[Code of Federal Regulations] [Title 23, Volume 1] [Revised as of April 1, 2003] From the U.S. Government Printing Office via GPO Access [CITE: 23CFR636.207] [Page 205] TITLE 23--HIGHWAYS CHAPTER I--FEDERAL HIGHWAY ADMINISTRATION, DEPARTMENT OF TRANSPORTATION PART 636--DESIGN-BUILD CONTRACTING--Table of Contents Subpart B--Selection Procedures, Award Criteria Sec. 636.207 Is there a limit on short listed firms? Normally, three to five firms are short listed, however, the maximum number specified shall not exceed five unless you determine, for that particular solicitation, that a number greater than five is in your interest and is consistent with the purposes and objectives of two-phase design-build contracting.