Sec. 72.42  Phase I extension plans.

    (a) Applicability. (1) This section shall apply to any designated 
representative seeking a 2-year extension of the deadline for meeting 
Phase I sulfur dioxide emissions reduction requirements at any of the 
following types of units by applying for allowances from the Phase I 
extension reserve:
    (i) A unit listed in table 1 of Sec. 73.10(a) of this chapter;
    (ii) A unit designated as a substitution unit in accordance with 
Sec. 72.41; or
    (iii) A unit designated as a compensating unit in accordance with 
Sec. 72.43, except a compensating unit that is a new unit.
    (2) A unit for which a Phase I extension is sought shall be either:
    (i) A control unit, which shall be a unit under paragraph (a)(1) of 
this section and at which qualifying Phase I technology shall commence 
operation on or after November 15, 1990 but not later than December 31, 
1996; or
    (ii) A transfer unit, which shall be a unit under paragraph 
(a)(1)(i) of this section and whose Phase I emissions reduction 
obligation shall be transferred in whole or in part to one or more 
control units.
    (3) A Phase I extension does not exempt the owner or operator for 
any unit governed by the Phase I extension plan from the requirement to 
comply with such unit's Acid Rain emissions limitations for sulfur 
dioxide.
    (b) To apply for a Phase I extension:
    (1) The designated representative for each source with a control 
unit may submit an early ranking application for a Phase I extension 
plan in person, beginning on the 40th day after publication of this 
subpart in the Federal Register, between the hours of 9 a.m. and 5 p.m. 
Eastern Standard Time at Acid Rain Division, Attn: Early Ranking, U.S. 
Environmental Protection Agency, 501 3rd Street NW., 4th floor, 
Washington, DC; or send the application by regular mail, certified mail, 
or overnight delivery service to Acid Rain Division, Attn: Early 
Ranking, U.S. Environmental Protection Agency, 6204 J, 1200 Pennsylvania 
Ave., NW., Washington, DC 20460.
    (2) By February 15, 1993:
    (i) The designated representative for each source with a control 
unit shall submit a Phase I extension plan as a part of the Acid Rain 
permit application for the source, and
    (ii) The designated representative for each source with a unit 
designated as a transfer unit in any plan submitted under paragraph 
(b)(2)(i) of this section shall incorporate in the Acid Rain permit 
application each such plan.
    (c) Contents of early ranking application. A complete early ranking 
application shall include the following elements in a format prescribed 
by the Administrator:
    (1) Identification of each control unit. All control units in an 
application must be located at the same

[[Page 55]]

source. If the control unit is not a unit under paragraph (a)(1)(i) of 
this section, a substitution plan or a reduced utilization plan 
governing the unit shall be submitted by the deadline for submitting a 
Phase I permit application.
    (2) Identification of each transfer unit. A unit shall not be a 
transfer unit in more than one early ranking application.
    (3) For each control and transfer unit, the total tonnage of sulfur 
dioxide emitted in 1988 plus the total tonnage of sulfur dioxide emitted 
in 1989, divided by 2. The 1988 and 1989 tonnage figures shall be 
consistent with the data filed on EIA form 767 for those years and the 
conversion methodology specified in appendix B of this part.
    (4) For each control and transfer unit:
    (i) The projected annual utilization (in mmBtu) for 1995 multiplied 
by the projected uncontrolled emissions rate (i.e., the emissions rate 
in the absence of title IV of the Act) for 1995 (in lbs/mmBtu), divided 
by 2000 lbs/ton.
    (ii) The projected annual utilization (in mmBtu) for 1996 multiplied 
by the projected uncontrolled emissions rate (i.e., the emissions rate 
in the absence of title IV of the Act) for 1996 (in lbs/mmBtu), divided 
by 2000 lbs/ton.
    (5) For each control and transfer unit, the number of Phase I 
extension reserve allowances requested for 1995 and for 1996, not to 
exceed the difference between:
    (i) The lesser of the value for the unit under paragraph (c)(3) of 
this section and the value for the unit for that year under paragraph 
(c)(4) of this section, and
    (ii) Each unit's baseline multiplied by 2.5 lb/mmBtu, divided by 
2000 lbs/ton.
    (6) Documentation that the annual emissions reduction obligations 
transferred from all transfer units to all control units do not exceed 
those authorized under this section, as follows:
    (i) For each control unit, the difference, calculated separately for 
1995 and 1996, between:
    (A) The control unit's allowance allocation in table 1 of 
Sec. 73.10(2) of this chapter, the allocation under Sec. 72.41 if the 
control unit is a substitution unit, or the allocation under Sec. 72.43 
if the control unit is a compensating unit; and
    (B) The projected emissions resulting from 90% control after 
installing the qualifying Phase I technology, i.e., 10% of the projected 
uncontrolled emissions for the control unit for the year in accordance 
with paragraph (c)(4) of this section.
    (ii) The sum, by year, of the results under paragraph (c)(6)(i) of 
this section for all control units.
    (iii) The sum, by year, of Phase I extension reserve allowances 
requested for all transfer units.
    (iv) A showing that, for each year, the sum under paragraph 
(c)(6)(ii) of this section is greater than or equal to the sum under 
paragraph (c)(6)(iii) of this section.
    (7) For each control and transfer unit, the projected controlled 
emissions for 1997, for 1998, and for 1999 calculated as follows:
    Projected annual utilization (in mmBtu) multiplied by the projected 
controlled emission rate (in lbs/mmBtu), divided by 2000 lbs/ton.\1\
---------------------------------------------------------------------------

