[Federal Register Volume 76, Number 86 (Wednesday, May 4, 2011)]
[Notices]
[Page 25321]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2011-10745]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13842-000]


Wild Flower Water LLC; Notice of Preliminary Permit Application 
Accepted for Filing and Soliciting Comments, Motions To Intervene, and 
Competing Applications

    On September 23, 2010, Wild Flower Water LLC filed an application, 
pursuant to section 4(f) of the Federal Power Act, proposing to study 
the feasibility of hydropower near the town of Clayton, on the Kiamichi 
River in Pushmataha County, Oklahoma. The sole purpose of a preliminary 
permit, if issued, is to grant the permit holder priority to file a 
license application during the permit term. A preliminary permit does 
not authorize the permit holder to perform any land-disturbing 
activities or otherwise enter upon lands or waters owned by others 
without the owners' express permission.
    The proposed pumped storage project would consist of the following: 
(1) An 85-foot-high, 800-foot-long earth embankment dam creating; (2) 
an upper reservoir with a surface area of 220 acres and an 8,000 acre-
foot storage capacity; (3) a 50-foot-high, 10,500-foot-long earth 
embankment dam creating; (4) a lower reservoir with a surface area of 
300 acres and an 8,400 acre-foot storage capacity; (5) two 28-foot-
diameter, 7,500-foot-long penstocks connecting the two reservoirs; (6) 
a powerhouse/pumping station containing 4 pump/generating units with a 
total generating capacity of 1,100 megawatts; (7) a 5-foot-high, 200-
foot-long diversion dam on the Kiamichi River for filling the 
reservoirs; (8) a reservoir, on the Kiamichi River, with a surface area 
of 50 acres and an 100 acre-foot storage capacity; (9) a 1,200-foot-
long pipeline from the diversion dam to the lower reservoir and (10) a 
transmission line to an existing distribution line. The proposed 
project would have an average annual generation of 2,810,000 megawatt-
hours (MWh), which would be sold to a local utility.
    Applicant Contact: Mr. Fred Brown, 4265 Kellway Circle Addison, 
Texas 75001; phone (972) 239-0707.
    FERC Contact: Michael Spencer, (202) 502-6093.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected]; call toll-free at (866) 208-
3676; or, for TTY, contact (202) 502-8659. Although the Commission 
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and seven copies to: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13842-000) in the docket number field to 
access the document. For assistance, contact FERC Online Support.

    Dated: April 27, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-10745 Filed 5-3-11; 8:45 am]
BILLING CODE 6717-01-P