[Code of Federal Regulations]
[Title 44, Volume 1]
[Revised as of October 1, 2003]
From the U.S. Government Printing Office via GPO Access
[CITE: 44CFR10.8]

[Page 105-108]
 
              TITLE 44--EMERGENCY MANAGEMENT AND ASSISTANCE
 
 CHAPTER I--FEDERAL EMERGENCY MANAGEMENT AGENCY, DEPARTMENT OF HOMELAND 
                                SECURITY
 
PART 10--ENVIRONMENTAL CONSIDERATIONS--Table of Contents
 
                Subpart B--Agency Implementing Procedures
 
Sec. 10.8  Determination of requirement for environmental review.

    The first step in applying the NEPA process is to determine whether 
to prepare an environmental assessment or an environmental impact 
statement. Early determination will help ensure that necessary 
environmental documentation is prepared and integrated into the 
decision-making process. Environmental impact statements will be 
prepared for all major Agency actions (see 40 CFR 1508.18) significantly 
(see 40 CFR 1508.27) affecting the quality of the human environment.
    (a) In determining whether to prepare an environmental impact 
statement (EIS) the Regional Director will first determine whether the 
proposal is one which:
    (1) Normally requires an environmental impact statement; or
    (2) Normally does not require either an environmental impact 
statement or an environmental assessment (categorical exclusion).
    (b) Actions that normally require an EIS. (1) In some cases, it will 
be readily apparent that a proposed action will have significant impact 
on the environment. In that event, the Regional Director will, pursuant 
to Sec. 10.9(g) of this part, submit the notice of preparation of an 
environmental impact statement to the Environmental Officer.
    (2) To assist in determining those actions that normally do require 
an environmental impact statement, the following criteria apply:
    (i) If an action will result in an extensive change in land use or 
the commitment of a large amount of land;
    (ii) If an action will result in a land use change which is 
incompatible with the existing or planned land use of the surrounding 
area;
    (iii) If many people will be affected;
    (iv) If the environmental impact of the project is likely to be 
controversial;
    (v) If an action will affect, in large measure, wildlife populations 
and their habitats, important natural resources, floodplains, wetlands, 
estuaries, beaches, dunes, unstable soils, steep slopes, aquifer 
recharge areas, or delicate or rare ecosystems, including endangered 
species;
    (vi) If an action will result in a major adverse impact upon air or 
water quality;
    (vii) If an action will adversely affect a property listed on the 
National Register of Historic Places or eligible for listing on the 
Register if, after consultation with the Advisory Council on Historic 
Preservation an environmental assessment is not deemed sufficient;
    (viii) If an action is one of several actions underway or planned 
for an area and the cumulative impact of these projects is considered 
significant in terms of the above criteria;
    (ix) If an action holds potential for threat or hazard to the 
public; or

[[Page 106]]

