[Code of Federal Regulations]
[Title 44, Volume 1]
[Revised as of October 1, 2002]
From the U.S. Government Printing Office via GPO Access
[CITE: 44CFR72.1]

[Page 368]
 
              TITLE 44--EMERGENCY MANAGEMENT AND ASSISTANCE
 
             CHAPTER I--FEDERAL EMERGENCY MANAGEMENT AGENCY
 
PART 72--PROCEDURES AND FEES FOR PROCESSING MAP CHANGES--Table of Contents
 
Sec. 72.1  Purpose of part.

    This part provides administrative and cost-recovery procedures for 
the engineering review and administrative processing associated with 
FEMA's response to requests for Conditional Letters of Map Amendment 
(CLOMAs), Conditional Letters of Map Revision (CLOMRs), Conditional 
Letters of Map Revision Based on Fill (CLOMR-Fs), Letters of Map 
Revision Based on Fill (LOMR-Fs), Letters of Map Revision (LOMRs), and 
Physical Map Revisions (PMRs). Such requests are based on proposed or 
actual manmade alterations within the floodplain, such as the placement 
of fill; modification of a channel; construction or modification of a 
bridge, culvert, levee, or similar measure; or construction of single or 
multiple residential or commercial structures on single or multiple 
lots.

[62 FR 5736, Feb. 6, 1997]