Job Corps: Preliminary Finding of No Significant Impact (FONSI) 
for the Installation of a Small Wind Turbine at the Pine Ridge Job 
Corps Center Located at 15710 Highway 385, Chadron, NE 69337

AGENCY: Office of the Secretary, Department of Labor.
    Recovery: This project will be wholly funded under the American 
Recovery and Reconstruction Act of 2009.

ACTION: Preliminary Finding of No Significant Impact (FONSI) for a 
small Wind Turbine Installation to be located at the Pine Ridge Job 
Corps Center, 15710 Highway 385, Chadron, NE 69337.

-----------------------------------------------------------------------

SUMMARY: Pursuant to the Council on Environmental Quality Regulations 
(40 CFR part 1500-08) implementing procedural provisions of the 
National Environmental Policy Act (NEPA), the Department of Labor, 
Office of the Secretary (OSEC) in accordance with 29 CFR 11.11(d), 
gives notice that an Environmental Assessment (EA) has been prepared 
for a proposed Wind Turbine Installation to be located at the Pine 
Ridge Job Corps Center, 15710 Highway 385, Chadron, NE 69337. Through 
the EA and consultation with the U.S. Fish and Wildlife and the 
Nebraska Game and Parks Commission, the proposed plan for the 
construction of a wind turbine at the Pine Ridge Job Corps Center will 
have no significant environmental impact. This Preliminary Finding of 
No Significant Impact (FONSI) will be made available for public review 
and comment for a period of 30 days.

DATES: Comments must be submitted by May 5, 2010.

ADDRESSES: Any comment(s) are to be submitted to William A Dakshaw, 
P.E., Division of Facilities and Asset Management, Department of Labor, 
200 Constitution Avenue, NW., Room N-4460, Washington, DC 20210, (202) 
693-2867 (this is not a toll-free number).

FOR FURTHER INFORMATION CONTACT: Copies of the EA are available to 
interested parties by contacting William A Dakshaw, P.E., Division of 
Facilities and Asset Management, Department of Labor, 200 Constitution 
Avenue, NW., Room N-4460, Washington, DC 20210, (202) 693-2867 (this is 
not a toll-free number).

SUPPLEMENTARY INFORMATION: This EA summary addresses the proposed 
construction of a single 100 kW rated or two 50 kW rated wind turbines 
at the Pine Ridge Job Corps Center.
    The wind turbine will be installed on self-supporting towers 
approximately 120' above the ground. The wind turbine will produce 
clean energy for the Pine Ridge Job Corps center, demonstrate renewable 
energy capabilities to Job Corps Students and help the program meet 
federal requirements in Executive Order 13423 for renewable energy 
production.
    This project is not expected to have a negative impact on 
population demographics, the surrounding area, environmental quality, 
or natural systems and heritage. The U.S. Fish and Wildlife Service and 
the Nebraska Game and Parks Commission were consulted on this project. 
The Nebraska Game and Parks Commission determined the project will have 
no effect on state listed threatened or endangered species.
    Based on the information gathered during the preparation of the EA 
and the consultation with the U.S. Fish and Wildlife and the Nebraska 
Game and Parks Commission, the construction of the Wind Turbine 
Installation at the Pine Ridge Job Corp Center, 15710 Highway 385, 
Chadron, NE 69337 will not create any significant adverse impacts on 
the environment.

    Dated: March 31, 2010.
Edna Primrose,
Director of Job Corps.
[FR Doc. 2010-7657 Filed 4-2-10; 8:45 am]
BILLING CODE 4510-23-P