[Federal Register Volume 76, Number 21 (Tuesday, February 1, 2011)]
[Notices]
[Pages 5578-5580]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2011-2139]


-----------------------------------------------------------------------

DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Docket No. CP11-50-000]


PetroLogistics Natural Gas Storage Company, LLC; Notice of Intent 
To Prepare an Environmental Assessment for the Proposed Choctaw Hub 
Expansion Project and Request for Comments on Environmental Issues

January 25, 2011.
    The staff of the Federal Energy Regulatory Commission (FERC or 
Commission) will prepare an environmental assessment that will discuss 
the environmental impacts of the Choctaw Hub Expansion Project 
involving construction and operation of facilities by PetroLogistics 
Natural Gas Storage Company, LLC (PetroLogistics) in Iberville Parish, 
Louisiana. This EA will be used by the Commission in its decision-
making process to determine whether the project is in the public 
convenience and necessity.
    This notice announces the opening of the scoping process the 
Commission will use to gather input from the public and interested 
agencies on the project. Your input will help the Commission staff 
determine what issues need to be evaluated in the EA. Please note that 
the scoping period will close on February 24, 2011.
    This notice is being sent to the Commission's current environmental 
mailing list for this project. State and local government 
representatives are asked to notify their constituents of this planned 
project and encourage them to comment on their areas of concern.
    If you are a landowner receiving this notice, you may be contacted 
by a pipeline company representative about the acquisition of an 
easement to construct, operate, and maintain the proposed facilities. 
The company would seek to negotiate a mutually acceptable agreement. 
However, if the project is approved by the Commission, that approval 
conveys with it the right of eminent domain. Therefore, if easement 
negotiations fail to produce an agreement, the pipeline company could 
initiate condemnation proceedings where compensation would be 
determined in accordance with State law.
    A fact sheet prepared by the FERC entitled ``An Interstate Natural 
Gas Facility On My Land? What Do I Need To Know?'' was attached to the 
project notice PetroLogistics provided to landowners. This fact sheet 
addresses a number of typically asked questions, including the use of 
eminent domain and how to participate in the Commission's proceedings. 
It is also available for viewing on the FERC Web site (http://www.ferc.gov).

Summary of the Proposed Project

    PetroLogistics proposes to construct the Choctaw Hub Expansion 
Project facilities consisting of two converted salt dome caverns and 
new pipeline, compression and meter station interconnect facilities. 
These facilities would be constructed in or adjacent to PetroLogistics' 
existing natural gas storage and pipeline facilities located 4 miles 
northwest of the City of Plaquemine in Iberville Parish, Louisiana. 
PetroLogistics would operate these high-deliverability, multi-cycle 
natural gas storage facilities in order to increase the total working 
capacity of the Choctaw Hub from 16 billion cubic feet (bcf) to 33.9 
bcf. According to PetroLogistics, this project would increase 
PetroLogistics' ability to provide firm and interruptible storage and 
hub services in the Gulf Coast region.
    The Choctaw Hub Expansion Project would consist of the following 
facilities:
     Conversion, into gas storage caverns, of existing Cavern 
No. 28, currently used for commercial brine service and existing Cavern 
No. 102, currently used for liquid-ethylene storage service;
     13-mile-long 30-inch-diameter Expansion Header Pipeline 
looping PetroLogistics' existing pipelines; \1\
---------------------------------------------------------------------------

    \1\ A pipeline loop is constructed parallel to an existing 
pipeline to increase capacity.
---------------------------------------------------------------------------

