Sec. 240.210-3  Recommended procedures: Operations.

    (a) The facility supervisor should be experienced in the operation 
of the type of facility designed or, in the case of an innovated design, 
be adequately trained by responsible personnel in the operation of the 
facility.
    (b) Alternate and standby disposal and operating procedures should 
be established for implementation during emergencies, air pollution 
episodes, and shutdown periods.
    (c) Upon completion of facility construction, provision should be 
made for instruction of the staff in proper operation and maintenance 
procedures.
    (d) A routine maintenance schedule should be established and 
followed.
    (e) As-built engineering drawings of the facility should be provided 
at the conclusion of construction of the facility. These should be 
updated to show modifications by the owner as changes

[[Page 324]]

are made and should be readily available. A schematic showing the 
relationships of the various subsystems should also be available.
    (f) Key operational procedures should be prominently posted.
    (g) Equipment manuals, catalogs, spare parts lists, and spare parts 
should be readily available at the facility.
    (h) Training opportunities for facility operating personnel should 
be provided.