BOST4 Hydroelectric Company, LLC; Notice of Application Tendered 
for Filing With the Commission and Soliciting Additional Study Requests

    Take notice that the following hydroelectric application has been 
filed with the Commission and is available for public inspection.
    a. Type of Application: Original Major License.
    b. Project No.: P-12757-003.
    c. Date filed: February 24, 2011.
    d. Applicant: BOST4 Hydroelectric Company, LLC (BOST4).
    e. Name of Project: Red River Lock & Dam No. 4 Hydroelectric 
Project.
    f. Location: The proposed project would be located at the existing 
Army Corps of Engineer's (Corps) Red River Lock & Dam No. 4 on the Red 
River, in Red River Parish near the City of Coushatta, Louisiana.
    g. Filed Pursuant to: Federal Power Act 16 U.S.C. 791(a)-825(r).

[[Page 14652]]

    h. Applicant Contacts: Mr. Douglas A. Spalding, BOST4 Hydroelectric 
Company, LLC, 8441 Wayzata Blvd., Suite 101, Golden Valley, MN 55426; 
(952) 544-8133.
    i. FERC Contact: Jeanne Edwards (202) 502-6181 or by e-mail at 
[email protected].
    j. Cooperating agencies: Federal, state, local, and tribal agencies 
with jurisdiction and/or special expertise with respect to 
environmental issues that wish to cooperate in the preparation of the 
environmental document should follow the instructions for filing such 
requests described in item l below. Cooperating agencies should note 
the Commission's policy that agencies that cooperate in the preparation 
of the environmental document cannot also intervene. See, 94 FERC ] 
61,076 (2001).
    k. Pursuant to Section 4.32(b)(7) of 18 CFR of the Commission's 
regulations, if any resource agency, Indian Tribe, or person believes 
that an additional scientific study should be conducted in order to 
form an adequate factual basis for a complete analysis of the 
application on its merit, the resource agency, Indian Tribe, or person 
must file a request for a study with the Commission not later than 60 
days from the date of filing of the application, and serve a copy of 
the request on the applicant.
    l. Deadline for filing additional study requests and requests for 
cooperating agency status: April 25, 2011.
    All documents may be filed electronically via the internet. See 18 
CFR 385.2001(a)(1)(iii) and the instructions on the Commission's Web 
site (http://www.ferc.gov/docs-filing/ferconline.asp) under the ``e-
Filing'' link. For a simpler method of submitting text only comments, 
click on ``eComment.'' For assistance, please contact FERC Online 
Support at [email protected]; call toll-free at (866) 208-
3676; or, for TTY, contact (202) 502-8659. Although the Commission 
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and eight copies to: Kimberly D. 
Bose, Federal Energy Regulatory Commission, 888 First Street, NE., 
Washington, DC 20426.
    m. The application is not ready for environmental analysis at this 
time.
    n. The proposed project would utilize the existing U.S. Army Corps 
of Engineers (Corps) Red River Lock and Dam No. 4, and operate 
consistent with the Corps current operation policy. The proposed 
project consists of: (1) An excavated 385-foot-long headrace channel to 
convey water from the upstream Pool No. 4 of the Red River to a 301-
foot-long by 90-foot-wide concrete powerhouse located southwest of the 
end of the existing overflow weir; (2) an excavated 477-foot-long 
tailrace channel to discharge water from the powerhouse to the 
downstream Pool No. 3 of the Red River; (3) one 28.1-megawatt (MW) 
horizontal Kaplan bulb turbine/generator unit; (4) one 3.0 mile-long, 
34.5-kilovolt (kV) overhead transmission line leading from a project 
substation located at the project's powerhouse and connecting to 
Central Louisiana Electric Company's existing 34.5-kV transmission 
line; and (5) appurtenant facilities. The proposed project would 
generate about 128,532 megawatt-hours (MWh) annually which would be 
sold to a local utility.
    o. A copy of the application is available for review at the 
Commission in the Public Reference Room, or may be viewed on the 
Commission's Web site at http://www.ferc.gov, using the ``eLibrary'' 
link. Enter the docket number excluding the last three digits in the 
docket number field to access the document. For assistance, contact 
FERC Online Support at [email protected] or toll-free at 1-
866-208-3676, or for TTY, (202) 502-8659. A copy is also available for 
inspection and reproduction at the address in item h above.
    You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and 
issuances related to this or other pending projects. For assistance, 
contact FERC Online Support.
    p. With this notice, we are initiating consultation with the 
Louisiana State Historic Preservation Officer (SHPO), as required by 
106, National Historic Preservation Act, and the regulations of the 
Advisory Council on Historic Preservation, 36, CFR, at 800.4.
    q. Procedural schedule: The application will be processed according 
to the following Hydro Licensing Schedule. Revisions to the schedule 
will be made as appropriate.

------------------------------------------------------------------------
 
------------------------------------------------------------------------
Issue Deficiency Letter...............  May 2011.
Issue Acceptance Letter...............  September 2011.
Issue Scoping Document 1 for comments.  October 2011.
Request Additional Information (if      December 2011.
 necessary).
Notice of application is ready for      April 2012.
 environmental analysis.
Notice of the availability of the EA..  April 2013.
------------------------------------------------------------------------


    Dated: March 10, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-6195 Filed 3-16-11; 8:45 am]