[Federal Register Volume 75, Number 219 (Monday, November 15, 2010)]
[Notices]
[Pages 69649-69650]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-28613]


-----------------------------------------------------------------------

DEPARTMENT OF DEFENSE

Department of the Navy


Notice of Availability for the Draft Programmatic Environmental 
Assessment for the Development and Operation of Small-Scale Wind Energy 
Projects at United States Marine Corps Facilities Throughout the United 
States

AGENCY: Department of the Navy, DoD.

ACTION: Notice.

-----------------------------------------------------------------------

SUMMARY: Pursuant to Section (102)(2)(c) of the National Environmental 
Policy Act of 1969 (NEPA) (42 United States Code 4321), as implemented 
by the Council on Environmental Quality regulations for implementing 
the procedural provisions of NEPA (40 Code of Federal

[[Page 69650]]

Regulations [CFR] parts 1500-1508), and Marine Corps NEPA directives 
(Marine Corps Order P5090.2A), the Department of the Navy announces the 
availability of, and invites public comments on the Draft Programmatic 
Environmental Assessment (Draft PEA) for the development and operation 
of small-scale wind energy projects at United States Marine Corps 
(USMC) facilities throughout the Continental United States (CONUS). A 
PEA evaluates a major action on a broad, programmatic basis. Thus, 
site-specific NEPA analysis may be tiered off this document as 
appropriate.
    Dates and Addresses: The public comment period begins upon 
publication of a Notice of Availability (NOA) for the Draft PEA in the 
Federal Register. The 30-day public comment period will end on December 
4, 2010.
    The Draft PEA is available for electronic viewing at http://marines.mil/unit/marforres/MFRHQ/FACILITIES/FACILITIES.aspx, or by 
sending a request to Alain Flexer, USMC Marine Forces Reserves 
(MARFORRES), by telephone 504-678-8489, by fax 504-678-6823, by e-mail 
to [email protected] or by writing to: MARFORRES, Attn: Alain 
Flexer, 4400 Dauphine Street, New Orleans, Louisiana 70146-5400.
    Comments: All comments, written or submitted via the internet, are 
treated equally, become part of the public record on the Draft PEA, and 
will be considered in the Final PEA. During the 30-day comment period, 
all written comments should be mailed to MARFORRES, Attn: Alain Flexer, 
4400 Dauphine Street, New Orleans, LA 70146-5400. Please submit all 
comments by December 4, 2010.

FOR FURTHER INFORMATION CONTACT: MARFORRES, Attn: Alain Flexer, 
telephone 504-678-8489 or by e-mail [email protected].

SUPPLEMENTARY INFORMATION: MARFORRES (Energy Office) has completed a 
Draft PEA for the development and operation of small-scale wind energy 
projects at USMC CONUS facilities. The USMC considered ten priority 
sites at which wind is the most readily available and economically 
feasible renewable energy source, therefore, this Draft PEA does not 
consider other forms of renewable energy.
    The purpose of the proposed action is to reduce dependency on 
fossil fuels and increase energy security and efficiency through 
development of small-scale wind energy projects at USMC CONUS 
facilities. The proposed action would enable MARFORRES to achieve 
specific goals regarding energy production and usage set by Executive 
Orders, legislative acts, and Federal agencies.
    The Draft PEA evaluates the potential environmental impacts of 
three action alternatives and the No Action Alternative. Alternative 1 
involves site, design, construct, and operate one to four small wind 
turbines at USMC facilities. Alternative 2 involves site, design, 
construct, and operate one to four medium wind turbines at USMC 
facilities. Alternative 3 involves site, design, construct, and operate 
one or two large wind turbines at USMC facilities. Under the No Action 
Alternative, the USMC would not pursue the development and operation of 
small-scale wind energy projects at USMC CONUS facilities.
    Environmental resources addressed in the Draft PEA include land 
use; noise; geological resources; water resources; biological 
resources; cultural resources; visual resources; socioeconomics; air 
quality; utilities; airspace; health and safety; hazardous materials; 
and transportation. The Draft PEA also analyzes cumulative impacts from 
other past, present, and reasonably foreseeable future actions.
    Schedule: NOA of the Draft PEA will be published in the Federal 
Register. This notice initiates the 30-day public comment period for 
the Draft PEA. If the Draft PEA determines a more thorough analysis is 
necessary, then the USMC will prepare an Environmental Impact Statement 
(EIS). If additional analysis is not necessary, the USMC will issue a 
Finding of No Significant Impact (FONSI). The USMC intends to issue the 
Final PEA no later than December 2010, at which time a NOA of the FONSI 
or Notice of Intent (NOI) to prepare an EIS will be published.

    Dated: November 5, 2010.
D. J. Werner,
Lieutenant Commander, Judge Advocate Generals Corps, U.S. Navy, Federal 
Register Liaison Officer.
[FR Doc. 2010-28613 Filed 11-12-10; 8:45 am]
BILLING CODE 3810-FF-P