[Code of Federal Regulations]
[Title 32, Volume 4]
[Revised as of July 1, 2002]
From the U.S. Government Printing Office via GPO Access
[CITE: 32CFR650.93]

[Page 321-322]
 
                       TITLE 32--NATIONAL DEFENSE
 
              CHAPTER V--DEPARTMENT OF THE ARMY (CONTINUED)
 
PART 650--ENVIRONMENTAL PROTECTION AND ENHANCEMENT (AR 200-1)--Table of Contents
 
                   Subpart D--Air Pollution Abatement
 
Sec. 650.93  EPA Air Pollution Project review.

    (a) The following type projects require review by the EPA Regional 
administrator for compliance with air pollution control standards prior 
to the initiation of construction:
    (1) Large industrial or manufacturing facilities.
    (2) Certain new parking facilities to be constructed in areas 
covered by Standard Metropolitan Statistical Areas and Transportation 
Control Plans (38 major urban areas) are subject to preconstruction 
review by the EPA Regional Administrator (40 CFR part 52). A review is 
required for parking facilities having a capacity of 250 or more 
vehicles, or where special restrictions are imposed on any additional 
parking. In such instances, an EPA permit must be obtained for new

[[Page 322]]

or modification of existing parking facilities which results in a net 
increase of 250 or more spaces when construction commences after January 
1, 1975 or when a construction contract is signed after January 1, 1975. 
The basic references for State implementation plans and Transportation 
Control Plans are 40 CFR part 51 and 40 CFR part 52 respectively.
    (b) At the request of the installation commander, such reviews may 
be coordinated with the Regional EPA office by the supporting Corps of 
Engineers District Office.