Sec. 501.7  Test plans.

    To receive Postal Service approval, a postage meter must be tested. 
Manufacturers of electronic meters must submit a detailed test plan to 
the Postal Service for approval at least 60 days before conducting the 
tests. The test plan must include tests that, if passed by a meter, 
prove compliance by the meter with all postal requirements. The test 
plan must list the parameters to be tested, test equipment, procedures, 
test sample sizes, and test data formats. Also, the plan must include 
detailed descriptions, specifications, design drawings, schematic 
diagrams, and explanations of the purposes of all special test equipment 
and nonstandard or noncommercial instrumentation.