[Code of Federal Regulations]
[Title 40, Volume 14]
[Revised as of July 1, 2003]
From the U.S. Government Printing Office via GPO Access
[CITE: 40CFR76.15]

[Page 458-463]
 
                   TITLE 40--PROTECTION OF ENVIRONMENT
 
         CHAPTER I--ENVIRONMENTAL PROTECTION AGENCY (CONTINUED)
 
PART 76--ACID RAIN NITROGEN OXIDES EMISSION REDUCTION PROGRAM--Table of Contents
 
Sec. 76.15  Test methods and procedures.

    (a) The owner or operator may use the following tests as a basis for 
the report required by Sec. 76.10(e)(7):
    (1) Conduct an ultimate analysis of coal using ASTM D 3176-89 
(incorporated by reference as specified in Sec. 76.4);
    (2) Conduct a proximate analysis of coal using ASTM D 3172-89 
(incorporated by reference as specified in Sec. 76.4); and
    (3) Measure the coal mass flow rate to each individual burner using 
ASME Power Test Code 4.2 (1991), ``Test Code for Coal Pulverizers'' or 
ISO 9931 (1991), ``Coal--Sampling of Pulverized Coal Conveyed by Gases 
in Direct Fired Coal Systems'' (incorporated by reference as specified 
in Sec. 76.4).
    (b) The owner or operator may measure and record the actual 
NOX emission rate in accordance with the requirements of this 
part while varying the following parameters where possible to determine 
their effects on the emissions of NOX from the affected 
boiler:
    (1) Excess air levels;
    (2) Settings of burners or coal and air nozzles, including tilt and 
yaw, or swirl;
    (3) For tangentially fired boilers, distribution of combustion air 
within the NOX emission control system;
    (4) Coal mass flow rates to each individual burner;
    (5) Coal-to-primary air ratio (based on pound per hour) for each 
burner, the average coal-to-primary air ratio for all burners, and the 
deviations of individual burners' coal-to-primary air ratios from the 
average value; and
    (6) If the boiler uses varying types of coal, the type of coal. 
Provide the results of proximate and ultimate analyses of each type of 
as-fired coal.
    (c) In performing the tests specified in paragraph (a) of this 
section, the owner or operator shall begin the tests using the equipment 
settings for which the NOX emission control system was 
designed to meet the NOX emission rate guaranteed by the 
primary NOX emission control system vendor. These results 
constitute the ``baseline controlled'' condition.
    (d) After establishing the baseline controlled condition under 
paragraph (c) of this section, the owner or operator may:
    (1) Change excess air levels  5 percent from the 
baseline controlled condition to determine the effects on emissions of 
NOX, by providing a minimum of three readings (e.g., with a 
baseline reading of 20 percent excess air, excess air levels will be 
changed to 19 percent and 21 percent);

[[Page 459]]

    (2) For tangentially fired boilers, change the distribution of 
combustion air within the NOX emission control system to 
determine the effects on NOX emissions by providing a minimum 
of three readings, one with the minimum, one with the baseline, and one 
with the maximum amounts of staged combustion air; and
    (3) Show that the combustion process within the boiler is optimized 
(e.g., that the burners are balanced).

 Appendix A to Part 76--Phase I Affected Coal-Fired Utility Units With 
                     Group 1 or Cell Burner Boilers