    \1\ In the case of a transfer unit that shares a common stack with a 
unit not listed in table 1 of Sec. 73.10(a) of this chapter and whose 
emissions of sulfur dioxide are not monitored separately or apportioned 
in accordance with part 75 of this chapter, the projected figures for 
the transfer unit under paragraph (c)(7) of this section must be for the 
units combined.
---------------------------------------------------------------------------

    (8) For each control unit, the number of Phase I extension reserve 
allowances requested for 1997, for 1998, and for 1999, calculated as 
follows:
    The unit's baseline multiplied by 1.2 lbs/mmBtu and divided by 2000 
lbs/ton, minus the projected controlled emissions (in tons/yr) under 
paragraph (c)(7) of this section for the given year.
    (9) The total of Phase I extension reserve allowances requested for 
all units in the plan for 1995 through 1999.
    (10) With regard to each executed contract for the design 
engineering and construction of qualifying Phase I technology at each 
control unit governed by the early ranking application, either a copy of 
the contract or a certification that the contract is on site at the 
source and will be submitted to

[[Page 56]]

the Administrator upon written request. The contract or contracts may be 
contingent on the Administrator approving the Phase I extension plan.
    (11) For each contract for which a certification is submitted under 
paragraph (c)(10) of this section, a binding letter agreement, signed 
and dated by each party and specifying:
    (i) The type of qualifying Phase I technology to which the contract 
applies;
    (ii) The parties to the contract;
    (iii) The date each party executed the contracts;
    (iv) The unit to which the contract applies;
    (v) A brief list identifying each provision of the contract;
    (vi) Any dates to which the parties agree, including construction 
completion date; and
    (vii) The total dollar amount of the contract.
    (12) A vendor certification of the sulfur dioxide removal efficiency 
guaranteed to be achievable by the qualifying Phase I technology for the 
type and range of fossil fuels (before any treatment prior to 
combustion) that will be used at the control unit; provided that a 
vendor certification shall not be a defense against a control unit's 
failure to achieve 90% control of sulfur dioxide.
    (13) The date (not later than December 31, 1996) on which the owners 
and operators plan to commence operation of the qualifying Phase I 
technology.
    (14) The special provisions of paragraph (f) of this section.
    (d) Contents of Phase I extension plan. A complete Phase I extension 
plan shall include the following elements in a format prescribed by the 
Administrator:
    (1) Identification of each unit in the plan.
    (2)(i) A statement that the elements in the Phase I extension plan 
are identical to those in the previously submitted early ranking 
application for the plan and that such early ranking application is 
incorporated by reference; or
    (ii) All elements that are different from those in the previously 
submitted early ranking application for the plan and a statement that 
the early ranking application is incorporated by reference as modified 
by the newly submitted elements; provided that the Phase I extension 
plan shall not add any new control units or increase the total Phase I 
extension allowances requested; or
    (iii) All elements required for an early ranking application and a 
statement that no early ranking application for the plan was submitted.
    (e) Administrator's action. (1) Early ranking applications. (i) The 
Administrator may approve in whole or in part or with changes or 
conditions, as appropriate, or disapprove an early ranking application.
    (ii) The Administrator will act on each early ranking application in 
the order of receipt.
    (iii) The Administrator will determine the order of receipt by the 
following procedures:
    (A) Hand-delivered submissions and mailed submissions will be deemed 
to have been received on the date they are received by the 
Administrator; provided that all submissions received by the 
Administrator prior to the 40th day after publication of this subpart in 
the Federal Register will be deemed received on the 40th day.
    (B) All submissions received by the Administrator on the same day 
will be deemed to have been received simultaneously.
    (C) The order of receipt of all submissions received simultaneously 
will be determined by a public lottery if allocation of Phase I 
extension reserve allowances to each of the simultaneous submissions 
would result in oversubscription of the Phase I extension reserve.
    (iv) Based on the allowances requested under paragraph (c)(9) of 
this section, as adjusted by the Administrator in approving the early 
ranking application, the Administrator will award Phase I extension 
reserve allowances for each complete early ranking application to the 
extent that allowances that have not been awarded remain in the Phase I 
extension reserve at the time the Administrator acts on the application. 
The allowances will be awarded in accordance with the procedures set 
forth the allocation of reserve allowances in paragraph (e)(3) of this 
section.

