[Federal Register Volume 76, Number 19 (Friday, January 28, 2011)]
[Notices]
[Pages 5147-5148]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2011-1716]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

 [Project No. 13226-003]


Blue Heron Hydro LLC; Notice of Application Accepted for Filing 
and Soliciting Motions To Intervene and Protests

January 20, 2011.
    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original Major License.
    b. Project No.: 13226-003.
    c. Date filed: November 1, 2010.
    d. Applicant: Blue Heron Hydro LLC.
    e. Name of Project: Ball Mountain Dam Hydroelectric Project.
    f. Location: U.S. Army Corps of Engineers Ball Mountain Dam on the 
West River near the Town of Jamaica, Windham County, Vermont.
    g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791 (a)-825(r).
    h. Applicant Contact: Lori Barg, Blue Heron Hydro LLC, 113 Bartlett 
Road, Plainfield, Vermont 05667. (802) 454[hyphen]1874.
    i. FERC Contact: Dr. Nicholas Palso, (202) 502-8854 or 
[email protected].
    j. Deadline for filing motions to intervene and protests: 60 days 
from the issuance date of this notice.
    All documents may be filed electronically via the Internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (http://www.ferc.gov/docs-filing/ferconline.asp) under the 
``eFiling'' link. For a simpler method of submitting text only 
comments, click on ``eComment.'' For assistance, please contact FERC 
Online Support at [email protected]; call toll-free at (866) 
208-3676; or, for TTY, contact (202) 502-8659. Although the Commission 
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and eight copies to: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    The Commission's Rules of Practice and Procedures require all 
intervenors filing documents with the Commission to serve a copy of 
that document on each person on the official service list for the 
project. Further, if an intervenor files comments or documents with the 
Commission relating to the merits of an issue that may affect the 
responsibilities of a particular resource agency, they must also serve 
a copy of the document on that resource agency.
    k. This application has been accepted for filing, but is not ready 
for environmental analysis at this time.
    l. Project Description: The Ball Mountain Dam Hydroelectric Project 
would utilize the U.S. Army Corps of Engineers' existing Ball Mountain 
Dam and reservoir and would consist of: (1) Two turbine generator 
modules located within the existing intake tower, each containing 6 
horizontal mixed flow turbines directly connected to 6

[[Page 5148]]

submersible generator units for a total installed capacity of 2,200 
kilowatts; (2) a new 12.47-kilovolt, 1,320-foot-long transmission line; 
and (3) appurtenant facilities. The project would have an estimated 
average annual generation of approximately 6,000 megawatt-hours.
    m. A copy of the application is available for review at the 
Commission in the Public Reference Room or may be viewed on the 
Commission's Web site at http://www.ferc.gov using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support. A copy is also available for inspection and 
reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    n. Any qualified applicant desiring to file a competing application 
must submit to the Commission, on or before the specified intervention 
deadline date, a competing development application, or a notice of 
intent to file such an application. Submission of a timely notice of 
intent allows an interested person to file the competing development 
application no later than 120 days after the specified intervention 
deadline date. Applications for preliminary permits will not be 
accepted in response to this notice.
    A notice of intent must specify the exact name, business address, 
and telephone number of the prospective applicant, and must include an 
unequivocal statement of intent to submit a development application. A 
notice of intent must be served on the applicant(s) named in this 
public notice.
    Anyone may submit a protest or a motion to intervene in accordance 
with the requirements of Rules of Practice and Procedure, 18 CFR 
385.210, 385.211, and 385.214. In determining the appropriate action to 
take, the Commission will consider all protests filed, but only those 
who file a motion to intervene in accordance with the Commission's 
Rules may become a party to the proceeding. Any protests or motions to 
intervene must be received on or before the specified deadline date for 
the particular application.
    When the application is ready for environmental analysis, the 
Commission will issue a public notice requesting comments, 
recommendations, terms and conditions, and prescriptions.
    All filings must (1) bear in all capital letters the title 
``PROTEST'' or ``MOTION TO INTERVENE,'' ``NOTICE OF INTENT TO FILE 
COMPETING APPLICATION,'' or ``COMPETING APPLICATION;''(2) set forth in 
the heading the name of the applicant and the project number of the 
application to which the filing responds; (3) furnish the name, 
address, and telephone number of the person protesting or intervening; 
and (4) otherwise comply with the requirements of 18 CFR 385.2001 
through 385.2005. Agencies may obtain copies of the application 
directly from the applicant. A copy of any protest or motion to 
intervene must be served upon each representative of the applicant 
specified in the particular application.

Kimberly D. Bose,
Secretary.
[FR Doc. 2011-1716 Filed 1-27-11; 8:45 am]
BILLING CODE 6717-01-P