                                    Table 1--Phase I Tangentially Fired Units
----------------------------------------------------------------------------------------------------------------
            State                          Plant                  Unit                    Operator
----------------------------------------------------------------------------------------------------------------
ALABAMA......................  EC GASTON....................  5             ALABAMA POWER CO.
GEORGIA......................  BOWEN........................  1BLR          GEORGIA POWER CO.
GEORGIA......................  BOWEN........................  2BLR          GEORGIA POWER CO.
GEORGIA......................  BOWEN........................  3BLR          GEORGIA POWER CO.
GEORGIA......................  BOWEN........................  4BLR          GEORGIA POWER CO.
GEORGIA......................  JACK MCDONOUGH...............  MB1           GEORGIA POWER CO.
GEORGIA......................  JACK MCDONOUGH...............  MB2           GEORGIA POWER CO.
GEORGIA......................  WANSLEY......................  1             GEORGIA POWER CO.
GEORGIA......................  WANSLEY......................  2             GEORGIA POWER CO.
GEORGIA......................  YATES........................  Y1BR          GEORGIA POWER CO.
GEORGIA......................  YATES........................  Y2BR          GEORGIA POWER CO.
GEORGIA......................  YATES........................  Y3BR          GEORGIA POWER CO.
GEORGIA......................  YATES........................  Y4BR          GEORGIA POWER CO.
GEORGIA......................  YATES........................  Y5BR          GEORGIA POWER CO.
GEORGIA......................  YATES........................  Y6BR          GEORGIA POWER CO.
GEORGIA......................  YATES........................  Y7BR          GEORGIA POWER CO.
ILLINOIS.....................  BALDWIN......................  3             ILLINOIS POWER CO.
ILLINOIS.....................  HENNEPIN.....................  2             ILLINOIS POWER CO.
ILLINOIS.....................  JOPPA........................  1             ELECTRIC ENERGY INC.
ILLINOIS.....................  JOPPA........................  2             ELECTRIC ENERGY INC.
ILLINOIS.....................  JOPPA........................  3             ELECTRIC ENERGY INC.
ILLINOIS.....................  JOPPA........................  4             ELECTRIC ENERGY INC.
ILLINOIS.....................  JOPPA........................  5             ELECTRIC ENERGY INC.
ILLINOIS.....................  JOPPA........................  6             ELECTRIC ENERGY INC.
ILLINOIS.....................  MEREDOSIA....................  5             CEN ILLINOIS PUB SER.
ILLINOIS.....................  VERMILION....................  2             ILLINOIS POWER CO.
INDIANA......................  CAYUGA.......................  1             PSI ENERGY INC.
INDIANA......................  CAYUGA.......................  2             PSI ENERGY INC.
INDIANA......................  EW STOUT.....................  50            INDIANAPOLIS PWR & LT.
INDIANA......................  EW STOUT.....................  60            INDIANAPOLIS PWR & LT.
INDIANA......................  EW STOUT.....................  70            INDIANAPOLIS PRW & LT.
INDIANA......................  HT PRITCHARD.................  6             INDIANAPOLIS PWR & LT.
INDIANA......................  PETERSBURG...................  1             INDIANAPOLIS PWR & LT.
INDIANA......................  PETERSBURG...................  2             INDIANAPOLIS PWR & LT.
INDIANA......................  WABASH RIVER.................  6             PSI ENERGY INC.
IOWA.........................  BURLINGTON...................  1             IOWA SOUTHERN UTL.
IOWA.........................  ML KAPP......................  2             INTERSTATE POWER CO.
IOWA.........................  RIVERSIDE....................  9             IOWA-ILL GAS & ELEC.
KENTUCKY.....................  ELMER SMITH..................  2             OWENSBORO MUN UTIL.
KENTUCKY.....................  EW BROWN.....................  2             KENTUCKY UTL CO.
KENTUCKY.....................  EW BROWN.....................  3             KENTUCKY UTL CO.
KENTUCKY.....................  GHENT........................  1             KENTUCKY UTL CO.
MARYLAND.....................  MORGANTOWN...................  1             POTOMAC ELEC PWR CO.
MARYLAND.....................  MORGANTOWN...................  2             POTOMAC ELEC PWR CO.
MICHIGAN.....................  JH CAMPBELL..................  1             CONSUMERS POWER CO.
MISSOURI.....................  LABADIE......................  1             UNION ELECTRIC CO.
MISSOURI.....................  LABADIE......................  2             UNION ELECTRIC CO.
MISSOURI.....................  LABADIE......................  3             UNION ELECTRIC CO.
MISSOURI.....................  LABADIE......................  4              UNION ELECTRIC CO.
MISSOURI.....................  MONTROSE.....................  1             KANSAS CITY PWR & LT.
MISSOURI.....................  MONTROSE.....................  2             KANSAS CITY PWR & LT.
MISSOURI.....................  MONTROSE.....................  3             KANSAS CITY PWR & LT.
NEW YORK.....................  DUNKIRK......................  3             NIAGARA MOHAWK PWR.
NEW YORK.....................  DUNKIRK......................  4             NIAGARA MOHAWK PWR.
NEW YORK.....................  GREENIDGE....................  6             NY STATE ELEC & GAS.
NEW YORK.....................  MILLIKEN.....................  1             NY STATE ELEC & GAS.
NEW YORK.....................  MILLIKEN.....................  2             NY STATE ELEC & GAS.
OHIO.........................  ASHTABULA....................  7             CLEVELAND ELEC ILLUM.