[[Page 57]]

    (v) The Administrator's action on an early ranking application shall 
be conditional on the Administrator's action on a timely and complete 
Acid Rain permit application that includes a complete Phase I extension 
plan and, where the plan includes a unit under paragraph (a)(1) (ii) and 
(iii) of this section, a complete substitution plan or reduced 
utilization plan, as appropriate.
    (vi) Not later than 15 days after receipt of each early ranking 
application, the Administrator will notify, in writing, the designated 
representative of each application of the date that the early ranking 
application was received and one of the following:
    (A) The award of allowances if the application was complete and the 
Phase I extension reserve as not oversubscribed;
    (B) A determination that the application was incomplete and is 
disapproved; or
    (C) If the Phase I extension reserve was oversubscribed, a list of 
the applications received on that date, the number of Phase I extension 
allowances requested in each application, and the date, time, and 
location of a lottery to determine the order of receipt for all 
applications received on that date.
    (vii) The date of a lottery for all applications received on a given 
day will not be earlier than 15 days after the Administrator notifies 
each designated representative whose applications were received on that 
date.
    (viii) Any early ranking application may be withdrawn from the 
lottery if a letter signed by the designated representative of each unit 
governed by the application and requesting withdrawal is received by the 
Administrator before the lottery takes place.
    (2) Phase I extension plans. (i) The Administrator will act on each 
Phase I extension plan in the order that the early ranking application 
for that plan was received or, if no early ranking application was 
received, in the order that the Phase I extension plan was received, as 
determined under paragraph (e)(1)(iii) of this section.
    (ii) Based on the allowances requested under paragraph (c)(9) of 
this section, as adjusted under paragraph (d) of this section and by the 
Administrator in approving the Phase I extension plan, the Administrator 
will allocate Phase I extension reserve allowances to the Allowance 
Tracking System account of each control and transfer unit upon issuance 
of an Acid Rain permit containing the approved Phase I extension plan. 
The allowances will be allocated using the procedures set forth in 
paragraph (e)(3) of this section.
    (iii) The Administrator will not approve a Phase I extension plan, 
even if it meets the requirements of this section, unless unallocated 
allowances remain in the Phase I extension reserve at the time the 
Administrator acts on the plan.
    (3) Allowance allocations. In addition to any allowances allocated 
in accordance with table 1 of Sec. 73.10(a) of this chapter and other 
approved compliance options, the Administrator will allocate Phase I 
extension reserve allowances to each eligible unit in a Phase I 
extension plan in the following order.
    (i) For 1995, to each control unit in the order in which it is 
listed in the plan and then to each transfer unit in the order in which 
it is listed.
    (ii) For 1996, to each control unit in the order in which it is 
listed in the plan and then to each transfer unit in the order in which 
it is listed.
    (iii) For 1997, to each control unit in the order in which it is 
listed in the plan, then likewise for 1998, and then likewise for 1999.
    (iv) The Administrator will allocate any Phase I extension reserve 
allowances returned to the Administrator to the next Phase I extension 
plan, in the rank order established under paragraph (e)(1)(iii) of this 
section, that continues to meet the requirements of this section and 
this part.
    (f) Special provisions--(1) Emissions Limitations--(i) Sulfur 
Dioxide.(A) If a control or transfer unit governed by an approved Phase 
I extension plan emits in 1997, 1998, or 1999 sulfur dioxide in excess 
of the projected controlled emissions for the unit specified for the 
year under paragraph (c)(7) of this section as adjusted under paragraph 
(d) of this section and by the Administrator in approving the Phase I 
extension plan, the Administrator will deduct allowances equal to such 
exceedence from

