Sec. 1710.208  RUS criteria for approval of all load forecasts by power supply borrowers and by distribution borrowers required to maintain an approved load 
          forecast on an ongoing basis.

    All load forecasts submitted by power supply borrowers and by 
distribution borrowers required to maintain an approved load forecast 
must satisfy the following criteria:
    (a) The borrower objectively analyzed all known relevant factors 
that influence the consumption of electricity and the known number of 
customers served at the time the study was developed;
    (b) The borrower considered and identified all loads on its system 
of RE Act beneficiaries and non-RE Act beneficiaries;
    (c) The borrower developed an adequate supporting database and 
analyzed a reasonable range of relevant assumptions and alternative 
futures;
    (d) The borrower adopted methods and procedures in general use by 
the electric utility industry to develop its load forecast;
    (e) The borrower used valid and verifiable analytical techniques and 
models;
    (f) The borrower provided RUS with adequate documentation and 
assistance to allow for a thorough and independent review; and
    (g) In the case of a power supply borrower required to maintain an 
approved load forecast on an ongoing basis, the borrower adequately 
coordinated the preparation of the load forecast work plan and load 