DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13851-000]
Indian Blanket Water LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
On September 30, 2010, Indian Blanket Water LLC filed an
application, pursuant to section 4(f) of the Federal Power Act,
proposing to study the feasibility of hydropower near the town of
Clayton, on the Kiamichi River in Pushmataha County, Oklahoma. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing
[[Page 25321]]
activities or otherwise enter upon lands or waters owned by others
without the owners' express permission.
The proposed pumped storage project would consist of the following:
(1) A 120-foot-high, 3,200-foot-long earth embankment dam; (2) a 30-
foot-high, 300-foot-long earth embankment saddle dam creating; (3) an
upper reservoir with a surface area of 133 acres and an 8,300 acre-foot
storage capacity; (4) a 60-foot-high, 5,600-foot-long earth embankment
dam creating; (5) a lower reservoir with a surface area of 332 acres
and an 8,100 acre-foot storage capacity; (6) one 28-foot-diameter,
7,500-foot-long penstock connecting the two reservoirs; (7) a
powerhouse/pumping station containing 3 pump/generating units with a
total generating capacity of 750 megawatts; (8) a 5-foot-high, 200-
foot-long diversion dam on the Kiamichi River for filling the
reservoirs creating; (9) a reservoir, on the Kiamichi River, with a
surface area of 50 acres and an 250 acre-foot storage capacity; (10) a
24-inch-diameter, 7,000-foot-long pipeline from the diversion dam to
the lower reservoir and (11) a transmission line to an existing
distribution line. The proposed project would have an average annual
generation of 1,920,000 megawatt-hours (MWh), which would be sold to a
local utility.
Applicant Contact: Mr. Fred Brown, 4265 Kellway Circle, Addison,
Texas 75001; phone (972) 239-0707.
FERC Contact: Michael Spencer, (202) 502-6093.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at [email protected]; call toll-free at (866) 208-
3676; or, for TTY, contact (202) 502-8659. Although the Commission
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and seven copies to: Kimberly D.
Bose, Secretary, Federal Energy Regulatory Commission, 888 First
Street, NE., Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of the
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13851-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Dated: April 27, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-10746 Filed 5-3-11; 8:45 am]
BILLING CODE 6717-01-P