[Code of Federal Regulations] [Title 33, Volume 3] [Revised as of July 1, 2001] From the U.S. Government Printing Office via GPO Access [CITE: 33CFR203.85] [Page 15] TITLE 33--NAVIGATION AND NAVIGABLE WATERS CHAPTER II--CORPS OF ENGINEERS, DEPARTMENT OF THE ARMY PART 203--EMERGENCY EMPLOYMENT OF ARMY AND OTHER RESOURCES, NATURAL DISASTER PROCEDURES--Table of Contents Subpart G--Local Interests Cooperation and Participation Sec. 203.85 Transfer of completed work to local interest. Responsibility for operation and maintenance of completed emergency repair work under Pub. L. 84-99 will be transferred to the responsible local interests in accordance with the applicable procedures for transfer of completed local protection projects (ER 1150-2-301). Detailed instructions and suggestions relative to proper maintenance and operation usually will be furnished as a standard inclosure to a letter notifying the local interests that the work authorized under Pub. L. 84- 99 has been completed. The letter must remind the local interests that they are responsible for satisfactory maintenance of the flood control works in accordance with the terms of the local cooperation agreement. In appropriate cases, use the ``Flood Control Regulation for Maintenance and Operation of Flood Control Works: (33 CFR part 208). If warranted, a full-scale operation and maintenance manual may be furnished. Reporting requirements placed on the local interests will vary according to organization and other circumstances. Regular inspections will be scheduled to verify local maintenance.