DEPARTMENT OF DEFENSE
Defense Acquisition Regulations System
48 CFR Part 236
RIN 0750-AG91
Defense Federal Acquisition Regulation Supplement; Construction
and Architect-Engineer Services Performance Evaluation (DFARS Case
2010-D024)
AGENCY: Defense Acquisition Regulations System, Department of Defense
(DoD).
ACTION: Proposed rule.
-----------------------------------------------------------------------
SUMMARY: DoD is proposing to amend the Defense Federal Acquisition
Regulation Supplement (DFARS) to remove the requirement to use DoD-
unique forms to prepare contractor performance evaluations for
construction and architect-engineer services.
DATES: Comments on the proposed rule should be submitted in writing to
the address shown below on or before June 20, 2011, to be considered in
the formation of the final rule.
ADDRESSES: You may submit comments, identified by DFARS Case 2010-D024,
using any of the following methods:
Regulations.gov, http://www.regulations.gov. Submit comments via
the Federal eRulemaking portal by inputting ``DFARS Case 2010-D024''
under the heading ``Enter keyword or ID'' and selecting ``Search.''
Select the link ``Submit a Comment'' that corresponds with ``DFARS Case
2010-D024.'' Follow the instructions provided at the ``Submit a
Comment'' screen. Please include your name, company name (if any), and
``DFARS Case 2010-D024'' on your attached document.
E-mail: [email protected]. Include DFARS Case 2010-D024 in the subject
line of the message.
FAX: 703-602-0350.
Mail: Defense Acquisition Regulations System, Attn: Mr. Manuel
Quinones, OUSD (AT&L) DPAP (DARS), Room 3B855, 3060 Defense Pentagon,
Washington, DC 20301-3060.
Comments received generally will be posted without change to http://regulations.gov, including any personal information provided. To
confirm receipt of your comment, please check http://www.regulations.gov approximately two to three days after submission to
verify posting, except allow 30 days for posting of comments submitted
by mail.
FOR FURTHER INFORMATION CONTACT: Mr. Manuel Quinones, telephone 703-
602-8383.
SUPPLEMENTARY INFORMATION:
I. Background
This case removes the requirement to use DoD-unique forms to
document contractor past performance for construction and Architect-
Engineer (A&E) services. Historically, the Federal Government collected
past performance data for construction and A&E services on specific
standard forms (SF 1420 and SF 1421, respectively). DoD collected the
data on DD Form 2626, Performance Evaluation (Construction), and DD
Form 2631, Performance Evaluation (Architect-Engineer), in lieu of the
standard forms. The Federal Acquisition Regulation (FAR) has been
updated to remove the standard forms in their entirety, as well as the
procedures that accompanied them, and now points solely to the
requirements of FAR subpart 42.15 for past-performance reporting for
construction and A&E contracts.
Earlier in 2010, consistent with the Office of Federal Procurement
Policy memorandum dated July 29, 2008, Improving the Use of Contractor
Performance Information, the Contractor Performance Assessment
Reporting System (CPARS) was named as the sole system for collecting
past-performance information. As such, CPARS will support
Governmentwide data collection requirements for contractor past
performance reporting, to include construction and A&E contracts, and
DFARS is being updated to delete the outdated procedures and references
to the obsolete DD forms.
II. Executive Order 12866 and Executive Order 13563
Executive Orders 12866 and 13563 direct agencies to assess all
costs and benefits of available regulatory alternatives and, if
regulation is necessary, to select regulatory approaches that maximize
net benefits (including potential economic, environmental, public
health and safety effects, distributive impacts, and equity). Executive
Order 13563 emphasizes the importance of quantifying both costs and
benefits, of reducing costs, of harmonizing rules, and of promoting
flexibility. This is not a significant regulatory action and,
therefore, was not subject to review under Section 6(b) of Executive
Order 12866, Regulatory Planning and Review, dated September 30, 1993.
This rule is not a major rule under 5 U.S.C. 804.
III. Regulatory Flexibility Act
DoD has prepared an initial regulatory flexibility analysis
consistent with 5 U.S.C. 603. A copy of the analysis may be obtained
from the point of contact specified herein. The analysis is summarized
as follows:
This proposed rule addresses the removal of the procedures for use
of and references to DD Forms 2626 and 2631 from DFARS. DFARS part 236
supplemented the language previously included in the Federal
Acquisition Regulation (FAR) that specified certain procedures and
forms be used to document contractor performance for construction and
A&E services. The FAR has been updated to remove those procedures and
standard forms; FAR 36.201 and FAR 36.604 now refer to FAR 42.1502(e)
for the requirements for preparing past performance evaluations.
The objective of this rule is to remove the requirement to use DD
Forms 2626, Performance Evaluation (Construction), and 2631,
Performance Evaluation (Architect-Engineer), to evaluate contractor
past performance. Since the Contractor Performance Assessment Report
System (CPARS) is now the Governmentwide system for electronically
collecting past performance data, there is no need to specify separate
DoD-unique forms to collect the data.
The number of small entities to be impacted by this proposed rule
is unknown, however, due to the low dollar thresholds currently in
place for reporting, it is expected that a large number of small
entities will require past performance evaluations to be completed by
Government personnel. Past performance evaluations are required for
each construction contract of $650,000 or more and for each
construction contract terminated for default regardless of contract
value. For Architect and Engineer (A&E) services, past performance
evaluations are required for contracts of $30,000 or more, and for each
A&E contract that is terminated for default regardless of contract
value.
The rule will not have a significant economic impact on a
substantial number of small entities within the meaning of the
Regulatory Flexibility Act, 5 U.S.C. 601, et seq., because the
clarifications proposed require no additional effort by contractors as
the changes simply update the DFARS to reflect the current automated
process being used. CPARS is already being used by DoD personnel to
report construction and A&E services contractor past performance, and
the DFARS is merely being updated to
[[Page 21852]]
remove references to obsolete forms and procedures and reflect the
current process. No start-up costs are expected as only Internet access
is required should small entities elect to comment on their past
performance rating in CPARS. This rule will not duplicate, overlap, or
conflict with any other known Federal rule. There are no known
alternatives to this proposed rule.
DoD invites comments from small businesses and other interested
parties on the expected impact of this rule on small entities.
DoD will also consider comments from small entities concerning the
existing regulations in subparts affected by this rule in accordance
with 5 U.S.C. 610. Interested parties must submit such comments
separately and should cite 5 U.S.C. 610 (DFARS Case 2010-D024), in
correspondence.
IV. Paperwork Reduction Act
The proposed rule does not impose additional information collection
requirements that require the approval of the Office of Management and
Budget under the Paperwork Reduction Act (44 U.S.C. chapter 35.).
List of Subjects in 48 CFR Part 236
Government procurement.
Mary Overstreet,
Editor, Defense Acquisition Regulations System.
Therefore, 48 CFR part 236 is proposed to be amended as follows:
1. The authority citation for 48 CFR part 236 continues to read as
follows:
Authority: 41 U.S.C. 1303 and 48 CFR chapter 1.
PART 236--CONSTRUCTION AND ARCHITECT-ENGINEER CONTRACTS
236.201 [Removed]
2. Section 236.201 is removed.
3. Revise section 236.604 to read as follows:
236.604 Performance evaluation.
Prepare a separate performance evaluation after actual construction
of the project. Ordinarily, the evaluating official should be the
person most familiar with the A-E's performance.
[FR Doc. 2011-8962 Filed 4-18-11; 8:45 am]