[Code of Federal Regulations]
[Title 40, Volume 13]
[Revised as of January 1, 2003]
From the U.S. Government Printing Office via GPO Access
[CITE: 40CFR65.107]

[Page 78-80]
 
                TITLE 40 - PROTECTION OF ENVIRONMENT
 
      CHAPTER I - ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)
 
PART 65 - CONSOLIDATED FEDERAL AIR RULE--Table of Contents
 
                    Subpart F - Equipment Leaks
 
Sec. 65.107  Standards: Pumps in light liquid service.

    (a) Compliance schedule. The owner or operator shall comply with 
this section no later than the implementation date specified in 
Sec. 65.1(f).
    (b) Leak detection. Unless otherwise specified in Sec. 
65.102(b) or paragraph (e) of this section, the owner or operator shall 
monitor each pump to detect leaks and shall comply with all other 
provisions of this section.
    (1) Monitoring method. The pumps shall be monitored monthly to 
detect leaks by the method specified in Sec. 65.104(b) and 
(c).
    (2) Instrument reading that defines a leak. The following leak 
definitions determined through instrument readings apply:
    (i) 5,000 parts per million or greater for pumps handling 
polymerizing monomers;
    (ii) 2,000 parts per million or greater for pumps in food/medical 
service; and
    (iii) 1,000 parts per million or greater for all other pumps.
    (3) Leak repair exception. For pumps to which a 1,000 parts per 
million leak definition applies, repair is not required unless an 
instrument reading of 2,000 parts per million or greater is detected.
    (4) Visual inspection. Each pump shall be checked by visual 
inspection each calendar week for indications of liquids dripping from 
the pump seal. The owner or operator shall document that the inspection 
was conducted and the date of the inspection. If there are indications 
of liquids dripping from the pump seal at the time of the weekly 
inspection, the owner or operator shall comply with either of the 
following procedures:
    (i) The owner or operator shall monitor the pump as specified in 
Sec. 65.104(b) and (c) unless the pump has already been 
monitored since the last routine monthly monitoring required by 
paragraph (b)(1) of this section. If monitoring is performed and the 
instrument reading indicates a leak as specified in paragraph (b)(2) of 
this section, a leak is detected and the leak shall be repaired using 
the procedures in Sec. 65.105, except as specified in 
paragraph (b)(3) of this section; or
    (ii) The owner or operator shall eliminate the visual indications of 
liquids dripping.
    (c) Percent leaking pumps calculation. (1) The owner or operator 
shall decide

[[Page 79]]

no later than the implementation date of this part or upon revision of 
an operating permit whether to calculate percent leaking pumps on a 
process unit basis or group of process units basis. Once the owner or 
operator has decided, all subsequent percentage calculations shall be 
made on the same basis.
    (2) If, when calculated on a 6-month rolling average, at least the 
greater of either 10 percent of the pumps in a process unit or three 
pumps in a process unit leak, the owner or operator shall implement a 
quality improvement program for pumps that complies with the 
requirements of Sec. 65.116.
    (3) The number of pumps at a process unit shall be the sum of all 
the pumps in regulated material service, except that pumps found leaking 
in a continuous process unit within 1 month after startup of the pump 
shall not count in the percent leaking pumps calculation for that one 
monitoring period only.
    (4) Percent leaking pumps shall be determined by Equation 107-1 of 
this section:
[GRAPHIC] [TIFF OMITTED] TR14DE00.021

Where:

%PL = Percent leaking pumps.
PL = Number of pumps found leaking as determined through 
monthly monitoring as required in paragraph (b)(1) of this section.
PS = Number of pumps leaking within 1 month of startup during 
the current monitoring period.
PT = Total pumps in regulated material service, including 
those meeting the criteria in paragraphs (e)(1), (e)(2), (e)(3), and 
(e)(6) of this section.

