[Federal Register Volume 76, Number 15 (Monday, January 24, 2011)]
[Notices]
[Page 4099]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2011-1281]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13948-000]
Public Utility No. 1 of Snohomish County; Notice of Preliminary
Permit Application Accepted for Filing and Soliciting Comments, Motions
To Intervene, and Competing Applications
January 14, 2011.
On December 20, 2010, the Public Utility No. 1 of Snohomish County,
filed an application for a preliminary permit, pursuant to section 4(f)
of the Federal Power Act (FPA), proposing to study the feasibility of
the Calligan Creek Hydroelectric Project (project) to be located on
Calligan Creek, near North Bend in King County, Washington. The sole
purpose of a preliminary permit, if issued, is to grant the permit
holder priority to file a license application during the permit term. A
preliminary permit does not authorize the permit holder to perform any
land-disturbing activities or otherwise enter upon lands or waters
owned by others without the owners' express permission.
The proposed project would consist of the following: (1) A 8-foot-
high, 60-foot-long diversion weir and intake structure; (2) an
impoundment having a total storage capacity of one acre-foot at a
normal maximum operating elevation of 2,221 feet mean sea level; (3) a
6,288-foot-long, 38-inch-diameter buried pressure penstock; (4) a
2,600-square-foot powerhouse containing a single turbine/generator unit
with an installed capacity of 6.0 megawatts; (5) a 148-foot-long, 10-
foot-wide rip-rap open channel tailrace; (6) a switchyard containing a
4.16/34.5 three-phase step-up transformer; (7) a 13,200-foot-long, 34.5
kilovolt three-phase buried transmission line and (8) appurtenant
facilities. The estimated annual generation of the project would be
20,717.8 megawatt-hours.
Applicant Contact: Mr. Kim D. Moore, Assistant General Manager of
Generation Resources; Public Utility No. 1 of Snohomish County; 2320
California Street; Everett, WA 98201; phone: 425-783-8606.
FERC Contact: Kelly Wolcott; phone: (202) 502-6480.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at [email protected] or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13948-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-1281 Filed 1-21-11; 8:45 am]
BILLING CODE 6717-01-P