[Code of Federal Regulations] [Title 41, Volume 4] [Revised as of July 1, 2002] From the U.S. Government Printing Office via GPO Access [CITE: 41CFR302-10.204] [Page 181] TITLE 41--PUBLIC CONTRACTS AND PROPERTY MANAGEMENT CHAPTER 302--RELOCATION ALLOWANCES PART 302-10--ALLOWANCES FOR TRANSPORTATION OF MOBILE HOMES AND BOATS USED AS A PRIMARY RESIDENCE--Table of Contents Subpart C--Computation of Allowances Sec. 302-10.204 What costs are allowed for preparing a mobile home for shipment? Allowable costs for preparing a mobile home for shipment include but are not limited to: (a) Blocking and unblocking (including anchoring and unanchoring); (b) Labor costs of removing and installing skirting; (c) Separating, preparing, and sealing each section for movement; (d) Reassembling the two halves of a double-wide mobile home; (e) Travel lift fees; (f) Rental, installation, removal and transportation of hitches and extra axles with wheels and tires; (g) Purchasing blocks in lieu of transporting blocks from old official station and cost of replacement blocks broken while mobile home was being transported; (h) Packing and unpacking of HHG associated with the mobile home; (i) Disconnecting and connecting utilities; (j) Installation and removal of towing lights on trailer; (k) Charges for reasonable extension of existing water and sewer lines; and (l) Dismantling and assembling a portable room appended to a mobile home.