[[Page 460]]


OHIO.........................  AVON LAKE....................  11            CLEVELAND ELEC ILLUM.
OHIO.........................  CONESVILLE...................  4             COLUMBUS STHERN PWR.
OHIO.........................  EASTLAKE.....................  1             CLEVELAND ELEC ILLUM.
OHIO.........................  EASTLAKE.....................  2             CLEVELAND ELEC ILLUM.
OHIO.........................  EASTLAKE.....................  3             CLEVELAND ELEC ILLUM.
OHIO.........................  EASTLAKE.....................  4             CLEVELAND ELEC ILLUM.
OHIO.........................  MIAMI FORT...................  6             CINCINNATI GAS & ELEC.
OHIO.........................  WC BECKJORD..................  5             CINCINNATI GAS & ELEC.
OHIO.........................  WC BECKJORD..................  6             CINCINNATI GAS & ELEC.
PENNSYLVANIA.................  BRUNNER ISLAND...............  1             PENNSYLVANIA PWR & LT.
PENNSYLVANIA.................  BRUNNER ISLAND...............  2             PENNSYLVANIA PWR & LT.
PENNSYLVANIA.................  BRUNNER ISLAND...............  3             PENNSYLVANIA PWR & LT.
PENNSYLVANIA.................  CHESWICK.....................  1             DUQUESNE LIGHT CO.
PENNSYLVANIA.................  CONEMAUGH....................  1             PENNSYLVANIA ELEC CO.
PENNSYLVANIA.................  CONEMAUGH....................  2             PENNSYLVANIA ELEC CO.
PENNSYLVANIA.................  PORTLAND.....................  1             METROPOLITAN EDISON.
PENNSYLVANIA.................  PORTLAND.....................  2             METROPOLITAN EDISON.
PENNSYLVANIA.................  SHAWVILLE....................  3             PENNSYLVANIA ELEC CO.
PENNSYLVANIA.................  SHAWVILLE....................  4             PENNSYLVANIA ELEC CO.
TENNESSEE....................  GALLATIN.....................  1             TENNESSEE VAL AUTH.
TENNESSEE....................  GALLATIN.....................  2             TENNESSEE VAL AUTH.
TENNESSEE....................  GALLATIN.....................  3             TENNESSEE VAL AUTH.
TENNESSEE....................  GALLATIN.....................  4             TENNESSEE VAL AUTH.
TENNESSEE....................  JOHNSONVILLE.................  1             TENNESSEE VAL AUTH.
TENNESSEE....................  JOHNSONVILLE.................  2             TENNESSEE VAL AUTH.
TENNESSEE....................  JOHNSONVILLE.................  3             TENNESSEE VAL AUTH.
TENNESSEE....................  JOHNSONVILLE.................  4             TENNESSEE VAL AUTH.
TENNESSEE....................  JOHNSONVILLE.................  5             TENNESSEE VAL AUTH.
TENNESSEE....................  JOHNSONVILLE.................  6             TENNESSEE VAL AUTH.
WEST VIRGINIA................  ALBRIGHT.....................  3             MONONGAHELA POWER CO.
WEST VIRGINIA................  FORT MARTIN..................  1             MONONGAHELA POWER CO.
WEST VIRGINIA................  MOUNT STORM..................  1             VIRGINIA ELEC & PWR.
WEST VIRGINIA................  MOUNT STORM..................  2             VIRGINIA ELEC & PWR.
WEST VIRGINIA................  MOUNT STORM..................  3             VIRGINIA ELEC & PWR.
WISCONSIN....................  GENOA........................  1             DAIRYLAND POWER COOP.
WISCONSIN....................  SOUTH OAK CREEK..............  7             WISCONSIN ELEC POWER.
WISCONSIN....................  SOUTH OAK CREEK..............  8             WISCONSIN ELEC POWER.
----------------------------------------------------------------------------------------------------------------


