                          TITLE 7--AGRICULTURE
 
    CHAPTER XVII--RURAL UTILITIES SERVICE, DEPARTMENT OF AGRICULTURE
 
PART 1794--ENVIRONMENTAL POLICIES AND PROCEDURES--Table of Contents
 
                 Subpart C--Classification of Proposals
 
Sec. 1794.21  Categorically excluded proposals without an ER.

    (a) General. Certain types of actions taken by RUS do not normally 
require an ER. Proposed actions within this classification are:
    (1) The issuance of bulletins and information publications that do 
not concern environmental matters or substantial facility design, 
construction, or maintenance practices;
    (2) Procurement activities related to the operation of RUS;
    (3) Personnel and administrative actions; and
    (4) Repairs made because of an emergency situation to return to 
service damaged facilities of an applicant's system.
    (b) Electric and telecommunications programs. Applications for 
financial assistance for the types of proposed actions listed in this 
paragraph (b) normally do not require the submission of an ER. These 
types of actions are subject to the requirements of Sec. 1794.31. 
Applicants shall sufficiently identify all proposed actions so their 
proper classification can be determined. Detailed descriptions shall be 
provided for each proposal noted in this section. RUS normally requires 
additional information in addition to a description of what is being 
proposed, to ensure that proposals are properly classified. In order to 
provide for extraordinary circumstances, RUS may require development of 
an ER for proposals listed in this section. Proposed actions within this 
classification are:
    (1) Purchase of land where use shall remain unchanged, or the 
purchase of existing water rights where no associated construction is 
involved;
    (2) Additional or substitute financial assistance for proposed 
actions which have previously received environmental review and approval 
from RUS, provided the scope of the proposal and environmental 
considerations have not changed;
    (3) Rehabilitation or reconstruction of transportation facilities 
within existing rights-of-way (ROW) or generating facility sites. A 
description of the rehabilitation or reconstruction shall be provided to 
RUS;
    (4) Changes or additions to microwave sites, substations, switching 
stations, telecommunications switching or multiplexing centers, 
buildings, or small structures requiring new physical disturbance or 
fencing of less than one acre (0.4 hectare). A description of the 
additions or changes and the area to be impacted by the expansion shall 
be provided to RUS;
    (5) Internal modifications or equipment additions (e.g., computer 
facilities, relocating interior walls) to structures or buildings;
    (6) Internal or minor external changes to electric generating or 
fuel processing facilities and related support structures where there is 
negligible impact on the outside environment. A description of the 
changes shall be provided to RUS;
    (7) Ordinary maintenance or replacement of equipment or small 
structures (e.g., line support structures, line transformers, microwave 
facilities, telecommunications remote switching and multiplexing sites);
    (8) The construction of telecommunications facilities within the 
fenced area of an existing substation, switching station, or within the 
boundaries of an existing electric generating facility site. A 
description of the facilities to be constructed shall be provided to 
RUS;
    (9) SCADA and energy management systems involving no new external 
construction;
    (10) Testing or monitoring work (e.g., soil or rock core sampling, 
monitoring wells, air monitoring);
    (11) Studies and engineering undertaken to define proposed actions 
or alternatives sufficiently so that environmental effects can be 
assessed;
    (12) Construction of electric power lines within the fenced area of 
an existing substation, switching station, or within the boundaries of 
an electric generating facility site;
    (13) Contracts for certain items of equipment which are part of a 
proposed action for which RUS is preparing an

[[Page 1137]]

EA or EIS, and which meet the limitations on actions during the NEPA 
process as established in 40 CFR 1506.1(d) and contained in 
Sec. 1794.15(b)(2);
    (14) Rebuilding of power lines or telecommunications cables where 
road or highway reconstruction requires the applicant to relocate the 
lines either within or adjacent to the new road or highway easement or 
right-of-way. A description of the facilities to be constructed shall be 
provided to RUS;
    (15) Phase or voltage conversions, reconductoring or upgrading of 
existing electric distribution lines, or telecommunication facilities. A 
description of the facilities to be constructed shall be provided to 
RUS;
    (16) Construction of new power lines, substations, or 
telecommunications facilities on industrial or commercial sites, where 
the applicant has no control over the location of the new facilities. 
Related off-site facilities would be treated in their normal category. A 
description of the facilities to be constructed shall be provided to 
RUS;
    (17) Participation by an applicant(s) in any proposed action where 
total applicant financial participation will be five percent or less;
    (18) Construction of a battery energy storage system at an existing 
generating station or substation site. A description of the facilities 
to be constructed shall be provided to RUS.
    (19) Additional bulk commodity storage (e.g., coal, fuel oil, 
limestone) within existing generating station boundaries. A 
certification attesting to the current state of compliance of the 
existing facilities and a description of the facilities to be added 
shall be provided to RUS;
    (20) Proposals designed to reduce the amount of pollutants released 
into the environment (e.g., precipitators, baghouse or scrubber 
installations, and coal washing equipment) which will have no other 
environmental impact outside the existing facility site. A description 
of the facilities to be constructed shall be provided to RUS;
    (21) Construction of standby diesel electric generators (one 
megawatt or less total capacity) and associated facilities, for the 
primary purpose of providing emergency power, at an existing applicant 
headquarters or district office, telecommunications switching or 
multiplexing site, or at an industrial, commercial or agricultural 
facility served by the applicant. A description of the facilities to be 
constructed shall be provided to RUS;
    (22) Construction of onsite facilities designed for the transfer of 
ash, scrubber wastes, and other byproducts from coal-fired electric 
generating stations for recycling or storage at an existing coal mine 
(surface or underground). A description of the facilities to be 
constructed shall be provided to RUS;
    (23) Changes or additions to an existing water well system, 
including new water supply wells and associated pipelines within the 
boundaries of an existing well field or generating station site. A 
description of the changes or additions shall be provided; and
    (24) Repowering or uprating of an existing unit(s) at a fossil-
fueled generating station in order to improve the efficiency or the 
energy output of the facility. Repowering or uprating that results in 
increased fuel consumption or the substitution of one fuel combustion 
technology with another is excluded from this classification.
    (c) Water and waste program. Applications for financial assistance 
for certain proposed actions do not normally require the submission of 
an ER. Applicants shall sufficiently identify all proposed actions so 
their proper classification can be determined. These types of actions 
are subject to the requirements of Sec. 1794.31. In order to provide for 
extraordinary circumstances, RUS may require development of an ER for 
proposals listed in this section. Proposed actions within this 
classification are:
    (1) Management actions relating to invitation for bids, award of 
contracts, and the actual physical commencement of construction 
activities;
    (2) Proposed actions that primarily involve the purchase and 
installation of office equipment or motorized vehicles;
    (3) The award of financial assistance for technical assistance, 
planning purposes, environmental analysis, management studies, or 
feasibility studies; and

[[Page 1138]]

    (4) Loan closing and servicing activities that do not alter the 
purpose, operation, location, or design of the proposal as originally 
approved, such as subordinations, amendments and revisions to approved 
actions, and the provision of additional financial assistance for cost 
overruns.