     two compressor units totaling 27,000 horsepower at the 
existing PetroLogistics Compressor Station;
     0.67-mile-long 30-inch-diameter cavern injection/
withdrawal pipeline (30-Inch Compressor Station Pipeline) from the 
proposed Compressor Station Expansion to Cavern 28;
     0.66-mile-long 16-inch-diameter cavern injection/
withdrawal pipeline extending from the 30-Inch Compressor Station 
pipeline at Cavern 28 to the well head at Cavern 10;
     300-foot-long 10-inch-diameter cavern injection/withdrawal 
pipeline extending from the 30-Inch Compressor Station pipeline to the 
existing certificated Cavern 24;
     0.90-mile-long 20-inch-diameter pipeline and expansion of 
the Texas Eastern Transmission Company Meter Station Interconnect;
     0.23 acre expansion of the meter station interconnect to 
Bridgeline Pipeline Company;
     0.23 acre expansion of the meter station interconnect to 
Southern Natural Gas Company;
     meter station interconnects to Florida Gas Transmission 
Company, LLC and CrossTex LIG Pipeline Company;
     side valves on the Expansion Header Pipeline for future 
lateral interconnects; and
     5.5 acre non-jurisdictional electrical substation and 
1,460 feet of overhead conductor lines to increase the existing 
electrical service lines to 69 kilovolt amperes supply capability.
    The general location of the project facilities is shown in appendix 
1.\2\
---------------------------------------------------------------------------

    \2\ The appendices referenced in this notice are not being 
printed in the Federal Register. Copies of appendices were sent to 
all those receiving this notice in the mail and are available at 
http://www.ferc.gov using the link called ``eLibrary'' or from the 
Commission's Public Reference Room, 888 First Street NE., 
Washington, DC 20426, or call (202) 502-8371. For instructions on 
connecting to eLibrary, refer to the last page of this notice.
---------------------------------------------------------------------------

Land Requirements for Construction

    Construction of the proposed facilities would require disturbance 
of 131 acres of land. This total would include 65 acres under existing 
permanent easement right-of-way, 17 acres to be added as new permanent 
easement (and ownership of aboveground facilities), and 49 acres as 
temporary construction

[[Page 5579]]

right-of-way that would be restored to previous land use following 
construction. PetroLogistics would use a 75-foot-wide construction 
right-of-way with a 10 to 40-foot temporary right-of-way width for the 
installed pipeline. About 45 percent of the proposed pipelines would 
parallel existing pipeline, utility, or road rights-of-way.

The EA Process

    The National Environmental Policy Act (NEPA) requires the 
Commission to take into account the environmental impacts that could 
result from an action whenever it considers the issuance of a 
Certificate of Public Convenience and Necessity. NEPA also requires us 
\3\ to discover and address concerns the public may have about 
proposals. This process is referred to as ``scoping''. The main goal of 
the scoping process is to focus the analysis in the EA on the important 
environmental issues. By this notice, the Commission requests public 
comments on the scope of the issues to address in the EA. All comments 
received will be considered during the preparation of the EA.
---------------------------------------------------------------------------

    \3\ ``We'', ``us'', and ``our'' refer to the environmental staff 
of the Commission's Office of Energy Projects.
---------------------------------------------------------------------------

    In the EA we will discuss impacts that could occur as a result of 
the construction and operation of the proposed project under these 
general headings:
     Geology and soils,
     Water resources,
     Wetlands and fisheries,
     Vegetation and wildlife, including migratory birds,
     Threatened and endangered species,
     Land use,
     Cultural resources,
     Air quality and noise,
     Reliability and safety, and
     Cumulative impacts.
    We will also evaluate reasonable alternatives to the proposed 
project or portions of the project, and make recommendations on how to 
lessen or avoid impacts on the various resource areas.
    Our independent analysis of the issues will be presented in the EA. 
The EA will be placed in the public record and, depending on the 
comments received during the scoping process, may be published and 
distributed to the public. A comment period will be allotted if the EA 
is published for review. We will consider all comments on the EA before 
we make our recommendations to the Commission. To ensure your comments 
are considered, please carefully follow the instructions in the Public 
Participation section below.
    With this notice, we are asking agencies with jurisdiction and/or 
special expertise with respect to environmental issues to formally 
cooperate with us in the preparation of the EA. These agencies may 
choose to participate once they have evaluated the proposal relative to 
their responsibilities. Agencies that would like to request cooperating 
agency status should follow the instructions for filing comments 
provided under the Public Participation section of this notice.