                                     Table 2--Phase I Dry Bottom-Fired Units
----------------------------------------------------------------------------------------------------------------
             State                           Plant                   Unit                   Operator
----------------------------------------------------------------------------------------------------------------
ALABAMA.......................  COLBERT.......................  1               TENNESSEE VAL AUTH.
ALABAMA.......................  COLBERT.......................  2               TENNESSEE VAL AUTH.
ALABAMA.......................  COLBERT.......................  3               TENNESSEE VAL AUTH.
ALABAMA.......................  COLBERT.......................  4               TENNESSEE VAL AUTH.
ALABAMA.......................  COLBERT.......................  5               TENNESSEE VAL AUTH.
ALABAMA.......................  EC GASTON.....................  1               ALABAMA POWER CO.
ALABAMA.......................  EC GASTON.....................  2               ALABAMA POWER CO.
ALABAMA.......................  EC GASTON.....................  3               ALABAMA POWER CO.
ALABAMA.......................  EC GASTON.....................  4               ALABAMA POWER CO.
FLORIDA.......................  CRIST.........................  6               GULF POWER CO.
FLORIDA.......................  CRIST.........................  7               GULF POWER CO.
GEORGIA.......................  HAMMOND.......................  1               GEORGIA POWER CO.
GEORGIA.......................  HAMMOND.......................  2               GEORGIA POWER CO.
GEORGIA.......................  HAMMOND.......................  3               GEORGIA POWER CO.
GEORGIA.......................  HAMMOND.......................  4               GEORGIA POWER CO.
ILLINOIS......................  GRAND TOWER...................  9               CEN ILLINOIS PUB SER.
INDIANA.......................  CULLEY........................  2               STHERN IND GAS & EL.
INDIANA.......................  CULLEY........................  3               STHERN IND GAS & EL.
INDIANA.......................  GIBSON........................  1               PSI ENERGY INC.
INDIANA.......................  GIBSON........................  2               PSI ENERGY INC.
INDIANA.......................  GIBSON........................  3               PSI ENERGY INC.
INDIANA.......................  GIBSON........................  4               PSI ENERGY INC.
INDIANA.......................  RA GALLAGHER..................  1               PSI ENERGY INC.
INDIANA.......................  RA GALLAGHER..................  2               PSI ENERGY INC.
INDIANA.......................  RA GALLAGHER..................  3               PSI ENERGY INC.
INDIANA.......................  RA GALLAGHER..................  4               PSI ENERGY INC.
INDIANA.......................  FRANK E RATTS.................  1SG1            HOOSIER ENERGY REC.
INDIANA.......................  FRANK E RATTS.................  2SG1            HOOSIER ENERGY REC.
INDIANA.......................  WABASH RIVER..................  1               PSI ENERGY INC.

[[Page 461]]


