Sec. 651.10  Actions requiring environmental analysis.

    The general types of proposed actions requiring environmental impact 
analysis under NEPA, unless categorically excluded or otherwise included 
in existing NEPA documentation, include:
    (a) Policies, regulations, and procedures (for example, Army and 
installation regulations).
    (b) New management and operational concepts and programs, including 
logistics; RDT&E; procurement; personnel assignment; real property and 
facility management (such as master plans); and environmental programs 
such as Integrated Natural Resource Management Plan (INRMP), Integrated 
Cultural Resources Management Plan (ICRMP), and Integrated Pest 
Management Plan. NEPA requirements may be incorporated into other Army 
plans in accordance with 40 CFR 1506.4.
    (c) Projects involving facilities construction.
    (d) Operations and activities including individual and unit 
training, flight operations, overall operation of installations, or 
facility test and evaluation programs.

[[Page 394]]

    (e) Actions that require licenses for operations or special material 
use, including a Nuclear Regulatory Commission (NRC) license, an Army 
radiation authorization, or Federal Aviation Administration air space 
request (new, renewal, or amendment), in accordance with AR 95-50.
    (f) Materiel development, operation and support, disposal, and/or 
modification as required by DOD 5000.2-R.
    (g) Transfer of significant equipment or property to the ARNG or 
Army Reserve.
    (h) Research and development including areas such as genetic 
engineering, laser testing, and electromagnetic pulse generation.
    (i) Leases, easements, permits, licenses, or other entitlement for 
use, to include donation, exchange, barter, or Memorandum of 
Understanding (MOU). Examples include grazing leases, grants of easement 
for highway right-of-way, and requests by the public to use land for 
special events such as air shows or carnivals.
    (j) Federal contracts, grants, subsidies, loans, or other forms of 
funding such as Government-Owned, Contractor-Operated (GOCO) industrial 
plants or housing and construction via third-party contracting.
    (k) Request for approval to use or store materials, radiation 
sources, hazardous and toxic material, or wastes on Army land. If the 
requester is non-Army, the responsibility to prepare proper 
environmental documentation may rest with the non-Army requester, who 
will provide needed information for Army review. The Army must review 
and adopt all NEPA documentation before approving such requests.
    (l) Projects involving chemical weapons/munitions.