    (d) Leak repair. If a leak is detected pursuant to paragraph (b) of 
this section, then the leak shall be repaired using the procedures in 
Sec. 65.105, as applicable.
    (e) Special provisions for pumps. - (1) Dual mechanical 
seal pumps. Each pump equipped with a dual mechanical seal system that 
includes a barrier fluid system is exempt from the requirements of 
paragraph (b) of this section, provided the requirements specified in 
paragraphs (e)(1)(i) through (viii) of this section are met.
    (i) The owner or operator determines, based on design considerations 
and operating experience, criteria applicable to the presence and 
frequency of drips and to the sensor that indicates failure of the seal 
system, the barrier fluid system, or both. The owner or operator shall 
keep records of the design criteria and an explanation of the design 
criteria, and any changes to these criteria and the reasons for the 
changes.
    (ii) Each dual mechanical seal system shall meet the following three 
requirements:
    (A) Operated with the barrier fluid at a pressure that is at all 
times (except periods of start-up, shutdown, or malfunction) greater 
than the pump stuffing box pressure; or
    (B) Equipped with a barrier fluid degassing reservoir that is routed 
to a process or fuel gas system or connected by a closed vent system to 
a control device that complies with the requirements of Sec. 
65.115; or
    (C) Equipped with a closed-loop system that purges the barrier fluid 
into a process stream.
    (iii) The barrier fluid is not in light liquid service.
    (iv) Each barrier fluid system is equipped with a sensor that will 
detect failure of the seal system, the barrier fluid system, or both.
    (v) Each pump is checked by visual inspection each calendar week for 
indications of liquids dripping from the pump seal. The owner or 
operator shall document that the inspection was conducted and the date 
of the inspection. If there are indications of liquids dripping from the 
pump seal at the time of the weekly inspection, the owner or operator 
shall follow either one of the following procedures prior to the next 
required inspection:
    (A) The owner or operator shall monitor the pump as specified in 
Sec. 65.104(b) and (c) to determine if there is a leak of 
regulated material in the barrier

[[Page 80]]

fluid. If an instrument reading of 1,000 parts per million or greater is 
measured, a leak is detected and it shall be repaired using the 
procedures in Sec. 65.105; or
    (B) The owner or operator shall eliminate the visual indications of 
liquids dripping.
    (vi) If indications of liquids dripping from the pump seal exceed 
the criteria established in paragraph (e)(1)(i) of this section, or if 
based on the criteria established in paragraph (e)(1)(i) of this section 
the sensor indicates failure of the seal system, the barrier fluid 
system, or both, a leak is detected.
    (vii) Each sensor as described in paragraph (e)(1)(iv) of this 
section is observed daily or is equipped with an alarm unless the pump 
is located within the boundary of an unmanned plant site.
    (viii) When a leak is detected pursuant to paragraph (e)(1)(vi) of 
this section, it shall be repaired as specified in Sec. 
65.105.
    (2) No external shaft. Any pump that is designed with no externally 
actuated shaft penetrating the pump housing is exempt from the 
requirements of paragraph (b) of this section.
    (3) Routed to a process or fuel gas system or equipped with a closed 
vent system. Any pump that is routed to a process or fuel gas system or 
equipped with a closed vent system that captures and transports leakage 
from the pump to a control device meeting the requirements of 
Sec. 65.115 is exempt from the requirements of paragraph (b) 
of this section.
    (4) Unmanned plant site. Any pump that is located within the 
boundary of an unmanned plant site is exempt from the weekly visual 
inspection requirement of paragraphs (b)(4) and (e)(1)(v) of this 
section and the daily requirements of paragraph (e)(1)(vii) of this 
section provided that each pump is visually inspected as often as 
practical and at least monthly.
    (5) Ninety percent exemption. If more than 90 percent of the pumps 
at a process unit meet the criteria in either paragraph (e)(1) or (2) of 
this section, the process unit is exempt from the percent leaking 
calculation in paragraph (c) of this section.
    (6) Unsafe-to-monitor pumps. Any pump that is designated as 
described in Sec. 65.103(c)(1) as an unsafe-to-monitor pump is 
exempt from the requirements of paragraph (b) of this section, the 
monitoring and inspection requirements of paragraphs (e)(1)(v) through 
(viii) of this section, and the owner or operator shall monitor and 
repair the pump according to the written plan specified in 
Sec. 65.103(c)(4).