DEPARTMENT OF ENERGY

Federal Energy Regulatory Commission

[Project No. 13818-000]


Lock Hydro Friends Fund LI; Notice of Preliminary Permit 
Application Accepted for Filing and Soliciting Comments, Motions To 
Intervene, and Competing Applications

    On July 16, 2010, Lock Hydro Friends Fund LI, filed an application, 
pursuant to section 4(f) of the Federal Power Act, proposing to study 
the feasibility of hydropower at the U.S. Army Corps of Engineers 
(Corps) Kentucky River Lock and Dam located on the Kentucky River in 
Carroll County, Kentucky. The sole purpose of a preliminary permit, if 
issued, is to grant the permit holder priority to file a license 
application during the permit term. A preliminary permit does not 
authorize the permit holder to perform any land-disturbing activities 
or otherwise enter upon lands or waters owned by others without the 
owners' express permission.
    The proposed project would consist of the following: (1) Two 
prefabricated concrete walls attached to the downstream side of the 
Corps dam which would support one frame

[[Page 18756]]

module; (2) the frame module would be 52 feet long, 40 feet high, and 
weigh 600,000 pounds and contain 4 generating units with a total 
combined capacity of 2.0 megawatts (MW); (3) a new switchyard 
containing a transformer; (4) a proposed 2.0-mile-long, 69-kilovolt 
(kV) transmission line to an existing distribution line. The proposed 
project would have an average annual generation of 8.766 gigawatt-hours 
(GWh), which would be sold to a local utility.
    Applicant Contact: Mr. Wayne Krouse, Hydro Green Energy LLC, 5090 
Richmond Avenue 390, Houston, TX 77056; phone (877) 556-6566 
x709.
    FERC Contact: Michael Spencer, (202) 502-6093.
    Deadline for filing comments, motions to intervene, competing 
applications (without notices of intent), or notices of intent to file 
competing applications: 60 days from the issuance of this notice. 
Competing applications and notices of intent must meet the requirements 
of 18 CFR 4.36. Comments, motions to intervene, notices of intent, and 
competing applications may be filed electronically via the Internet. 
See 18 CFR 385.2001(a)(1)(iii) and the instructions on the Commission's 
web site http://www.ferc.gov/docs-filing/efiling.asp. Commenters can 
submit brief comments up to 6,000 characters, without prior 
registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact information 
at the end of your comments. For assistance, please contact FERC Online 
Support at [email protected]; call toll-free at (866) 208-
3676; or, for TTY, contact (202) 502-8659. Although the Commission 
strongly encourages electronic filing, documents may also be paper-
filed. To paper-file, mail an original and seven copies to: Kimberly D. 
Bose, Secretary, Federal Energy Regulatory Commission, 888 First 
Street, NE., Washington, DC 20426.
    More information about this project, including a copy of the 
application, can be viewed or printed on the ``eLibrary'' link of the 
Commission's Web site at http://www.ferc.gov/docs-filing/elibrary.asp. 
Enter the docket number (P-13818-000) in the docket number field to 
access the document. For assistance, contact FERC Online Support.

    Dated: March 17, 2011.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-7986 Filed 4-4-11; 8:45 am]
BILLING CODE 6717-01-P