                            TITLE 10--ENERGY
 
               CHAPTER II--DEPARTMENT OF ENERGY--CONTINUED
 
PART 605--THE OFFICE OF ENERGY RESEARCH FINANCIAL ASSISTANCE PROGRAM--Table of Contents
 
Sec. 605.19  Continuation funding and reporting requirements.

    (a) A recipient shall periodically report to DOE on the project's 
progress in meeting the project objectives of the award. The following 
types of reports shall be used:
    (1) Progress reports. After issuance of an initial award and if 
future support is recommended, recipients must submit a satisfactory 
progress report in order to receive continuation awards for the 
remainder of the project period. The original and two copies of the 
required report (generally not to exceed two pages per project or task) 
must be submitted to the ER program manager 90 days prior to the 
anticipated continuation funding date and contain the following 
information: on the first page, provide the project title, principal 
investigator/project director name, period of time report covers, name 
and address of recipient organization, DOE award number, the amount of 
unexpended funds, if any, that are anticipated to be left at the end of 
the current budget period, and if the amount exceeds 10 percent of the 
funds available for the budget period, provide information as to why the 
excess funds are anticipated to be available and how they will be used 
in the next budget period. Report should state whether aims have changed 
from original application and if they have, provided revised aims. 
Include results of work to date. Emphasize findings and their 
significance to the field, and any real or anticipated problems. A 
completed budget page must be submitted with the continuation progress 
report when a change to anticipated future costs will exceed 25 percent 
of the original recommended future budget.
    (2) Notice of Energy R&D Project. A Notice of Energy R&D Project, 
DOE Form 1430.22, which summarizes the purpose and scope of the project, 
must be submitted in accordance with the Distribution and Schedule of 
Documents set forth at the end of this section. Copies of the form may 
be obtained from a DOE Contracting Office.
    (3) Special reports. The recipient shall report the following events 
to DOE as soon after they occur as possible:
    (i) Problems, delays, or adverse conditions which will materially 
affect the ability to attain project objectives, or prevent the meeting 
of time schedules and goals. The report must describe the remedial 
action the recipient has taken or plans to take and any action DOE 
should take to alleviate the problems.
    (ii) Favorable developments or events which enable meeting time 
schedules and goals sooner or at less cost than

[[Page 183]]

anticipated or producing more beneficial results than originally 
projected.
    (4) Final report. A final report summarizing the entire 
investigation must be submitted by the recipient within 90 days after 
the final project period ends or the award is terminated. Satisfactory 
completion of an award will be contingent upon the receipt of this 
report. The final report shall follow the same outline as a progress 
report. Manuscripts prepared for publication should be appended.
    (5) Financial status report (FSR) (OMB No. 0348-0039). The FSR is 
required within 90 days after completion of each budget period; for 
budget periods exceeding 12 months, an FSR is also required within 90 
days after this first 12 months unless waived by the Contracting 
Officer.
    (b) DOE may extend the deadline date for any report if the recipient 
submits a written request before the deadline which adequately justifies 
an extension.
    (c) A table summarizing the various types of reports, time for 
submission, number of copies is set forth below. The schedule of reports 
shall be as prescribed in this table, unless the award document 
specifies otherwise.
    (d) DOE review of performance. DOE or its authorized representatives 
may make site visits, at any reasonable time, to review the project. DOE 
may provide such technical assistance as may be requested.
    (e) Subrecipient progress reporting. Recipients may place progress 
reporting requirements on a subrecipient consistent with the provisions 
of this section.

                 Distribution and Schedule of Documents
------------------------------------------------------------------------
                                                               Number of
                                                               copies to
                Type                          When due             be
                                                               submitted
------------------------------------------------------------------------
1. Summary: 200 words on scope and    Immediately after award         3
 purpose (Notice of Energy R&D         and with each
 Project).                             application for
                                       renewal.
2. Renewal..........................  6 months before the             8
                                       project period ends.
3. Progress Report..................  90 days prior to the            3
                                       next budget period (or
                                       as part of a renewal
                                       application).
4. Other progress reports, brief      As deemed appropriate           3
 topical reports, etc. (Designated     by the recipient.
 when significant results develop or
 when work has direct programmatic
 impact).
5. Reprints, Conference papers......  Same as 4 above........         3
6. Final Report.....................  Within 90 days after            3
                                       termination of the
                                       project.
7. Financial Status Report. (FSR)...  Within 90 days after            3
                                       completion of the
                                       project period; for
                                       budget periods
                                       exceeding 12 months an
                                       FSR is also required
                                       within 90 days after
                                       the first 12-month
                                       period.
------------------------------------------------------------------------
Note: Report types 5 and 6 require with submission two copies of DOE
  Form 1332.16, University-Type Contractor and Grantee Recommendations
  for Disposition of Scientific and Technical Document.