Sec. 203.4  How do the provisions in this part apply to different types of leases and projects?

    The tables in this section summarize how similar provisions of this 
part apply in different situations.
    (a) We require the information elements indicated by an X in the 
following table and described in Secs. 203.51, 203.62, and 203.81 
through 203.89 for applications for royalty relief.

----------------------------------------------------------------------------------------------------------------
                                                                                       Deep water
                                                             End-of-  ------------------------------------------
                   Information elements                        life       Expansion     Pre-act     Development
                                                              lease        project       lease        project
----------------------------------------------------------------------------------------------------------------
(1) Administrative information report.....................         X               X          X               X
(2) Net revenue and relief justification report                    X
 (prescribed format)......................................

[[Page 18]]


(3) Economic viability and relief justification report                             X          X               X
 (Royalty Suspension Viability Program (RSVP) model inputs
 justified with Geological and Geophysical (G&G),
 Engineering, Production, & Cost reports).................
(4) G&G report............................................                         X          X               X
(5) Engineering report....................................                         X          X               X
(6) Production report.....................................                         X          X               X
(7) Deep water cost report................................                         X          X               X
----------------------------------------------------------------------------------------------------------------

(b) We require the confirmation elements indicated by an X in the 
following table and described in Secs. 203.70, 203.81 and 203.90 through 
203.91 to retain royalty relief.

----------------------------------------------------------------------------------------------------------------
                                                                                       Deep water
                                                             End-of-  ------------------------------------------
                   Confirmation elements                       life       Expansion     Pre-act     Development
                                                              lease        project       lease        project
----------------------------------------------------------------------------------------------------------------
(1) Fabricator's confirmation report......................                         X          X               X
(2) Post-production development report approved by an                              X          X               X
 independent certified public accountant (CPA)............
----------------------------------------------------------------------------------------------------------------

(c) The following table indicates by an X, and Secs. 203.50, 203.52, 
203.60 and 203.67 describe, the prerequisites for our approval of your 
royalty relief application.

----------------------------------------------------------------------------------------------------------------
                                                                                       Deep water
                                                             End-of-  ------------------------------------------
                    Approval conditions                        life                     Pre-act     Development
                                                              lease       Expansion      lease        project
----------------------------------------------------------------------------------------------------------------
(1) At least 12 of the last 15 months have the required            X
 level of production......................................
(2) Already producing.....................................         X
(3)A producible well into a reservoir that has not                                 X          X               X
 produced before..........................................
(4) Royalties for qualifying months exceed 75% of net              X
 revenue (NR).............................................
(5) Substantial investment on a pre-Act lease (e.g.,                               X
 platform, subsea template)...............................
(6) Determined to be economic only with relief............                         X          X               X
----------------------------------------------------------------------------------------------------------------

(d) The following table indicates by an X, and Secs. 203.52 and 203.74 
through 203.75 describe, the prerequisites for a redetermination of our 
royalty relief decision.

----------------------------------------------------------------------------------------------------------------
                                                                                       Deep water
                                                             End-of-  ------------------------------------------
                Redetermination conditions                     Life       Expansion     Pre-act     Development
                                                              lease        project       lease        project
----------------------------------------------------------------------------------------------------------------
(1) After 12 months under current rate, criteria same as           X
 for approval.............................................
(2) For material change in geologic data, prices, costs,                           X          X               X
 or available technology..................................
----------------------------------------------------------------------------------------------------------------

(e) The following table indicates by an X, and Secs. 203.53 and 203.69 
describe, the characteristics of approved royalty relief.

----------------------------------------------------------------------------------------------------------------
                                                                                       Deep water
                                                             End-of-  ------------------------------------------
   Relief rate and volume, subject to certain conditions       life       Expansion     Pre-act     Development
                                                              lease        project       lease        project
----------------------------------------------------------------------------------------------------------------
(1) One-half pre-application effective lease rate on the           X
 qualifying amount, 1.5 times pre-application effective
 lease rate on additional production up to twice the
 qualifying amount, and the pre-application effective
 lease rate for any larger volumes........................
(2) Qualifying amount is the average monthly production            X
 for 12 qualifying months.................................
(3) Zero royalty rate on the suspension volume and the                             X          X               X
 original lease rate on additional production.............
(4) Suspension volume is at least 17.5, 52.5 or 87.5                                          X
 million barrels of oil equivalent (MMBOE)................
(5) Suspension volume is at least the minimum set in the                           X                          X
 Notice of Sale, the lease, or the regulations............

[[Page 19]]


(6) Amount needed to become economic......................                         X          X               X
----------------------------------------------------------------------------------------------------------------

(f) The following table indicates by an X, and Secs. 203.54 and 203.78 
describe, circumstances under which we discontinue your royalty relief.

----------------------------------------------------------------------------------------------------------------
                                                                                       Deep water
                                                             End-of-  ------------------------------------------
                 Full royalty resumes when                     life       Expansion     Pre-act     Development
                                                              lease        project       lease        project
----------------------------------------------------------------------------------------------------------------
(1) Average NYMEX price for last 12 months is at least 25          X
 percent above the average for the qualifying months......
(2) Average NYMEX price for last calendar year exceeds $28/                        X          X
 bbl or $3.50/mcf, escalated by the gross domestic product
 (GDP) deflator since 1994................................
(3) Average prices for designated periods exceed levels we                         X                          X
 specify in the Notice of Sale or the lease...............
----------------------------------------------------------------------------------------------------------------

(g) The following table indicates by an X, and Secs. 203.55 and 203.76 
through 203.77 describe, circumstances under which we end or reduce 
royalty relief.

----------------------------------------------------------------------------------------------------------------
                                                                                       Deep water
                                                             End-of-  ------------------------------------------
                Relief withdrawn or reduced                    life       Expansion     Pre-act     Development
                                                              lease        project       lease        project
----------------------------------------------------------------------------------------------------------------
(1) If recipient requests.................................         X               X          X               X
(2) Lease royalty rate is at the effective rate for 12             X
 consecutive months.......................................
(3) Conditions occur that we specified in the approval             X
 letter in individual cases...............................
(4) Recipient does not submit post-production report that                          X          X               X
 compares expected to actual costs........................
(5) Recipient changes development system..................                         X          X               X
(6) Recipient excessively delays starting fabrication.....                         X          X               X
(7) Recipient spends less than 80 percent of proposed pre-                         X          X               X
 production costs prior to start of production............
(8) Amount of relief volume is produced...................                         X          X               X
----------------------------------------------------------------------------------------------------------------