Drawbridge Operation Regulation; Company Canal, Lockport, LA
AGENCY: Coast Guard, DHS.
ACTION: Notice of temporary deviation from regulations.
-----------------------------------------------------------------------
SUMMARY: The Commander, Eighth Coast Guard District, has issued a
temporary deviation from the regulation governing the operation of the
LA 1 vertical lift span bridge across Company Canal, mile 0.4, at
Lockport, Lafourche Parish, Louisiana. The deviation is necessary to
perform electrical rehabilitation work on the bridge. This deviation
allows the bridge to remain closed to navigation for twelve consecutive
hours each day from Monday through Thursday for three weeks.
DATES: This deviation is effective from 6 a.m. on Monday, June 27, 2011
through 6 p.m. on Thursday, July 14, 2011.
ADDRESSES: Documents mentioned in this preamble as being available in
the docket are part of docket USCG-2011-0252 and are available online
by going to http://www.regulations.gov, inserting USCG-2011-0252 in the
``Keyword'' box and then clicking ``Search''. They are also available
for inspection or copying at the Docket Management Facility (M-30),
U.S. Department of Transportation, West Building Ground Floor, Room
W12-140, 1200 New Jersey Avenue, SE., Washington, DC 20590, between 9
a.m. and 5 p.m., Monday through Friday, except Federal holidays.
FOR FURTHER INFORMATION CONTACT: If you have questions on this rule,
call or e-mail David Frank, Bridge Administration Branch, Coast Guard;
telephone 504-671-2128, e-mail [email protected]. If you have
questions on viewing the docket, call Renee V. Wright, Program Manager,
Docket Operations, telephone 202-366-9826.
SUPPLEMENTARY INFORMATION: The Louisiana Department of Transportation
and Development has requested a temporary deviation from the operating
schedule of the vertical lift span bridge across Company Canal at mile
0.4 in Lockport, Lafourche Parish, Louisiana. The vertical clearance of
the bridge is 5 feet above Mean High Water in the closed-to-navigation
position and 50 feet above Mean High Water in the open-to-navigation
position.
In accordance with 33 CFR 117.438(a), the vertical lift span of the
bridge currently opens on signal except that, from 6 p.m. to 10 a.m.
the draw opens on signal if at least 4 hours notice is given. This
deviation allows the vertical lift span of the bridge to remain closed
to navigation from 6 a.m. until 6 p.m. Monday through Thursday from
Monday, June 27, 2011 through Thursday July 14, 2011.
The closure is necessary in order to replace electrical conductors
and conduit throughout the bridge structure, including the removal and
replacement of all navigation lights on the span and fender system.
This maintenance is essential for the continued operation of the
bridge. Temporary navigational lighting will be provided during the
closure and power outage period. Notices will be published in the
Eighth Coast Guard District Local Notice to Mariners and will be
broadcast via the Coast Guard Broadcast Notice to Mariners System.
Navigation on the waterway consists of commercial and recreational
fishing vessels, small to medium crew boats, and small tugs with and
without tows. The bridge opens for the passage of navigation an average
of 16 times per month. There are two alternate waterway routes
available via the Gulf Intracoastal Waterway east to Bayou Lafourche
and west to Navigation Canal. Small vessels may pass under the bridge
while in the closed-to-navigation position provided caution is
exercised.
Due to prior experience and coordination with waterway users, it
has been determined that this closure will not have a significant
effect on vessels that use the waterway.
In accordance with 33 CFR 117.35(e), the drawbridge must return to
its regular operating schedule immediately at the end of the designated
time period. This deviation from the operating regulations is
authorized under 33 CFR 117.35.
Dated: April 5, 2011.
David M. Frank,
Bridge Administrator.
[FR Doc. 2011-9147 Filed 4-14-11; 8:45 am]