[Code of Federal Regulations] [Title 7, Volume 11] [Revised as of January 1, 2003] From the U.S. Government Printing Office via GPO Access [CITE: 7CFR1717.605] [Page 152] TITLE 7--AGRICULTURE CHAPTER XVII--RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE PART 1717--POST-LOAN POLICIES AND PROCEDURES COMMON TO INSURED AND GUARANTEED ELECTRIC LOANS--Table of Contents Subpart M--Operational Controls Sec. 1717.605 Design standards, plans and specifications, construction standards, and RUS accepted materials. All borrowers, regardless of the source of funding, are required to comply with applicable RUS requirements with respect to system design, construction standards, and the use of RUS accepted materials. Borrowers must comply with applicable RUS requirements with respect to plans and specifications only if the construction or procurement will be financed by RUS. These requirements are set forth in other RUS regulations, especially in 7 CFR parts 1724 and 1728.