    (x) If an action is similar to previous actions determined to 
require an environmental impact statement.
    (3) In any case involving an action that normally does require an 
environmental impact statement, the Regional Director may prepare an 
environmental assessment to determine if an environmental impact 
statement is required.
    (c) Statutory exclusions. The following actions are statutorily 
excluded from NEPA and the preparation of environmental impact 
statements and environmental assessments by section 316 of the Robert T. 
Stafford Disaster Relief and Emergency Assistance Act (Stafford Act), as 
amended, 42 U.S.C. 5159;
    (1) Action taken or assistance provided under sections 402, 403, 
407, or 502 of the Stafford Act; and
    (2) Action taken or assistance provided under section 406 of the 
Stafford Act that has the effect of restoring facilities substantially 
as they existed before a major disaster or emergency.
    (d) Categorical Exclusions (CATEXs). CEQ regulations at 40 CFR 
1508.4 provide for the categorical exclusion of actions that do not 
individually or cumulatively have a significant impact on the human 
environment and for which, therefore, neither an environmental 
assessment nor an environmental impact statement is required. Full 
implementation of this concept will help FEMA avoid unnecessary or 
duplicate effort and concentrate resources on significant environmental 
issues.
    (1) Criteria. The criteria used for determination of those 
categories of actions that normally do not require either an 
environmental impact statement or an environmental assessment include:
    (i) Minimal or no effect on environmental quality;
    (ii) No significant change to existing environmental conditions; and
    (iii) No significant cumulative environmental impact.
    (2) List of exclusion categories. FEMA has determined that the 
following categories of actions have no significant effect on the human 
environment and are, therefore, categorically excluded from the 
preparation of environmental impact statements and environmental 
assessments except where extraordinary circumstances as defined in 
paragraph (d)(5) of this section exist. If the action is of an emergency 
nature as described in Sec. 316 of the Stafford Act (42 U.S.C. 5159), it 
is statutorily excluded and is noted with [SE].
    (i) Administrative actions such as personnel actions, travel, 
procurement of supplies, etc., in support of normal day-to-day 
activities and disaster related activities;
    (ii) Preparation, revision, and adoption of regulations, directives, 
manuals, and other guidance documents related to actions that qualify 
for categorical exclusions;
    (iii) Studies that involve no commitment of resources other than 
manpower and associated funding;
    (iv) Inspection and monitoring activities, granting of variances, 
and actions to enforce Federal, state, or local codes, standards or 
regulations;
    (v) Training activities and both training and operational exercises 
utilizing existing facilities in accordance with established procedures 
and land use designations;
    (vi) Procurement of goods and services for support of day-to-day and 
emergency operational activities, and the temporary storage of goods 
other than hazardous materials, so long as storage occurs on previously 
disturbed land or in existing facilities;
    (vii) The acquisition of properties and the associated demolition/
removal [see paragraph (d)(2)(xii) of this section] or relocation of 
structures [see paragraph (d)(2)(xiii) of this section] under any 
applicable authority when the acquisition is from a willing seller, the 
buyer coordinated acquisition planning with affected authorities, and 
the acquired property will be dedicated in perpetuity to uses that are 
compatible with open space, recreational, or wetland practices.
    (viii) Acquisition or lease of existing facilities where planned 
uses conform to past use or local land use requirements;
    (ix) Acquisition, installation, or operation of utility and 
communication systems that use existing distribution systems or 
facilities, or currently used infrastructure rights-of-way;

[[Page 107]]

    (x) Routine maintenance, repair, and grounds-keeping activities at 
FEMA facilities;
    (xi) Planting of indigenous vegetation;
    (xii) Demolition of structures and other improvements or disposal of 
uncontaminated structures and other improvements to permitted off-site 
locations, or both;
    (xiii) Physical relocation of individual structures where FEMA has 
no involvement in the relocation site selection or development;
    (xiv) Granting of community-wide exceptions for floodproofed 
residential basements meeting the requirements of 44 CFR 60.6(c) under 
the National Flood Insurance Program;
    (xv) Repair, reconstruction, restoration, elevation, retrofitting, 
upgrading to current codes and standards, or replacement of any facility 
in a manner that substantially conforms to the preexisting design, 
function, and location; [SE, in part]
    (xvi) Improvements to existing facilities and the construction of 
small scale hazard mitigation measures in existing developed areas with 
substantially completed infrastructure, when the immediate project area 
has already been disturbed, and when those actions do not alter basic 
functions, do not exceed capacity of other system components, or modify 
intended land use; provided the operation of the completed project will 
not, of itself, have an adverse effect on the quality of the human 
environment;
    (xvii) Actions conducted within enclosed facilities where all 
airborne emissions, waterborne effluent, external radiation levels, 
outdoor noise, and solid and bulk waste disposal practices comply with 
existing Federal, state, and local laws and regulations;
    (xviii) The following planning and administrative activities in 
support of emergency and disaster response and recovery:
    (A) Activation of the Emergency Support Team and convening of the 
Catastrophic Disaster Response Group at FEMA headquarters;
    (B) Activation of the Regional Operations Center and deployment of 
the Emergency Response Team, in whole or in part;
    (C) Deployment of Urban Search and Rescue teams;
    (D) Situation Assessment including ground and aerial reconnaissance;
    (E) Information and data gathering and reporting efforts in support 
of emergency and disaster response and recovery and hazard mitigation; 
and
    (xix) The following emergency and disaster response, recovery and 
hazard mitigation activities under the Stafford Act:
    (A) General Federal Assistance (Sec. 402); [SE]
    (B) Essential Assistance (Sec. 403); [SE]
    (C) Debris Removal (Sec. 407) [SE]
    (D) Temporary Housing (Sec. 408), except locating multiple mobile 
homes or other readily fabricated dwellings on sites, other than private 
residences, not previously used for such purposes;
    (E) Unemployment Assistance (Sec. 410);
    (F) Individual and Family Grant Programs (Sec. 411), except for 
grants that will be used for restoring, repairing or building private 
bridges, or purchasing mobile homes or other readily fabricated 
dwellings;
    (G) Food Coupons and Distribution (Sec. 412);
    (H) Food Commodities (Sec. 413);
    (I) Legal Services (Sec. 415);
    (J) Crisis Counseling Assistance and Training (Sec. 416);
    (K) Community Disaster Loans (Sec. 417);
    (L) Emergency Communications (Sec. 418);
    (M) Emergency Public Transportation (Sec. 419);
    (N) Fire Management Assistance Grants; and
    (O) Federal Emergency Assistance (Sec. 502) [SE].
    (3) Extraordinary circumstances. If extraordinary circumstances 
exist within an area affected by an action, such that an action that is 
categorically excluded from NEPA compliance may have a significant 
adverse environmental impact, an environmental assessment shall be 
prepared. Extraordinary circumstances that may have a significant 
environmental impact include:
    (i) Greater scope or size than normally experienced for a particular 
category of action;

