                 TITLE 24--HOUSING AND URBAN DEVELOPMENT
 
CHAPTER IX--OFFICE OF ASSISTANT SECRETARY FOR PUBLIC AND INDIAN HOUSING, 
               DEPARTMENT OF HOUSING AND URBAN DEVELOPMENT
 
PART 901--PUBLIC HOUSING MANAGEMENT ASSESSMENT PROGRAM--Table of Contents
 
Sec. 901.30  Indicator #5, annual inspection of units and systems.

    This indicator examines the percentage of units that a PHA inspects 
on an annual basis in order to determine short-term maintenance needs 
and long-term modernization needs. Implicit in this indicator is the 
adequacy of the PHA's inspection program in terms of the quality of a 
PHA's inspections, and how a PHA tracks both inspections and needed 
repairs. All occupied units are required to be inspected. This indicator 
has a weight of x1.
    (a) Units in the following categories are exempted and not included 
in the calculation of the total number of units, and the number and 
percentage of units inspected. Systems that are a part of individual 
dwelling units that are exempted, or a part of a building where all of 
the dwelling units in the building are exempted, are also exempted from 
the calculation of this indicator:
    (1) Occupied units where the PHA has made two documented attempts to 
inspect, but only if the PHA can document that appropriate legal action 
(up to and including eviction of the legal or illegal occupant(s)), has 
been taken under provisions of the lease to ensure that the unit can be 
subsequently inspected.
    (2) Units vacant for the full immediate past fiscal year for the 
following reasons, as defined at Sec. 901.5:
    (i) Vacant units undergoing modernization; and
    (ii) Vacant units that are documented to be uninhabitable for 
reasons beyond a PHA's control due to:
    (A) High/unsafe levels of hazardous/toxic materials;
    (B) By order of the local health department or a directive of the 
Environmental Protection Agency;
    (C) Natural disasters; and
    (D) Units kept vacant because they became structurally unsound.
    (b) Component 1, annual inspection of units. This component 
refers to an inspection using either the local housing and/or occupancy 
code, or HUD HQS if there is no local code or the local code is less 
stringent that HQS. This component has a weight of x1.

[[Page 237]]

    (1) Grade A: The PHA inspected 100% of its units and, if repairs 
were necessary for local code or HQS compliance, either completed the 
repairs during the inspection; issued work orders for the repairs; or 
referred similar work items to the current year's modernization program, 
or to next year's modernization program if there are less than three 
months remaining before the end of the PHA fiscal year when the 
inspection was completed.
    (2) Grade B: The PHA inspected less than 100% but at least 97% of 
its units and, if repairs were necessary for local code or HQS 
compliance, either completed the repairs during the inspection; issued 
work orders for the repairs; or referred similar work items to the 
current year's modernization program, or to next year's modernization 
program if there are less than three months remaining before the end of 
the PHA fiscal year when the inspection was completed.
    (3) Grade C: The PHA inspected less than 97% but at least 95% of its 
units and, if repairs were necessary for local code or HQS compliance, 
either completed the repairs during the inspection; issued work orders 
for the repairs; or referred similar work items to the current year's 
modernization program, or to next year's modernization program if there 
are less than three months remaining before the end of the PHA fiscal 
year when the inspection was completed.
    (4) Grade D: The PHA inspected less than 95% but at least 93% of its 
units and, if repairs were necessary for local code or HQS compliance, 
either completed the repairs during the inspection; issued work orders 
for the repairs; or referred similar work items to the current year's 
modernization program, or to next year's modernization program if there 
are less than three months remaining before the end of the PHA fiscal 
year when the inspection was completed.
    (5) Grade E: The PHA inspected less than 93% but at least 90% of its 
units and, if repairs were necessary for local code or HQS compliance, 
either completed the repairs during the inspection; issued work orders 
for the repairs; or referred similar work items to the current year's 
modernization program, or to next year's modernization program if there 
are less than three months remaining before the end of the PHA fiscal 
year when the inspection was completed.
    (6) Grade F: The PHA has failed to inspect at least 90% of its 
units; or failed to correct deficiencies during the inspection or issue 
work orders for the repairs; or failed to refer similar work items to 
the current year's modernization program, or to next year's 
modernization program if there are less than three months remaining 
before the end of the PHA fiscal year when the inspection was completed.
    (c) Component 2, annual inspection of systems. This 
component examines the inspection of buildings and sites according to 
the PHA's maintenance plan, including performing the required 
maintenance on structures and systems in accordance with manufacturer's 
specifications and established local/PHA standards, or issuing work 
orders for maintenance/repairs, or including identified deficiencies in 
this year's modernization program, or in next year's modernization 
program if there are less than three months remaining before the end of 
the PHA fiscal year when the inspection was performed. This component 
has a weight of x1.
    (1) Grade A: The PHA inspected all major systems at 100% of its 
buildings and sites, according to its maintenance plan. The inspection 
included performing the required maintenance on structures and systems 
in accordance with manufacturer's specifications and established local/
PHA standards, or issuing work orders for maintenance/repairs, or 
including identified deficiencies in the current year's modernization 
program, or in next year's modernization program if there are less than 
three months remaining before the end of the PHA fiscal year when the 
inspection was performed.
    (2) Grade B: The PHA inspected all major systems of at least a 
minimum of 90% but less than 100% of its buildings and sites, according 
to its maintenance plan. The inspection included performing the required 
maintenance

[[Page 238]]

on structures and systems in accordance with manufacturer's 
specifications and established local/PHA standards, or issuing work 
orders for maintenance/ repairs, or including identified deficiencies in 
the current year's modernization program, or in next year's 
modernization program if there are less than three months remaining 
before the end of the PHA fiscal year when the inspection was performed.
    (3) Grade C: The PHA inspected all major systems of at least a 
minimum of 80% but less than 90% of its buildings and sites, according 
to its maintenance plan. The inspection included performing the required 
maintenance on structures and systems in accordance with manufacturer's 
specifications and established local/PHA standards, or issuing work 
orders for maintenance/ repairs, or including identified deficiencies in 
the current year's modernization program, or in next year's 
modernization program if there are less than three months remaining 
before the end of the PHA fiscal year when the inspection was performed.
    (4) Grade D: The PHA inspected all major systems of at least a 
minimum of 70% but less than 80% of its buildings and sites, according 
to its maintenance plan. The inspection included performing the required 
maintenance on structures and systems in accordance with manufacturer's 
specifications and established local/PHA standards, or issuing work 
orders for maintenance/ repairs, or including identified deficiencies in 
the current year's modernization program, or in next year's 
modernization program if there are less than three months remaining 
before the end of the PHA fiscal year when the inspection was performed.
    (5) Grade E: The PHA inspected all major systems of at least a 
minimum of 60% but less than 70% of its buildings and sites, according 
to its maintenance plan. The inspection included performing the required 
maintenance on structures and systems in accordance with manufacturer's 
specifications and established local/PHA standards, or issuing work 
orders for maintenance/ repairs, or including identified deficiencies in 
the current year's modernization program, or in next year's 
modernization program if there are less than three months remaining 
before the end of the PHA fiscal year when the inspection was performed.
    (6) Grade F: The PHA failed to inspect all major systems of at least 
60% of its buildings and sites and perform the required maintenance on 
these systems in accordance with manufacturers specifications and 
established local/PHA standards, or did not issue work orders for 
maintenance/repairs, or did not include identified deficiencies in the 
current year's modernization program, or in next year's modernization 
program if there are less than three months remaining before the end of 
the PHA fiscal year when the inspection was performed.