861-6478; mailing address: Bureau of Land Management,
P.O. Box 12000, Reno, Nevada 89520; or e-mail at [email protected].
SUPPLEMENTARY INFORMATION: Stirling Energy Systems (SES) filed right-
of-way (ROW) application CACA-47740 for the proposed SES Solar Two
Project. After merging with Tessera Solar, the applicant changed its
name to Imperial Valley Solar, LLC, and changed the name of the project
to the Imperial Valley Solar LLC (IVS) project. The IVS project is a
concentrated solar electrical generating facility using the proprietary
SunCatcher technology and facilities. The IVS project site is proposed
on approximately 6,360 acres of BLM-managed lands in Imperial County,
California, approximately 4 miles east of the community of Ocotillo,
and 14 miles west of the City of El Centro. In addition to the
SunCatcher fields site, the project includes an 230 kilovolt electrical
transmission line that encumbers approximately 93 acres of public lands
from the site to an off-site existing San Diego Gas and Electric
substation, a water supply pipeline that encumbers approximately 4
acres of public lands from an off-site water treatment plant to the
project site, and a new 230 kilovolt substation, a main services
complex, with other ancillary structures and facilities within the
project site.
The project site is in the California Desert District within the
planning boundary of the CDCA Plan, which is the applicable RMP for the
project site and the surrounding areas. The CDCA Plan, while
recognizing the potential compatibility of solar generation facilities
on public lands, requires that all sites associated with power
generation or transmission not already identified in that Plan be
considered through the BLM's land use plan amendment process. As a
result, prior to approval of a ROW grant for the IVS project, the BLM
must amend the CDCA Plan to allow that solar generating project on that
site. The Approved Amendment to the CDCA Plan specifically revises the
CDCA Plan to allow for the development of the IVS project on the 6,360
acres of land managed by the BLM with other ancillary structures and
facilities.
The BLM preferred alternative would result in the placement of
approximately 28,360 SunCatchers on the site capable of generating
approximately 709 megawatts (MW) of electricity. The 709 MW Alternative
was not evaluated in the Draft Environmental Impact Statement (EIS); it
is a modification of the 750 MW project evaluated in the Draft EIS. The
709 MW Alternative was evaluated in the Final EIS. The Notice of
Availability of the Final EIS for the IVS project and the proposed CDCA
Plan amendment was published in the Federal Register on July 28, 2010
(75 FR 44278).
Publication of the Notice of Availability for the Final EIS
initiated a 30-day protest period for the proposed amendment to the
CDCA Plan. At the close of the protest period on August 27, 2010, 7
timely and complete written protests were received and resolved. Their
resolution is summarized in a Protest Resolution Report attached to the
ROD. The proposed amendment to the CDCA Plan was not modified as a
result of the protest resolution. Simultaneous to the protest period,
the Governor of California conducted a 30-day consistency review of the
proposed CDCA Plan amendment/Final EIS to identify any inconsistencies
with the state or local plan, policies, or programs. The California
Governor's office did not identify inconsistencies between the proposed
amendment to the CDCA Plan/Final EIS and state or local plan, policies,
or programs.
Because this decision is approved by the Secretary of the Interior,
it is not subject to appeal (43 CFR 4.410(a)(3)). Therefore, the
decision is effective immediately.
Authority: 40 CFR 1506.6.
Robert V. Abbey,
Director, Bureau of Land Management.