INDIANA.......................  WABASH RIVER..................  2               PSI ENERGY INC.
INDIANA.......................  WABASH RIVER..................  3               PSI ENERGY INC.
INDIANA.......................  WABASH RIVER..................  5               PSI ENERGY INC.
IOWA..........................  DES MOINES....................  11              IOWA PWR & LT CO.
IOWA..........................  PRAIRIE CREEK.................  4               IOWA ELEC LT & PWR.
KANSAS........................  QUINDARO......................  2               KS CITY BD PUB UTIL.
KENTUCKY......................  COLEMAN.......................  C1              BIG RIVERS ELEC CORP.
KENTUCKY......................  COLEMAN.......................  C2              BIG RIVERS ELEC CORP.
KENTUCKY......................  COLEMAN.......................  C3              BIG RIVERS ELEC CORP.
KENTUCKY......................  EW BROWN......................  1               KENTUCKY UTL CO.
KENTUCKY......................  GREEN RIVER...................  5               KENTUCKY UTL CO.
KENTUCKY......................  HMP&L STATION 2...............  H1              BIG RIVERS ELEC CORP.
KENTUCKY......................  HMP&L STATION 2...............  H2              BIG RIVERS ELEC CORP.
KENTUCKY......................  HL SPURLOCK...................  1               EAST KY PWR COOP.
KENTUCKY......................  JS COOPER.....................  1               EAST KY PWR COOP.
KENTUCKY......................  JS COOPER.....................  2               EAST KY PWR COOP.
MARYLAND......................  CHALK POINT...................  1               POTOMAC ELEC PWR CO.
MARYLAND......................  CHALK POINT...................  2               POTOMAC ELEC PWR CO.
MINNESOTA.....................  HIGH BRIDGE...................  6               NORTHERN STATES PWR.
MISSISSIPPI...................  JACK WATSON...................  4               MISSISSIPPI PWR CO.
MISSISSIPPI...................  JACK WATSON...................  5               MISSISSIPPI PWR CO.
MISSOURI......................  JAMES RIVER...................  5               SPRINGFIELD UTL.
OHIO..........................  CONESVILLE....................  3               COLUMBUS STHERN PWR.
OHIO..........................  EDGEWATER.....................  13              OHIO EDISON CO.
OHIO..........................  MIAMI FORT \1\................  5-1             CINCINNATI GAS&ELEC.
OHIO..........................  MIAMI FORT \1\................  5-2             CINCINNATI GAS&ELEC.
OHIO..........................  PICWAY........................  9               COLUMBUS STHERN PWR.
OHIO..........................  RE BURGER.....................  7               OHIO EDISON CO.
OHIO..........................  RE BURGER.....................  8               OHIO EDISON CO.
OHIO..........................  WH SAMMIS.....................  5               OHIO EDISON CO.
OHIO..........................  WH SAMMIS.....................  6               OHIO EDISON CO.
PENNSYLVANIA..................  ARMSTRONG.....................  1               WEST PENN POWER CO.
PENNSYLVANIA..................  ARMSTRONG.....................  2               WEST PENN POWER CO.
PENNSYLVANIA..................  MARTINS CREEK.................  1               PENNSYLVANIA PWR & LT.
PENNSYLVANIA..................  MARTINS CREEK.................  2               PENNSYLVANIA PWR & LT.
PENNSYLVANIA..................  SHAWVILLE.....................  1               PENNSYLVANIA ELEC CO.
PENNSYLVANIA..................  SHAWVILLE.....................  2               PENNSYLVANIA ELEC CO.
PENNSYLVANIA..................  SUNBURY.......................  3               PENNSYLVANIA PWR & LT.
PENNSYLVANIA..................  SUNBURY.......................  4               PENNSYLVANIA PWR & LT.
TENNESSEE.....................  JOHNSONVILLE..................  7               TENNESSEE VAL AUTH.
TENNESSEE.....................  JOHNSONVILLE..................  8               TENNESSEE VAL AUTH.
TENNESSEE.....................  JOHNSONVILLE..................  9               TENNESSEE VAL AUTH.
TENNESSEE.....................  JOHNSONVILLE..................  10              TENNESSEE VAL AUTH.
WEST VIRGINIA.................  HARRISON......................  1               MONONGAHELA POWER CO.
WEST VIRGINIA.................  HARRISON......................  2               MONONGAHELA POWER CO.
WEST VIRGINIA.................  HARRISON......................  3               MONONGAHELA POWER CO.
WEST VIRGINIA.................  MITCHELL......................  1               OHIO POWER CO.
WEST VIRGINIA.................  MITCHELL......................  2               OHIO POWER CO.
WISCONSIN.....................  JP PULLIAM....................  8               WISCONSIN PUB SER CO.
WISCONSIN.....................  NORTH OAK CREEK \2\...........  1               WISCONSIN ELEC PWR.
WISCONSIN.....................  NORTH OAK CREEK \2\...........  2               WISCONSIN ELEC PWR.
WISCONSIN.....................  NORTH OAK CREEK \2\...........  3               WISCONSIN ELEC PWR.
WISCONSIN.....................  NORTH OAK CREEK \2\...........  4               WISCONSIN ELEC PWR.
WISCONSIN.....................  SOUTH OAK CREEK \2\...........  5               WISCONSIN ELEC PWR.
WISCONSIN.....................  SOUTH OAK CREEK \2\...........  6               WISCONSIN ELEC PWR.
----------------------------------------------------------------------------------------------------------------
\1\ Vertically fired boiler.
\2\ Arch-fired boiler.


