Cheniere Creole Trail Pipeline, L.P.; Notice of Request Under 
Blanket Authorization

April 7, 2010.
    Take notice that on April 2, 2010, Cheniere Creole Trail Pipeline, 
L.P. (Creole Trail), 700 Milam, Suite 800, Houston, Texas 77002, filed 
in Docket No. CP10-118-000, a prior notice request pursuant to sections 
157.205, 157.208, and 157.212 of the Commission's regulations under the 
Natural Gas Act (NGA). Creole Trail seeks authorization to construct 
and operate approximately 550 feet of 12-inch diameter pipe (no above 
ground facilities will be constructed) from an existing tap on Segment 
1 of Creole Trail's system to an existing meter station at Cameron 
Meadows Processing Plant, owned by PSI Midstream Partners, L.P., all 
located in Johnson Bayou, Cameron Parish, Louisiana, to enable the 
delivery of up to 250 MMcf per day of re-gasified LNG to the plant for 
processing. The cost is estimated to be $450,000. Creole Trail proposes 
to perform these activities under its blanket certificate issued in 
Docket No. CP05-358-000 [115 FERC ] 61,331 (2006)], all as more fully 
set forth in the application which is on file with the Commission and 
open to public inspection.
    The filing may be viewed on the Web at http://www.ferc.gov using 
the ``eLibrary'' link. Enter the docket number excluding the last three 
digits in the docket number field to access the document. For 
assistance, contact FERC at [email protected] or call toll-
free, (886) 208-3676 or TYY, (202) 502-8659.
    Any questions regarding this application may be directed to Karri 
Mahmoud, Manager, Regulatory and Compliance, Cheniere Energy, Inc., 700 
Milam, Suite 800, Houston, Texas 77002, or phone at (713) 375-5000.
    Any person or the Commission's Staff may, within 60 days after the 
issuance of the instant notice by the Commission, file pursuant to Rule 
214 of the Commission's Procedural Rules (18 CFR 385.214) a motion to 
intervene or notice of intervention and, pursuant to section 157.205 of 
the Commission's Regulations under the NGA (18 CFR 157.205) a protest 
to the request. If no protest is filed within the time allowed, the 
proposed activity shall be deemed to be authorized effective the day 
after the time allowed for protest. If a protest is filed and not 
withdrawn within 30 days after the time allowed for filing a protest, 
the instant request shall be treated as an application for 
authorization pursuant to section 7 of the NGA.
    The Commission strongly encourages electronic filings of comments, 
protests, and interventions via the Internet in lieu of paper. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (http://www.ferc.gov) under the ``e-Filing'' link. Persons unable 
to file electronically should submit an original and 14 copies of the 
protest or intervention to the Federal Energy Regulatory Commission, 
888 First Street, NE., Washington, DC 20426.

Kimberly D. Bose,
Secretary.