[Code of Federal Regulations]
[Title 40, Volume 11]
[Revised as of July 1, 2003]
From the U.S. Government Printing Office via GPO Access
[CITE: 40CFR63.1210]

[Page 58-59]
 
                   TITLE 40--PROTECTION OF ENVIRONMENT
 
         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)
 
PART 63--NATIONAL EMISSION STANDARDS FOR HAZARDOUS AIR POLLUTANTS FOR SOURCE CATEGORIES--Table of Contents
 
 Subpart EEE--National Emission Standards for Hazardous Air Pollutants 
                     from Hazardous Waste Combustors
 
Sec. 63.1210  What are the notification requirements?

    (a) Summary of requirements. (1) You must submit the following 
notifications to the Administrator:

------------------------------------------------------------------------
               Reference                           Notification
------------------------------------------------------------------------
63.9(b)................................  Initial notifications that you
                                          are subject to Subpart EEE of
                                          this Part.
63.9(d)................................  Notification that you are
                                          subject to special compliance
                                          requirements.
63.9(j)................................  Notification and documentation
                                          of any change in information
                                          already provided under Sec. 63.9.
63.1206(b)(5)(i).......................  Notification of changes in
                                          design, operation, or
                                          maintenance.
63.1207(e), 63.9(e), 63.9(g)(1) and (3)  Notification of performance
                                          test and continuous monitoring
                                          system evaluation, including
                                          the performance test plan and
                                          CMS performance
                                          evaluationplan.\1\
63.1210(b), 63.1207(j), 63.1207(k),      Notification of compliance,
 63.1207(l), 63.9(h), 63.10(d)(2),        including results of
 63.10(e)(2).                             performance tests and
                                          continuous monitoring system
                                          performance evaluations.
------------------------------------------------------------------------
\1\ You may also be required on a case-by-case basis to submit a
  feedstream analysis plan under Sec. 63.1209(c)(3).

    (2) You must submit the following notifications to the Administrator 
if you request or elect to comply with alternative requirements:

------------------------------------------------------------------------
                                              Notification, request,
               Reference                     petition, or application
------------------------------------------------------------------------
63.9(i)................................  You may request an adjustment
                                          to time periods or postmark
                                          deadlines for submittal and
                                          review of required
                                          information.
63.10(e)(3)(ii)........................  You may request to reduce the
                                          frequency of excess emissions
                                          and CMS performance reports.
63.10(f)...............................  You may request to waive
                                          recordkeeping or reporting
                                          requirements.
63.1204(d)(2)(iii).....................  Notification that you elect to
                                          comply with the emission
                                          averaging requirements for
                                          cement kilns with in-line raw
                                          mills.
63.1204(e)(2)(iii).....................  Notification that you elect to
                                          comply with the emission
                                          averaging requirements for
                                          preheater or preheater/
                                          precalciner kilns with dual
                                          stacks.
63.1206(b)(4), 63.1213, 63.6(i),         You may request an extension of
 63.9(c).                                 the compliance date for up to
                                          one year.
63.1206(b)(5)(i)(C)....................  You may request to burn
                                          hazardous waste for more than
                                          720 hours and for purposes
                                          other than testing or
                                          pretesting after making a
                                          change in the design or
                                          operation that could affect
                                          compliance with emission
                                          standards and prior to
                                          submitting a revised
                                          Notification of Compliance.
63.1206(b)(8)(iii)(B)..................  If you elect to conduct
                                          particulate matter CEMS
                                          correlation testing and wish
                                          to have federal particulate
                                          matter and opacity standards
                                          and associated operating
                                          limits waived during the
                                          testing, you must notify the
                                          Administrator by submitting
                                          the correlation test plan for
                                          review and approval.
63.1206(b)(8)(v).......................  You may request approval to
                                          have the particulate matter
                                          and opacity standards and
                                          associated operating limits
                                          and conditions waived for more
                                          than 96 hours for a
                                          correlation test.
63.1206(b)(9)..........................  Owners and operators of
                                          lightweight aggregate kilns
                                          may request approval of
                                          alternative emission standards
                                          for mercury, semivolatile
                                          metal, low volatile metal, and
                                          hydrochloric acid/chlorine gas
                                          under certain conditions.
63.1206(b)(10).........................  Owners and operators of cement
                                          kilns may request approval of
                                          alternative emission standards
                                          for mercury, semivolatile
                                          metal, low volatile metal, and
                                          hydrochloric acid/chlorine gas
                                          under certain conditions.
63.1206(b)(14).........................  Owners and operators of
                                          incinerators may elect to
                                          comply with an alternative to
                                          the particulate matter
                                          standard.
63.1206(b)(15).........................  Owners and operators of cement
                                          and lightweight aggregate
                                          kilns may request to comply
                                          with the alternative to the
                                          interim standards for mercury.

