[Code of Federal Regulations] [Title 49, Volume 3] [Revised as of October 1, 2003] From the U.S. Government Printing Office via GPO Access [CITE: 49CFR195.56] [Page 136-137] TITLE 49--TRANSPORTATION CHAPTER I--RESEARCH AND SPECIAL PROGRAMS ADMINISTRATION, DEPARTMENT OF TRANSPORTATION (CONTINUED) PART 195--TRANSPORTATION OF HAZARDOUS LIQUIDS BY PIPELINE--Table of Contents Subpart B--Reporting Accidents and Safety-Related Conditions Sec. 195.56 Filing safety-related condition reports. (a) Each report of a safety-related condition under Sec. 195.55(a) must be filed (received by the Administrator) in writing within 5 working days (not including Saturdays, Sundays, or Federal holidays) after the day a representative of the operator first determines that the condition exists, but not later than 10 working days after the day a representative of the operator discovers the condition. Separate conditions may be described in a single report if they are closely related. To file a report by facsimile (fax), dial (202) 366-7128. (b) The report must be headed ``Safety-Related Condition Report'' and provide the following information: (1) Name and principal address of operator. (2) Date of report. (3) Name, job title, and business telephone number of person submitting the report. (4) Name, job title, and business telephone number of person who determined that the condition exists. (5) Date condition was discovered and date condition was first determined to exist. (6) Location of condition, with reference to the State (and town, city, or county) or offshore site, and as appropriate nearest street address, offshore platform, survey station number, milepost, landmark, or name of pipeline. (7) Description of the condition, including circumstances leading to its discovery, any significant effects of the condition on safety, and the name of the commodity transported or stored. (8) The corrective action taken (including reduction of pressure or shutdown) before the report is submitted and the planned follow-up or future [[Page 137]] corrective action, including the anticipated schedule for starting and concluding such action. [Amdt. 195-39, 53 FR 24950, July 1, 1988; 53 FR 29800, Aug. 8, 1988, as amended by Amdt. 195-42, 54 FR 32344, Aug. 7, 1989; Amdt. 195-44, 54 FR 40878, Oct. 4, 1989; Amdt. 195-50, 59 FR 17281, Apr. 12, 1994; Amdt. 195-61, 63 FR 7723, Feb. 17, 1998]