[Federal Register Volume 76, Number 29 (Friday, February 11, 2011)]
[Notices]
[Page 7838]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2011-3049]
-----------------------------------------------------------------------
DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 13953-000]
Mahoning Hydropower, LLC; Notice of Preliminary Permit
Application Accepted for Filing and Soliciting Comments, Motions To
Intervene, and Competing Applications
January 31, 2011.
On December 30, 2010, Mahoning Hydropower, LLC filed an application
for a preliminary permit, pursuant to section 4(f) of the Federal Power
Act (FPA), proposing to study the feasibility of the Lake Milton
Hydroelectric Project (Lake Milton Project or project) to be located on
the Mahoning River, in the town of Lake Milton, Mahoning County, Ohio.
The sole purpose of a preliminary permit, if issued, is to grant the
permit holder priority to file a license application during the permit
term. A preliminary permit does not authorize the permit holder to
perform any land-disturbing activities or otherwise enter upon lands or
waters owned by others without the owners' express permission.
The proposed project would consist of the following: (1) A two-
mile-long reservoir with a surface area of 1685 acres at a normal pool
elevation of 948 mean sea level; (2) a 54-foot-high, 760-foot-long
concrete gravity dam including a 650-foot-long spillway and four 60-
inch-diameter gate valves; (3) a 35-foot-long, 25-foot-wide concrete
powerhouse located at the base of the dam and over the existing Gate 2
discharge pipe containing one tubular S-Type propeller turbine-
generator unit with a capacity of 650 kilowatts and placed inside the
existing 70-foot-long, 60-inch-diameter cast iron conduit through the
existing dam; (4) a new 12.5-kilovolt, 320-foot-long transmission line
connecting the powerhouse to an existing distribution line; and (5)
appurtenant facilities. The estimated annual generation of the Lake
Milton Project would be 3,700 megawatt-hours at a head range of 26-40
feet.
Applicant Contact: Mr. Anthony J. Marra III, General Manager, 11365
Normandy Lane, Chagrin Falls, Ohio 44023; phone: (440) 804-6627.
FERC Contact: Sergiu Serban; phone: (202) 502-6211.
Deadline for filing comments, motions to intervene, competing
applications (without notices of intent), or notices of intent to file
competing applications: 60 days from the issuance of this notice.
Competing applications and notices of intent must meet the requirements
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and
competing applications may be filed electronically via the Internet.
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's
Web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can
submit brief comments up to 6,000 characters, without prior
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information
at the end of your comments. For assistance, please contact FERC Online
Support at [email protected] or toll free at 1-866-208-3676,
or for TTY, (202) 502-8659. Although the Commission strongly encourages
electronic filing, documents may also be paper-filed. To paper-file,
mail an original and seven copies to: Kimberly D. Bose, Secretary,
Federal Energy Regulatory Commission, 888 First Street, NE.,
Washington, DC 20426.
More information about this project, including a copy of the
application, can be viewed or printed on the ``eLibrary'' link of
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp.
Enter the docket number (P-13953-000) in the docket number field to
access the document. For assistance, contact FERC Online Support.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-3049 Filed 2-10-11; 8:45 am]