Public Participation

    You can make a difference by providing us with your specific 
comments or concerns about the project. Your comments should focus on 
the potential environmental effects, reasonable alternatives, and 
measures to avoid or lessen environmental impacts. The more specific 
your comments, the more useful they will be. To ensure that your 
comments are timely and properly recorded, please send your comments so 
that they will be received in Washington, DC on or before February 24, 
2011.
    For your convenience, there are three methods which you can use to 
submit your comments to the Commission. In all instances please 
reference the project docket number (CP11-050-000) with your 
submission. The Commission encourages electronic filing of comments and 
has expert eFiling staff available to assist you at (202) 502-8258 or 
[email protected].
    (1) You may file your comments electronically by using the eComment 
feature, which is located on the Commission's Web site at http://www.ferc.gov under the link to Documents and Filings. An eComment is an 
easy method for interested persons to submit brief, text-only comments 
on a project;
    (2) You may file your comments electronically by using the eFiling 
feature, which is located on the Commission's Web site at http://www.ferc.gov under the link to Documents and Filings. With eFiling, you 
can provide comments in a variety of formats by attaching them as a 
file with your submission. New eFiling users must first create an 
account by clicking on ``eRegister.'' You will be asked to select the 
type of filing you are making. A comment on a particular project is 
considered a ``Comment on a Filing''; or
    (3) You may file a paper copy of your comments at the following 
address: Kimberly D. Bose, Secretary, Federal Energy Regulatory 
Commission, 888 First Street, NE., Room 1A, Washington, DC 20426.

Environmental Mailing List

    The environmental mailing list includes Federal, State, and local 
government representatives and agencies; elected officials; 
environmental and public interest groups; Native American Tribes; other 
interested parties; and local libraries and newspapers. This list also 
includes all affected landowners (as defined in the Commission's 
regulations) who are potential right-of-way grantors, whose property 
may be used temporarily for project purposes, or who own homes within 
certain distances of aboveground facilities, and anyone who submits 
comments on the project. We will update the environmental mailing list 
as the analysis proceeds to ensure that we send the information related 
to this environmental review to all individuals, organizations, and 
government entities interested in and/or potentially affected by the 
proposed project.
    If the EA is published for distribution, copies will be sent to the 
environmental mailing list for public review and comment. If you would 
prefer to receive a paper copy of the document instead of the CD 
version or would like to remove your name from the mailing list, please 
return the attached Information Request (appendix 2).

Becoming an Intervenor

    In addition to involvement in the EA scoping process, you may want 
to become an ``intervenor'' which is an official party to the 
Commission's proceeding. Intervenors play a more formal role in the 
process and are able to file briefs, appear at hearings, and be heard 
by the courts if they choose to appeal the Commission's final ruling. 
An intervenor formally participates in the proceeding by filing a 
request to intervene. Instructions for becoming an intervenor are 
included in the User's Guide under the ``e-filing'' link on the 
Commission's Web site.

Additional Information

    Additional information about the project is available from the 
Commission's Office of External Affairs, at (866) 208-FERC, or on the 
FERC Web site at http://www.ferc.gov using the ``eLibrary'' link. Click 
on the eLibrary link, click on ``General Search'' and enter the docket 
number, excluding the last three digits in the Docket Number field 
(i.e., CP11-50). Be sure you have selected an appropriate date range. 
For assistance, please contact FERC Online Support at 
[email protected] or toll free at (866) 208-3676, or for TTY, 
contact (202) 502-8659. The eLibrary link also provides access to the

[[Page 5580]]

texts of formal documents issued by the Commission, such as orders, 
notices, and rulemakings.
    In addition, the Commission now offers a free service called 
eSubscription which allows you to keep track of all formal issuances 
and submittals in specific dockets. This can reduce the amount of time 
you spend researching proceedings by automatically providing you with 
notification of these filings, document summaries, and direct links to 
the documents. Go to http://www.ferc.gov/esubscribenow.htm.
    Finally, public meetings or site visits will be posted on the 
Commission's calendar located at http://www.ferc.gov/EventCalendar/EventsList.aspx along with other related information.

Kimberly D. Bose,
Secretary.
[FR Doc. 2011-2139 Filed 1-31-11; 8:45 am]