[[Page 59]]


63.1206(c)(2)(ii)(C)...................  You may request to make changes
                                          to the startup, shutdown, and
                                          malfunction plan.
63.1206(c)(5)(i)(C)....................  You may request an alternative
                                          means of control to provide
                                          control of combustion system
                                          leaks.
63.1206(c)(5)(i)(D)....................  You may request other
                                          techniques to prevent fugitive
                                          emissions without use of
                                          instantaneous pressure limits.
63.1207(c)(2)..........................  You may request to base initial
                                          compliance on data in lieu of
                                          a comprehensive performance
                                          test.
63.1207(d)(3)..........................  You may request more than 60
                                          days to complete a performance
                                          test if additional time is
                                          needed for reasons beyond your
                                          control.
63.1207(e)(3), 63.7(h).................  You may request a time
                                          extension if the Administrator
                                          fails to approve or deny your
                                          test plan.
63.1207(h)(2)..........................  You may request to waive
                                          current operating parameter
                                          limits during pretesting for
                                          more than 720 hours.
63.1207(f)(1)(ii)(D)...................  You may request a reduced
                                          hazardous waste feedstream
                                          analysis for organic hazardous
                                          air pollutants if the reduced
                                          analysis continues to be
                                          representative of organic
                                          hazardous air pollutants in
                                          your hazardous waste
                                          feedstreams.
63.1207(g)(2)(v).......................  You may request to operate
                                          under a wider operating range
                                          for a parameter during
                                          confirmatory performance
                                          testing.
63.1207(i).............................  You may request up to a one-
                                          year time extension for
                                          conducting a performance test
                                          (other than the initial
                                          comprehensive performance
                                          test) to consolidate testing
                                          with other state or federally-
                                          required testing.
63.1207(j)(4)..........................  You may request more than 90
                                          days to submit a Notification
                                          of Compliance after completing
                                          a performance test if
                                          additional time is needed for
                                          reasons beyond your control.
63.1207(l)(3)..........................  After failure of a performance
                                          test, you may request to burn
                                          hazardous waste for more than
                                          720 hours and for purposes
                                          other than testing or
                                          pretesting.
63.1209(a)(5), 63.8(f).................  You may request: (A.) Approval
                                          of alternative monitoring
                                          methods for compliance with
                                          standards that are monitored
                                          with a CEMS; and (B.)
                                          approvalto use a CEMS in lieu
                                          of operating parameter limits.
63.1209(g)(1)..........................  You may request approval of:
                                          (A.) Alternative monitoring
                                          methods, except for standards
                                          that you must monitor with a
                                          continuous emission monitoring
                                          system (CEMS) and except for
                                          requests to use a CEMS in lieu
                                          of operating parameter limits;
                                          or (B.) a waiver of an
                                          operating parameter limit.
63.1209(l)(1)..........................  You may request to extrapolate
                                          mercury feedrate limits.
63.1209(n)(2)(ii)......................  You may request to extrapolate
                                          semivolatile and low volatile
                                          metal feedrate limits.
63.1211(d).............................  You may request to use data
                                          compression techniques to
                                          record data on a less frequent
                                          basis than required by Sec.
                                          63.1209.
------------------------------------------------------------------------

    (b) Notification of compliance. (1) The Notification of Compliance 
status requirements of Sec. 63.9(h) apply, except that:
    (i) The notification is a Notification of Compliance, rather than 
compliance status;
    (ii) The notification is required for the initial comprehensive 
performance test and each subsequent comprehensive and confirmatory 
performance test; and
    (iii) You must postmark the notification before the close of 
business on the 90th day following completion of relevant compliance 
demonstration activity specified in this subpart rather than the 60th 
day as required by Sec. 63.9(h)(2)(ii).
    (2) Upon postmark of the Notification of Compliance, the operating 
parameter limits identified in the Notification of Compliance, as 
applicable, shall be complied with, the limits identified in the 
Documentation of Compliance or a previous Notification of Compliance are 
no longer applicable.
    (3) The Notification of Compliance requirements of Sec. 63.1207(j) also 
apply.

[64 FR 53038, Sept. 30, 1999, as amended at 64 FR 63211, Nov. 19, 1999; 
65 FR 42301, July 10, 2000; 66 FR 24272, May 14, 2001; 67 FR 6992, Feb. 
14, 2002]