                                  Table 3--Phase I Cell Burner Technology Units
----------------------------------------------------------------------------------------------------------------
             State                           Plant                 Unit                   Operator
----------------------------------------------------------------------------------------------------------------
INDIANA.......................  WARRICK.......................          4  STHERN IND GAS & EL.
MICHIGAN......................  JH CAMPBELL...................          2  CONSUMERS POWER CO.
OHIO..........................  AVON LAKE.....................         12  CLEVELAND ELEC ILLUM.
OHIO..........................  CARDINAL......................          1  CARDINAL OPERATING.
OHIO..........................  CARDINAL......................          2  CARDINAL OPERATING.
OHIO..........................  EASTLAKE......................          5  CLEVELAND ELEC ILLUM.
OHIO..........................  GENRL JM GAVIN................          1  OHIO POWER CO.
OHIO..........................  GENRL JM GAVIN................          2  OHIO POWER CO.
OHIO..........................  MIAMI FORT....................          7  CINCINNATI GAS & EL.

[[Page 462]]


OHIO..........................  MUSKINGUM RIVER...............          5  OHIO POWER CO.
OHIO..........................  WH SAMMIS.....................          7  OHIO EDISON CO.
PENNSYLVANIA..................  HATFIELDS FERRY...............          1  WEST PENN POWER CO.
PENNSYLVANIA..................  HATFIELDS FERRY...............          2  WEST PENN POWER CO.
PENNSYLVANIA..................  HATFIELDS FERRY...............          3  WEST PENN POWER CO.
TENNESSEE.....................  CUMBERLAND....................          1  TENNESSEE VAL AUTH.
TENNESSEE.....................  CUMBERLAND....................          2  TENNESSEE VAL AUTH.
WEST VIRGINIA.................  FORT MARTIN...................          2  MONONGAHELA POWER CO.
----------------------------------------------------------------------------------------------------------------

 Appendix B to Part 76--Procedures and Methods for Estimating Costs of 
          Nitrogen Oxides Controls Applied to Group 1, Boilers

                      1. Purpose and Applicability

    This technical appendix specifies the procedures, methods, and data 
that the Administrator will use in establishing ``***the degree of 
reduction achievable through this retrofit application of the best 
system of continuous emission reduction, taking into account available 
technology, costs, and energy and environmental impacts; and which is 
comparable to the costs of nitrogen oxides controls set pursuant to 
subsection (b)(1) (of section 407 of the Act).'' In developing the 
allowable NOX emissions limitations for Group 2 boilers 
pursuant to subsection (b)(2) of section 407 of the Act, the 
Administrator will consider only those systems of continuous emission 
reduction that, when applied on a retrofit basis, are comparable in cost 
to the cost in constant dollars of low NOX burner technology 
applied to Group 1, Phase I boilers.
    The Administrator will evaluate the capital cost (in dollars per 
kilowatt electrical ($/kW)), the operating and maintenance costs (in $/
year), and the cost-effectiveness (in annualized $/ton NOX 
removed) of installed low NOX burner technology controls over 
a range of boiler sizes (as measured by the gross electrical capacity of 
the associated generator in megawatt electrical (MW)) and utilization 
rates (in percent gross nameplate capacity on an annual basis) to 
develop estimates of the capital costs and cost effectiveness for Group 
1, Phase I boilers. The following units will be excluded from these 
determinations of the capital costs and cost effectiveness of 
NOX controls set pursuant to subsection (b)(1) of section 407 
of the Act: (1) Units employing an alternative technology, or overfire 
air as applied to wall-fired boilers or separated overfire air as 
applied to tangentially fired boilers, in lieu of low NOX 
burner technology for reducing NOX emissions; (2) units 
employing no controls, only controls installed before November 15, 1990, 
or only modifications to boiler operating parameters (e.g., burners out 
of service or fuel switching) for reducing NOX emissions; and 
(3) units that have not achieved the applicable emission limitation.

