[Code of Federal Regulations] [Title 7, Volume 11] [Revised as of January 1, 2003] From the U.S. Government Printing Office via GPO Access [CITE: 7CFR1717.604] [Page 151-152] TITLE 7--AGRICULTURE CHAPTER XVII--RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE PART 1717--POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS--Table of Contents Subpart M--Operational Controls Sec. 1717.604 Long-range engineering plans and construction work plans. (a) All borrowers are required to maintain up-to-date long-range engineering plans and construction work plans (CWPs) in form and substance as set forth in 7 CFR part 1710, subpart F. (b) Applications for financing from RUS must be supported by a long- range engineering plan and CWP approved by RUS. (c) RUS approval is not required for long-range engineering plans and CWPs if the borrower does not intend to seek RUS financing for any of the facilities, equipment or other purposes included [[Page 152]] in those plans. However, if requested by RUS, a borrower must provide an informational copy of such plans to RUS.