Drawbridge Operation Regulations; Passaic River, Jersey City, NJ
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, First Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
Route 1 & 9 Bridge across the Passaic River, mile 1.8, at Jersey City,
New Jersey. The deviation is necessary for bridge painting. This
deviation allows the bridge owner to require a two-hour advance notice
for bridge openings and several short duration bridge closures.
DATES: This deviation is effective from April 1, 2011 through July 31,
2011.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2010-1121 and are available online
at http://www.regulations.gov, inserting USCG-2010-1121 in the
``Keyword'' and then clicking ``Search.'' They are also available for
inspection or copying at the Docket Management Facility (M-30), U.S.
Department of Transportation, West Building Ground Floor, Room W12-140,
1200 New Jersey Avenue, SE., Washington, DC 20590, between 9 a.m. and 5
p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail Mr. Joe Arca, Project Officer, First Coast Guard
District, [email protected] or telephone (212) 668-7165. If you have
questions on viewing the docket, call Renee V. Wright, Program Manager,
Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Route 1 & 9 Bridge has a vertical
clearance of 40 feet at mean high water, and 45 feet at mean low water
in the closed position. The existing drawbridge operating regulations
are listed at 33 CFR 117.739(b).
The waterway is predominantly used by commercial operators.
The bridge owner, New Jersey Department of Transportation,
requested a temporary deviation to facilitate bridge painting
operations.
A two-hour advance notice is necessary in order to clear personnel
and equipment from the bridge to safely provide bridge openings.
In addition, the painting operation work will necessitate several
bridge closures of short duration to erect and relocate containment.
The exact times for these closures are not known at this time because
it is predicated upon the speed of the painting process. As a result,
the Coast Guard will publish a notice in the Local Notice to Mariners
two-weeks in advance of each closure as well as issue a safety
information broadcast twenty-four hours prior to the commencement of
each closure.
Under this temporary deviation a two-hour advance notice for bridge
openings shall be required from April 1, 2011 through July 31, 2011, by
calling the number posted at the bridge. Further, several bridge
closures of short duration will be implemented. The exact bridge
closure dates will be published in the Local Notice to Mariners two
weeks in advance of each bridge closure and safety broadcasts will be
issued twenty-four hours in advance. Vessels able to pass under the
closed draw may do so at any time.
Waterway users were advised of the advance notice requirement and
the requested bridge closures. No objections were received.
In accordance with 33 CFR 117.35(e), the bridge must return to its
regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: January 11, 2011.
Gary Kassof,
Bridge Program Manager, First Coast Guard District.