[Code of Federal Regulations] [Title 30, Volume 1] [Revised as of July 1, 2002] From the U.S. Government Printing Office via GPO Access [CITE: 30CFR19.13] [Page 127] TITLE 30--MINERAL RESOURCES CHAPTER I--MINE SAFETY AND HEALTH ADMINISTRATION, DEPARTMENT OF LABOR PART 19--ELECTRIC CAP LAMPS--Table of Contents Sec. 19.13 Instructions for handling future changes in lamp design. All approvals are granted with the understanding that the manufacturer will make his lamp according to the drawings which he has submitted to MSHA and which have been considered and included in the approval. Therefore, when he desires to make any change in the design of the lamp, he should first of all obtain MSHA's approval of the change. The procedure is as follows: (a) The manufacturer shall write to Approval and Certification Center, RR 1, Box 251, Industrial Park Road, Triadelphia, WV 26059, requesting an extension of the original approval and stating the change or changes desired. With this letter, the manufacturer should submit a revised drawing or drawings showing the changes in detail, and one of each of the changed lamp parts. (b) MSHA will consider the application and inspect the drawings and parts to determine whether it will be necessary to make any tests. (c) If no tests are necessary, the applicant will be advised of the approval or disapproval of the change by letter from MSHA. (d) If tests are judged necessary, the applicant will be advised of the material that will be required. [Sched. 6D, 4 FR 4003, Sept. 21, 1939, as amended by Supp. 1, 20 FR 2718, Apr. 23, 1955; 43 FR 12314, Mar. 24. 1978; 52 FR 17514, May 8, 1987; 60 FR 35693, July, 11, 1995]