[Federal Register Volume 76, Number 73 (Friday, April 15, 2011)]
[Notices]
[Pages 21425-21426]
From the Federal Register Online via the Government Publishing Office [www.gpo.gov]
[FR Doc No: 2011-9167]


-----------------------------------------------------------------------

DEPARTMENT OF TRANSPORTATION

Surface Transportation Board

[Docket No. FD 35478]


Rocky Mountain Railcar and Repair, Inc.--Acquisition and 
Operation Exemption--Line of Railroad in Tooele County, UT

    Rocky Mountain Railcar and Repair, Inc. (Rocky Mountain), a 
noncarrier, has filed a verified notice of exemption under 49 CFR 
1150.31 to acquire from Utah Industrial Depot and operate 11.5 miles of 
rail line, located inside an existing industrial facility in Tooele 
County, Utah.\1\ The rail line includes a spur that connects to the 
Union Pacific Railroad Company main line.
---------------------------------------------------------------------------

    \1\ Rocky Mountain states that it currently operates a railcar 
repair facility, but that it seeks to become a common carrier.
---------------------------------------------------------------------------

    According to Rocky Mountain, the transaction is expected to be 
consummated on or after September 28, 2011 (180 days after the 
exemption was filed); this is after the May 1, 2011 effective date of 
the exemption (30 days after the exemption was filed).
    Rocky Mountain certifies that its projected annual revenues as a 
result of this transaction will not result in Rocky Mountain becoming a 
Class II or Class I rail carrier. Rocky Mountain further certifies that 
its projected annual revenues upon becoming a Class III carrier will 
not exceed $5 million.
    If the notice contains false or misleading information, the 
exemption is void ab initio. Petitions to revoke the exemption under 49 
U.S.C. 10502(d) may be filed at any time. The filing of a petition to 
revoke will not automatically stay the effectiveness of the exemption. 
Petitions to stay must be filed no later than April 22, 2011 (at least 
7 days before the exemption becomes effective).
    An original and 10 copies of all pleadings, referring to Docket No. 
FD 35478, must be filed with the Surface Transportation Board, 395 E 
Street, SW., Washington, DC 20423-0001. In addition, one copy of each 
pleading must be served on Trent D. Stirling, Rocky Mountain Railcar 
and Repair, Inc., 1485 W. James Way, Tooele, UT 84074.
    Board decisions and notices are available on our Web site at 
``www.stb.dot.gov.''

    Decided: April 12, 2011.


[[Page 21426]]


    By the Board, Rachel D. Campbell, Director, Office of 
Proceedings.
Jeffrey Herzig,
Clearance Clerk.
[FR Doc. 2011-9167 Filed 4-14-11; 8:45 am]
BILLING CODE 4915-01-P