[Code of Federal Regulations]
[Title 40, Volume 5]
[Revised as of July 1, 2003]
From the U.S. Government Printing Office via GPO Access
[CITE: 40CFR57.703]

[Page 152]
 
                   TITLE 40--PROTECTION OF ENVIRONMENT
 
         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)
 
PART 57--PRIMARY NONFERROUS SMELTER ORDERS--Table of Contents
 
               Subpart G--Compliance Schedule Requirements
 
Sec. 57.703  Compliance with the supplementary control system requirements.

    This section applies to all nonferrous smelters applying for an NSO.
    (a) Schedules for smelters with existing SCS. Each NSO shall require 
immediately upon issuance of the NSO operation of any existing 
supplementary control system and immediately upon the effective date of 
the NSO the assumption of liability for all violations of the NAAQS 
detected by any monitor in the SCS system. Each NSO shall require that 
within six months of the effective date of the NSO the smelter complete 
any measures specified in the smelter's approved SCS development plan 
not implemented at the time the NSO is issued, and assume liability for 
all violations of the NAAQS detected anywhere in the DLA (except as 
provided in subpart D of these regulations). Other requirements of 
subpart D such as the requirements for submission of reports records, 
and for ongoing evaluation of the SCS shall be complied with at the 
times specified in subpart D and Sec. 57.701.
    (b) Compliance schedule for smelters with no existing SCS system. 
Where a smelter has no SCS at the time of issuance of the NSO, the NSO 
shall require compliance with the requirements of subpart D according to 
the following schedule:
    (1) Within six months after the effective date of the NSO the 
smelter shall install all operating elements of the SCS system, begin 
operating the system, complete all other measures specified in its 
approved SCS development plan, begin compliance with the requirements of 
Sec. 57.404, and assume liability for any violations of the NAAQS within 
its designated liability area (except as provided by subpart D), 
detected by the SCS monitors in place.
    (2) Within nine months thereafter the smelter shall submit the SCS 
Report, assume liability for all violations of the NAAQS detected 
anywhere within its designated liability area, and comply with all other 
requirements of subpart D, except for those which subpart D specifies 
are to be satisfied at or after the close of such nine-month period, 
including requirements for submission of studies, reports, and records, 
and the requirements for continued review and evaluation of the SCS.