DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13762-000; Project No. 13773-000; Project No. 13784-000]


Notice of Competing Preliminary Permit Applications Accepted for 
Filing and Soliciting Comments, and Motions To Intervene

November 19, 2010.

FFP Missouri 15, LLC.............  Project No. 13762-000.
Morgantown Hydro, LLC............  Project No. 13773-000.
Three Rivers Hydro, LLC..........  Project No. 13784-000.
 

    On May 18, 2010, FFP Missouri 15, LLC, Morgantown Hydro, LLC, and 
Three Rivers Hydro LLC filed applications, pursuant to section 4(f) of 
the Federal Power Act, proposing to study the feasibility of hydropower 
at the U.S. Army Corps of Engineers Morgantown Lock & Dam located on 
the Monongahela River in Monongahela County, West Virginia. The sole 
purpose of a preliminary permit, if issued, is to grant the permit 
holder priority to file a license application during the permit term. A 
preliminary permit does not authorize the permit holder to perform any 
land-disturbing activities or otherwise enter upon lands or waters 
owned by others without the owners' express permission.

Descriptions of the Proposed Morgantown Lock & Dam Projects

    FFP Missouri 15, LLC's project (Project No. 13762-000) would 
consist of: (1) An excavated intake channel slightly longer and wider 
than the powerhouse; (2) a 60-foot-long, 110-foot-wide, 40-foot-high 
proposed powerhouse containing two generating units having a total 
installed capacity of 9.0 megawatts (MW); (3) an excavated tailrace 
channel slightly longer and wider than the powerhouse; and (4) a 
proposed 13-mile-long, ranging from 34.0 to 230-kilovolt (kV) 
transmission line. The proposed project would have an average annual 
generation of 26.0 gigawatt-hours (GWh), which would be sold to a local 
utility.
    Applicant Contact: Ms. Ramya Swaminathan, Free Flow Power 
Corporation, 33 Commercial Street, Gloucester, MA 01930; phone (978) 
283-2822.
    Morgantown Hydro LLC's project (Project No. 13773-000) would 
consist of: (1) A proposed 80-foot-long excavated power canal; (2) a 
proposed powerhouse containing two generating units having a total 
installed capacity of 7.2 MW; (3) a 120-foot-long excavated tailrace; 
and (4) a proposed 0.3-mile-long, 69.0-kV transmission line. The 
proposed project would have an average annual generation of 26.2 GWh, 
which would be sold to a local utility.
    Applicant Contact: Mr. Brent Smith, Symbiotics, LLC., P.O. Box 535, 
Rigby, ID 83442; phone (208) 745-0834.
    Three Rivers Hydro, LLC's project (Project No. 13784-000) would 
consist of: (1) A proposed 85-foot-long excavated power canal; (2) a 
45-foot-long, 110-foot-wide, 40-foot-high proposed powerhouse 
containing two generating units having a total installed capacity of 
3.7 MW; (3) a 95-foot-long excavated tailrace; and (4) a proposed 
1,100-foot-long, ranging from 34 to 230-kV transmission line. The 
proposed project would have an average annual generation of 20.0 GWh, 
which would be sold to a local utility.
    Applicant Contact: Mr. Joseph Watt, Esq., Three Rivers Hydro, LLC, 
316 South Clinton Street, Suite 4, Syracuse, NY 13202; phone (315) 477-
9914.
    FERC Contact: Tim Looney (202) 502-6096.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the

[[Page 73064]]

eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You 
must include your name and contact information at the end of your 
comments. For assistance, please contact FERC Online Support at 
[email protected]; call toll-free at (866) 208-3676; or, for 
TTY, contact (202) 502-8659. Although the Commission strongly 
encourages electronic filing, documents may also be paper-filed. To 
paper-file, mail an original and seven copies to: Kimberly D. Bose, 
Secretary, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13762-000, 13773-000, or 13784-000) in the 
docket number field to access the document. For assistance, contact 
FERC Online Support.

Kimberly D. Bose,
Secretary.
[FR Doc. 2010-29856 Filed 11-26-10; 8:45 am]