DEPARTMENT OF ENERGY
Federal Energy Regulatory Commission
[Project No. 5637-005]
Bell Mountain Hydro LLC; Notice of Application for Amendment of
Exemption and Soliciting Comments, Motions To Intervene, and Protests
January 11, 2011.
Take notice that the following hydroelectric application has been
filed with the Commission and is available for public inspection:
a. Application Type: Amendment of Exemption.
b. Project No.: 5637-005.
c. Date Filed: November 22, 2010.
d. Applicant: Bell Mountain Hydro, LLC.
e. Name of Project: Pancheri Hydroelectric Project.
f. Location of Project: On the Telford Irrigation Pipeline, in
Butte County, Idaho.
g. Filed Pursuant to: Federal Power Act, 16 U.S.C. 791a-825r.
h. Applicant Contact: Mr. Ted Sorenson, Bell Mountain Hydro LLC,
5203 South 11th East, Idaho Falls, ID 83404; (208) 522-8069.
i. FERC Contact: Mr. Christopher Chaney, (202) 502-6778,
[email protected].
j. Deadline for filing comments, motions to intervene, and protest:
February 10, 2011.
All documents may be filed electronically via the Internet. See, 18
CFR 385.2001(a)(1)(iii) or the instructions on the Commission's Web
site at http://www.ferc.gov/docs-filing/efiling.asp. If unable to be
filed electronically, documents may be paper-filed. To paper-file, an
original and seven copies should be mailed to: The Secretary, Federal
Energy Regulatory Commission, 888 First Street, NE., Washington, DC
20426. Commenters may submit comments up to 6,000 characters, without
prior registration, using the eComment system at http://www.ferc.gov/docs-filing/ecomment.asp. You must include your name and contact
information at the end of your comments.
The Commission's Rules of Practice and Procedure require all
interveners filing documents with the Commission to serve a copy of
that document on each person whose name appears on the official service
list for the project. Further, if an intervener files comments or
documents with the Commission relating to the merits of an issue that
may affect the responsibilities of a particular resource agency, they
must also serve a copy of the document on that resource agency.
k. Description of Request: Bell Mountain Hydro, LLC is seeking an
amendment to reflect the transmission line configuration as it was
originally built in 1982. The original exemption authorized the
construction of a 7,000-foot-long transmission line extending in a
south-southeast direction from the powerhouse. However, the original
line, as-built in 1982, is approximately 5,830 feet in length and
extends from the powerhouse toward the south-southwest. The amendment
does not propose any new construction or modifications to project
facilities or changes in project operation.
l. A copy of the application is available for review at the
Commission in the Public Reference Room or may be viewed on the
Commission's Web site at http://www.ferc.gov using the ``eLibrary''
link. Enter the docket number excluding the last three digits in the
docket number field to access the document. For assistance, contact
FERC Online Support. A copy is also available for inspection and
reproduction at the address in item h above.
You may also register online at http://www.ferc.gov/docs-filing/esubscription.asp to be notified via e-mail of new filings and
issuances related to this or other pending projects. For assistance,
contact FERC Online Support.
m. Individuals desiring to be included on the Commission's mailing
list should so indicate by writing to the Secretary of the Commission.
Anyone may submit comments, a protest, or a motion to intervene in
accordance with the requirements of Rules of Practice and Procedure, 18
CFR 385.210, .211, .214. In determining the appropriate action to take,
the Commission will consider all protests or other comments filed, but
only those who file a motion to intervene in accordance with the
Commission's Rules may become a party to the proceeding. Any comments,
protests, or motions to intervene must be received on or before the
specified comment date for the particular application.
Any filings must bear in all capital letters the title
``COMMENTS,'' ``PROTEST,'' or ``MOTION TO INTERVENE,'' as applicable,
and the Project Number of the particular application to which the
filing refers. A copy of any motion to intervene must also be served
upon each representative of the Applicant specified in the particular
application.
Federal, State, and local agencies are invited to file comments on
the described application. A copy of the application may be obtained by
agencies directly from the applicant. If an agency does not file
comments within the time specified for filing comments, it will be
presumed to have no comments. One copy of an agency's comments must
also
[[Page 2894]]
be sent to the Applicant's representatives.
Kimberly D. Bose,
Secretary.
[FR Doc. 2011-914 Filed 1-14-11; 8:45 am]
BILLING CODE 6717-01-P