[Federal Register Volume 75, Number 199 (Friday, October 15, 2010)]
[Rules and Regulations]
[Pages 63398-63399]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-25920]
=======================================================================
-----------------------------------------------------------------------
DEPARTMENT OF HOMELAND SECURITY
Coast Guard
33 CFR Part 117
[Docket No. USCG-2010-0926]
Drawbridge Operation Regulations; Hackensack River, Jersey City,
NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Route 1 & 9 Lincoln Highway Bridge across the Hackensack River, mile
1.8, at Jersey City, New Jersey. The deviation allows the bridge owner
to require a two-hour advance notice for openings for two and a half
months and several short term bridge closures to facilitate bridge
painting operations.
DATES: This deviation is effective with constructive notice from
October 15, 2010 through December 15, 2010, and for enforcement with
actual notice from October 4, 2010 through October 15, 2010.
[[Page 63399]]
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2010-0926 and are available online
at http://www.regulations.gov, inserting USCG-2010-0926 in the
``Keyword'' and then clicking ``Search''. They are also available for
inspection or copying at the Docket Management Facility (M-30), U.S.
Department of Transportation, West Building Ground Floor, Room W12-140,
1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5
p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Mr. Joe Arca, Project Officer, First Coast Guard
District, [email protected], telephone (212) 668-7165. If you have
questions on viewing the docket, call Renee V. Wright, Program Manager,
Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Route 1 & 9 Lincoln Highway Bridge,
across the Hackensack River, mile 1.8, at Jersey City, New Jersey, has
a vertical clearance in the closed position of 35 feet at mean high
water and 40 feet at mean low water. The drawbridge operation
regulations are listed at 33 CFR 117.5.
The waterway is primarily used by deep draft tankers, tugs and
barge units.
The owner of the bridge, New Jersey Department of Transportation,
requested a second temporary deviation from the regulations to
facilitate scheduled bridge painting operations at the bridge.
We issued a previous temporary deviation for this bridge painting
project which was in effect from April 1, 2010 through September 15,
2010; however, due to weather related delays additional time is needed
to complete the bridge painting before the cold winter climate forces
suspension of painting operations.
Waterway users were advised of the requested bridge advance notice
and closure periods and offered no objection.
Under this temporary deviation the Route 1 & 9 Lincoln Highway
Bridge shall require a two-hour advance notice for bridge openings from
October 1, 2010 through December 15, 2010, by calling the number posted
at the bridge.
In addition, the bridge owner requested several bridge closures of
short duration to facilitate bridge painting operations.
The exact bridge closure dates are not known at this time; however,
once determined, we will publish the closure dates in the Local Notice
to Mariners two weeks in advance of implementation and also issue a
safety information broadcast twenty-four hours in advance of the
implementation.
Vessels able to pass under the closed draw may do so at all times.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: October 4, 2010.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.
[FR Doc. 2010-25920 Filed 10-14-10; 8:45 am]
BILLING CODE 9110-04-P