[Federal Register Volume 75, Number 237 (Friday, December 10, 2010)]
[Notices]
[Pages 76981-76982]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2010-31087]


-----------------------------------------------------------------------

ENVIRONMENTAL PROTECTION AGENCY

[ER-FRL-8994-1]


Environmental Impact Statements; Notice of Availability

    Responsible Agency: Office of Federal Activities, General 
Information (202) 564-1399 or http://www.epa.gov/compliance/nepa/.

Weekly Receipt of Environmental Impact Statements, Filed 11/29/2010 
Through 12/03/2010

    Pursuant to 40 CFR 1506.9.
    Notice:
    In accordance with Section 309(a) of the Clean Air Act, EPA is 
required to make its comments on EISs issued by other Federal agencies 
public. Historically, EPA has met this mandate by publishing weekly 
notices of availability of EPA comments, which includes a brief summary 
of EPA's comment letters, in the Federal Register. Since February 2008, 
EPA has been including its comment letters on EISs on its Web site at: 
http://www.epa.gov/compliance/nepa/eisdata.html. Including the entire 
EIS comment letters on the Web site satisfies the Section 309(a) 
requirement to make EPA's comments on EISs available to the public. 
Accordingly, on March 31, 2010, EPA discontinued the publication of the 
notice of availability of EPA comments in the Federal Register.

EIS No. 20100458, Draft EIS, FHWA, CA, Phase II--CA-11 and Otay Mesa 
East Port of Entry Project, Construction of a new State Route and Port 
of Entry in the East Otay Mesa Are of the City and County of San Diego, 
CA from the State Route 905/State Route 125 Interchange to the U.S.-
Mexico Border, Comment Period Ends: 02/01/2011, Contact: Cesar Perez 
916-498-5065.
EIS No. 20100459, Draft EIS, BPA, 00, Big Eddy-Knight Transmission 
Project, Proposal to Construct, Operate, and Maintain a 27-28 mile long 
500-Kilovolt Transmission Line using a Combination of Existing BPA and 
New 150-Foot wide Right-of-Way, Wasco County, OR and Klickitat County, 
WA, Comment Period Ends:

[[Page 76982]]

01/28/2011, Contact: Stacy Mason 503-230-5455.
EIS No. 20100460, Final EIS, FHWA, WA, WA-520 Bridge Replacement and 
HOV Program, To Build the New Pontoon Construction Facility, Gray 
Harbor and Pierce Counties, WA, Wait Period Ends: 01/10/2011, Contact: 
Allison Hanson 206-805-2880.
EIS No. 20100461, Draft EIS, USFS, WY, Noble Basin Master Development 
Plan (MDP) Project, Proposes to Drill up to 136 Oil and Gas Wells on 
Existing Oil and Gas Leases on National Forest System (NFS) Lands, 
Approval of a Surface Use Plan of Operations (SUPO) for a Master 
Development Plan (MDP), Sublette County, WY, Comment Period Ends: 03/
11/2011, Contact: Jacqueline A. Buchanan 307-739-5510.

Amended Notices

EIS No. 20040229, Final EIS, FHWA, WA, ADOPTION--I-90 Two-Way Transit 
and HOV Operation Project, Providing Reliable Transportation between 
Seattle and Bellevue, Sound Transit Regional Express, U.S. Coast Guard 
Permit and U.S. Corps Nationwide Permit, King County, WA, Contact: John 
Witmer, 206-220-7964. Revision to FR Notice Published 05/21/2004: The 
U.S. Department of Transportation's, Federal Transit Administration 
(DOT/FTA) has ADOPTED the U.S. Department of Transportation's Federal 
Highway Administration FEIS 20040229, filed on 05/13/2004. 
DOT/FTA was a Cooperating Agency for the above project. Recirculation 
of the FEIS is not necessary under 40 CFR 1506.3(c).
EIS No. 20100329, Final EIS, BLM, CA, ADOPTION--Blythe Solar Power 
Project (09-AFC-6), Application for Right-of Way Grant to Construct and 
Operate, and Decommission a Solar Thermal Facility on Public Lands, 
Riverside County, CA, Contact: Matthew McMillen, 202-586-7248. Revision 
to FR Notice Published 08/20/2010: The U.S. Department of Energy's has 
adopted the Department of Interior's Bureau of Land Management FEIS 
20100329, filed 08/13/2010. DOE was a cooperating agency for 
the above project. Recirculation of the FEIS is not necessary under 40 
CFR 1506.3(c).
EIS No. 20100431, Final EIS, USFS, WA, Dosewallips Road Washout 
Project, To Reestablish Road Access to both Forest Service Road (FSR) 
2610 and Dosewallips Road, Hood Canal Ranger District Olympic National 
Forest, Olympic National Park, Jefferson County, WA, Wait Period Ends: 
01/03/2011, Contact: Tim Davis 360-956-2375. Revision to FR Notice 
Published 11/05/2010: Extending Wait Period from 12/06/2010 to 01/03/
2011.
EIS No. 20100435, Draft EIS, BR, CA, Suisun Marsh Habitat Management, 
Preservation, and Restoration Plan, Implementation, CA, Comment Period 
Ends: 12/28/2010, Contact: Doug Kleinsmith 916-978-5034 Revision to FR 
Notice Published 11/05/2010: Extending Comment Period from 12/20/2010 
to 12/28/2010.
EIS No. 20100442, Draft Supplement, FTA, WA, East Link Rail Transit 
Project, New and Update Information, Proposes to Construct and Operate 
an Extension of the Light Rail System from downtown Seattle to Mercer 
Island, Bellevue, and Redmond via Interstate 90, Funding and U.S. Army 
COE Section 404 and 10 Permits, Seattle, WA, Comment Period Ends: 01/
10/2011, Contact: John Witmer 206-220-7950. Revision to FR Notice 
Published 11/12/2010: Extending Comment Period from 12/27/2010 to 01/
10/2011.
EIS No. 20100455, Final EIS, BLM, NV, ON Line Project, (Previously 
Known as Ely Energy Center) Proposed 236-mile long 500 kV Electric 
Transmission Line from a new substation near Ely, Nevada approximately 
236 mile south to the existing Harry Allen substation near Las Vegas, 
Clark, Lincoln, Nye and White Pine Counties, NV, Wait Period Ends: 01/
04/2011, Contact: Michael Dwyer 775-293-0523. Revision to FR Notice 
Published 12/06/2010: Correction to Wait Period from 01/03/2010 to 01/
04/2011.
EIS No. 20100457, Final EIS, NPS, FL, Big Cyress National Preserve 
Addition, General Management Plan/Wilderness Study/Off-Road Vehicle 
Management Plan, Implementation, Collier County, FL, Wait Period Ends: 
01/04/2011, Contact: Pedro Ramos 239-695-1101. Revision to FR Notice 
Published 12/06/2010: Correction to Wait Period from 01/03/2011 to 01/
04/2011

    Dated: December 7, 2010.
Robert W. Hargrove,
Director, NEPA Compliance Division, Office of Federal Activities.
[FR Doc. 2010-31087 Filed 12-9-10; 8:45 am]
BILLING CODE 6560-50-P