[[Page 58]]

the unit's annual allowance allocation in the following calendar 
year.\2\
---------------------------------------------------------------------------

    \2\ In the case of a transfer unit that shares a common stack with a 
unit not listed in table 1 of Sec. 73.10(a) of this chapter where the 
units are not monitored separately or apportioned in accordance with 
part 75 of this chapter, the combined emissions of both units will be 
deemed to be the transfer unit's emissions for purposes of applying 
paragraph (f)(1)(i) of this section.
---------------------------------------------------------------------------

    (B) Failure to demonstrate at least a 90% reduction of sulfur 
dioxide in 1997, 1998, or 1999 in accordance with part 75 of this 
chapter at a control unit governed by an approved Phase I extension plan 
shall be a violation of this section. In the event of any such 
violation, in addition to any other liability under the Act, the 
Administrator will deduct allowances from the control unit's compliance 
subaccount for the year of the violation. The deduction will be 
calculated as follows:

Allowances deducted = (1 - (percent reduction achieved [middot] 90%)) x 
    Phase I extension reserve allowances received

where:

``Percent reduction achieved'' is the percent reduction determined in 
accordance with part 75 of this chapter.
``Phase I extension reserve allowances received'' is the number of Phase 
I extension reserve allowances allocated for the year under paragraph 
(e)(2)(ii) of this section.

    (ii) Nitrogen Oxides.
    (A) Beginning on January 1, 1997, each control and transfer unit 
shall be subject to the Acid Rain emissions limitations for nitrogen 
oxides.
    (B) Notwithstanding paragraph (f)(1)(ii)(A) of this section, a 
transfer unit shall be subject to the Acid Rain emissions limitations 
for nitrogen oxides, under section 407 of the Act and regulations 
implementing section 407 of the Act, beginning on January 1 of any year 
for which a transfer unit is allocated fewer Phase I extension reserve 
allowances than the maximum amount that the designated representative 
could have requested in accordance with paragraph (c)(5) of this section 
(as adjusted under paragraph (d) of this section and by the 
Administrator in approving the Phase I extension plan) unless the 
transfer unit is the last unit allocated Phase I extension reserve 
allowances under the plan.
    (2) Monitoring requirements. Each control unit shall comply with the 
special monitoring requirements for Phase I extension plans in 
accordance with part 75 of this chapter.
    (3) Reporting requirements. Each control and transfer unit shall 
comply with the special reporting requirements for Phase I extension 
plans in accordance with Sec. 72.93.
    (4) Liability. The owners and operators of a control or transfer 
unit governed by an approved Phase I extension plan shall be liable for 
any violation of the plan or this section at that or any other unit 
governed by the plan, including liability for fulfilling the obligations 
specified in part 77 of this chapter and section 411 of the Act.
    (5) Termination. A Phase I extension plan shall be in effect only in 
Phase I, and no Phase I extension plan shall be terminated before the 
end of Phase I. The designated representative may, however, withdraw a 
Phase I extension plan at any time prior to issuance of the Phase I Acid 
Rain permit that includes the Phase I extension plan, as adjusted.