[[Page 108]]

    (ii) Actions with a high level of public controversy;
    (iii) Potential for degradation, even though slight, of already 
existing poor environmental conditions;
    (iv) Employment of unproven technology with potential adverse 
effects or actions involving unique or unknown environmental risks;
    (v) Presence of endangered or threatened species or their critical 
habitat, or archaeological, cultural, historical or other protected 
resources;
    (vi) Presence of hazardous or toxic substances at levels which 
exceed Federal, state or local regulations or standards requiring action 
or attention;
    (vii) Actions with the potential to affect special status areas 
adversely or other critical resources such as wetlands, coastal zones, 
wildlife refuge and wilderness areas, wild and scenic rivers, sole or 
principal drinking water aquifers;
    (viii) Potential for adverse effects on health or safety; and
    (ix) Potential to violate a Federal, State, local or tribal law or 
requirement imposed for the protection of the environment.
    (x) Potential for significant cumulative impact when the proposed 
action is combined with other past, present and reasonably foreseeable 
future actions, even though the impacts of the proposed action may not 
be significant by themselves.
    (4) Documentation. The Regional Director will prepare and maintain 
an administrative record of each proposal that is determined to be 
categorically excluded from the preparation of an environmental impact 
statement or an environmental assessment.
    (5) Revocation. The Regional Director shall revoke a determination 
of categorical exclusion and shall require a full environmental review 
if, subsequent to the granting an exclusion, the Regional Director 
determines that due to changes in the proposed action or in light of new 
findings, the action no longer meets the requirements for a categorical 
exclusion.
    (6) Changes to the list of exclusion categories. (i) The FEMA list 
of exclusion categories will be continually reviewed and refined as 
additional categories are identified and experience is gained in the 
categorical exclusion process. An office, directorate, or administration 
of FEMA may, at any time, recommend additions or changes to the FEMA 
list of exclusion categories.
    (ii) Offices, directorates, and administrations of FEMA are 
encouraged to develop additional categories of exclusions necessary to 
meet their unique operational and mission requirements.
    (iii) If an office, directorate, or administration of FEMA proposes 
to change or add to the list of exclusion categories, it shall first:
    (A) Obtain the approval of the Environmental Officer and the Office 
of the General Counsel; and
    (B) Publish notice of such proposed change or addition in the 
Federal Register at least 60 days before the effective date of such 
change or addition.
    (e) Actions that normally require an environmental assessment. When 
a proposal is not one that normally requires an environmental impact 
statement and does not qualify as a categorical exclusion, the Regional 
Director shall prepare an environmental assessment.
    (f) Documentation. The Regional Director will prepare and maintain 
an administrative record of each proposal that is determined to be 
categorically excluded from the preparation of an environmental impact 
statement or an environmental assessment.
    (g) Actions that normally require an environmental assessment. When 
a proposal is not one that normally requires an environmental impact 
statement and does not qualify as a categorical exclusion, the Regional 
Director shall prepare an environmental assessment.

[45 FR 41142, June 18, 1980, as amended at 46 FR 2049, Jan. 8, 1981; 46 
FR 54346, Nov. 3, 1981; 47 FR 13149, Mar. 29, 1982; 52 FR 5285, Feb. 20, 
1987; 59 FR 954, Jan. 7, 1994; 61 FR 4230, Feb. 5, 1996; 61 FR 10688, 
Mar. 15, 1996; 66 FR 57347, Nov. 14, 2001]