2. Average Capital Cost for Low NOX Burner Technology Applied 
                           to Group 1 Boilers

    The Administrator will use the procedures, methods, and data 
specified in this section to estimate the average capital cost (in $/kW) 
of installed low NOX burner technology applied to Group 1 
boilers.
    2.1  Using cost data submitted pursuant to the reporting 
requirements in section 4 below, boiler-specific actual or estimated 
actual capital costs will be determined for each unit in the population 
specified in section 1 above for assessing the costs of installed low 
NOX burner technology. The scope of installed low 
NOX burner technology costs will include the following 
capital costs for retrofit application: (1) For the burner portion--
burners or air and coal nozzles, burner throat and waterwall 
modifications, and windbox modifications; and, where applicable, (2) for 
the combustion air staging portion--waterwall modifications or panels, 
windbox modifications, and ductwork, and (3) scope adders or 
supplemental equipment such as replacement or additional fans, dampers, 
or ignitors necessary for the proper operation of the low NOX 
burner technology. Capital costs associated with boiler restoration or 
refurbishment such as replacement of air heaters, asbestos abatement, 
and recasing will not be included in the cost basis for installed low 
NOX burner technology. The scope of installed low 
NOX burner technology retrofit capital costs will include 
materials, construction and installation labor, engineering, and 
overhead costs.
    2.2  Using gross nameplate capacity (in MW) for each unit as 
reported in the National Allowance Data Base (NADB), boiler-specific 
capital costs will be converted to a $/kW basis.
    2.3  Capital cost curves ($/kW versus boiler size in MW) or 
equations for installed low NOX burner technology retrofit 
costs will be developed for: (1) Dry bottom wall fired boilers 
(excluding units applying cell burner technology) and (2) tangentially 
fired boilers.

[[Page 463]]

                              3. [Reserved]

                        4. Reporting Requirements

    4.1  The following information is to be submitted by each designated 
representative of a Phase I affected unit subject to the reporting 
requirements of Sec. 76.14(c):
    4.1.1  Schedule and dates for baseline testing, installation, and 
performance testing of low NOX burner technology.
    4.1.2  Estimates of the annual average baseline NOX 
emission rate, as specified in section 3.1.1, and the annual average 
controlled NOX emission rate, as specified in section 3.1.2, 
including the supporting continuous emission monitoring or other test 
data.
    4.1.3  Copies of pre-retrofit and post-retrofit performance test 
reports.
    4.1.4  Detailed estimates of the capital costs based on actual 
contract bids for each component of the installed low NOX 
burner technology including the items listed in section 2.1. Indicate 
number of bids solicited. Provide a copy of the actual agreement for the 
installed technology.
    4.1.5  Detailed estimates of the capital costs of system 
replacements or upgrades such as coal pipe changes, fan replacements/
upgrades, or mill replacements/upgrades undertaken as part of the low 
NOX burner technology retrofit project.
    4.1.6  Detailed breakdown of the actual costs of the completed low 
NOX burner technology retrofit project where low 
NOX burner technology costs (section 4.1.4) are 
disaggregated, if feasible, from system replacement or upgrade costs 
(section 4.1.5).
    4.1.7  Description of the probable causes for significant 
differences between actual and estimated low NOX burner 
technology retrofit project costs.
    4.1.8  Detailed breakdown of the burner and, if applicable, 
combustion air staging system annual operating and maintenance costs for 
the items listed in section 3.3 before and after the installation, 
shakedown, and/or optimization of the installed low NOX 
burner technology. Include estimates and a description of the probable 
causes of the incremental annual operating and maintenance costs (or 
savings) attributable to the installed low NOX burner 
technology.
    4.2  All capital cost estimates are to be broken down into materials 
costs, construction and installation labor costs, and engineering and 
overhead costs. All operating and maintenance costs are to be broken 
down into maintenance materials costs, maintenance labor costs, 
operating labor costs, and fan electricity costs. All capital and 
operating costs are to be reported in dollars with the year of 
expenditure or estimate specified for each component.

[60 FR 18761, Apr. 13, 1995, as amended at 61 FR 67164, Dec. 19, 1996; 
62 FR 3464, Jan. 23, 1997]