[Code of Federal Regulations]
[Title 7, Volume 11]
[Revised as of January 1, 2003]
From the U.S. Government Printing Office via GPO Access
[CITE: 7CFR1724.54]

[Page 239-240]
 
                          TITLE 7--AGRICULTURE
 
    CHAPTER XVII--RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE
 
PART 1724--ELECTRIC ENGINEERING, ARCHITECTURAL SERVICES AND DESIGN POLICIES AND PROCEDURES--Table of Contents
 
                    Subpart E--Electric System Design
 
Sec. 1724.54  Requirements for RUS approval of plans and specifications.

    The provisions of this section apply only to RUS financed electric 
system facilities.
    (a) For any contract subject to RUS approval in accordance with part 
1726 of this chapter, the borrower shall obtain RUS approval of the 
plans and specifications, as part of the proposed bid package, prior to 
requesting bids. RUS may require approval of other plans and 
specifications on a case by case basis.
    (b) Distribution lines. RUS approval of the plans and specifications 
for distribution line construction is not required if standard RUS 
drawings, specifications, RUS accepted material, and standard RUS 
contract forms (as required by part 1726 of this chapter) are used. 
Drawings, plans and specifications for nonstandard distribution 
construction must be submitted to RUS and receive approval prior to 
requesting bids on contracts or commencement of force account 
construction.
    (c) Transmission lines. (1) Plans and specifications for 
transmission construction projects which are not based on RUS approved 
line design data or do not use RUS standard structures must receive RUS 
approval prior to requesting bids on contracts or commencement of force 
account construction.
    (2) Unless RUS approval is required by paragraph (a) of this 
section, plans and specifications for transmission construction which 
use previously approved design data and standard structures do not 
require RUS approval. Plans and specifications for related work, such as 
right-of-way clearing, equipment, and materials, do not require RUS 
approval unless required by paragraph (a) of this section.
    (d) Substations. (1)(i) Plans and specifications for all new 
substations must

[[Page 240]]

receive RUS approval prior to requesting bids on contracts or 
commencement of force account construction, unless:
    (A) The substation design has been previously approved by RUS; and
    (B) No significant NESC revisions have occurred.
    (ii) The borrower shall notify RUS in writing that a previously 
approved design will be used, including identification of the previously 
approved design.
    (2) Unless RUS approval is required by paragraph (a) of this 
section, plans and specifications for substation modifications and for 
substations using previously approved designs do not require RUS 
approval.
    (e) Generation facilities. (1) This paragraph (e) covers all 
portions of a generating plant including plant buildings, the generator 
step-up transformer, and the transmission switchyard at a generating 
plant. Warehouses and equipment service buildings not associated with 
generation plants are covered under paragraph (f) of this section.
    (2) The borrower shall obtain RUS approval, prior to issuing 
invitations to bid, of the terms and conditions for all generating plant 
equipment or construction contracts which will cost $1,500,000 or more. 
Unless RUS approval is required by paragraph (a) of this section, plans 
and specifications for generating plant equipment and construction do 
not require RUS approval.
    (f) Headquarters buildings. (1) This paragraph (f) covers office 
buildings, warehouses, and equipment service buildings. Generating plant 
buildings are covered under paragraph (e) of this section.
    (2) Unless RUS approval is required by paragraph (a) of this 
section, plans and specifications for headquarters buildings do not 
require RUS approval. The borrower shall submit two copies of RUS Form 
740g, Application for Headquarters Facilities. This form is available 
from Program Development and Regulatory Analysis, Rural Utilities 
Service, United States Department of Agriculture, Stop 1522, 1400 
Independence Ave., SW., Washington, DC 20250-1522. The application must 
show floor area and estimated cost breakdown between office building 
space and space for equipment warehousing and service facilities, and 
include a one line drawing (floor plan and elevation view), to scale, of 
the proposed building with overall dimensions shown. The information 
concerning the planned building may be included in the borrower's 
construction work plan in lieu of submitting it with the application. 
(See 7 CFR part 1710, subpart F.) Prior to issuing the plans and 
specifications for bid, the borrower shall also submit to RUS a 
statement, signed by the architect or engineer, that the building design 
meets the Uniform Federal Accessibility Standards (See 
Sec. 1724.51(e)(1)(i)).
    (g) Communications and control facilities. (1) This paragraph (g) 
covers microwave and powerline carrier communications systems, load 
control, and supervisory control and data acquisition (SCADA) systems.
    (2) The borrower shall obtain RUS approval, prior to issuing 
invitations to bid, of the terms and conditions for communications and 
control facilities contracts which will cost $500,000 or more. Unless 
RUS approval is required by paragraph (a) of this section, plans and 
specifications for communications and control facilities do not require 
RUS approval.
    (h) Terms and conditions include the RUS standard form of contract, 
general and special conditions, and any other non-technical provisions 
of the contract. Terms and conditions which have received RUS approval 
in connection with a previous contract for a particular borrower are 
considered approved by RUS for that borrower.

[63 FR 35314, June 29, 1998, as amended at 65 FR 63196, Oct. 23, 2000]