[Code of Federal Regulations]
[Title 49, Volume 4]
[Revised as of October 1, 2003]
From the U.S. Government Printing Office via GPO Access
[CITE: 49CFR239.303]

[Page 620-621]
 
                        TITLE 49--TRANSPORTATION
 
       CHAPTER II--FEDERAL RAILROAD ADMINISTRATION, DEPARTMENT OF 
                             TRANSPORTATION
 
PART 239--PASSENGER TRAIN EMERGENCY PREPAREDNESS--Table of Contents
 
  Subpart D--Operational (Efficiency) Tests; Inspection of Records and 
                              Recordkeeping
 
Sec. 239.303  Electronic recordkeeping.

    Each railroad to which this part applies is authorized to retain by 
electronic recordkeeping the information prescribed in Sec. 239.301, 
provided that all of the following conditions are met:
    (a) The railroad adequately limits and controls accessibility to 
such information retained in its database system and identifies those 
individuals who have such access;
    (b) The railroad has a terminal at the system headquarters and at 
each division headquarters;
    (c) Each such terminal has a desk-top computer (i.e., monitor, 
central processing unit, and keyboard) and either a facsimile machine or 
a printer connected to the computer to retrieve and produce information 
in a usable format for immediate review by representatives of FRA and 
States participating under part 212 of this chapter;
    (d) The railroad has a designated representative who is authorized 
to authenticate retrieved information from the electronic system as true 
and accurate copies of the electronically kept records; and
    (e) The railroad provides representatives of FRA and States 
participating under part 212 of this chapter with immediate access to 
these records for inspection and copying during normal business hours 
and provides printouts of such records upon request.

         Appendix A to Part 239--Schedule of Civil Penalties \1\

------------------------------------------------------------------------
                                                              Willful
                 Section                     Violation       violation
------------------------------------------------------------------------
Subpart B--Specific Requirements:
239.101(a) Failure of a railroad to               $7,500         $11,000
 adopt a written emergency preparedness
 plan...................................
    (a)(1) Failure of the plan to
     provide for:
        (i) Initial or on-board                    2,500           5,000
         notifications by an on-board
         crewmember.....................
        (ii) Notification of outside               2,500           5,000
         emergency responders by control
         center.........................
    (a)(2) Failure of the plan to
     provide for:
        (i) Initial or periodic training           2,500           5,000
         of on-board personnel..........
        (ii) Initial or periodic                   2,500           5,000
         training of control center
         personnel......................
        (iii) Completion of initial                2,500           5,000
         training of all on-board and
         control center personnel by the
         specified date.................
        (iv) Completion of initial                 2,500           5,000
         training of all newly hired on-
         board and control center
         personnel by the specified date
        (v) Adequate procedures to                 2,500           5,000
         evaluate and test on-board and
         control center personnel for
         qualification under the
         emergency preparedness plan....
        (vi) Adequate on-board staffing.           2,500           5,000
    (a)(3) Failure of a host railroad              3,000           6,000
     involved in joint operations to
     coordinate applicable portions of
     the emergency preparedness plan
     with the railroad or railroads
     providing or operating a passenger
     train service operation............
    (a)(4) Failure of the plan to
     address:
        (i) Readiness procedures for               2,500           5,000
         emergencies in tunnels.........
        (ii) Readiness procedures for              2,500           5,000
         emergencies on an elevated
         structure or in electrified
         territory......................
        (iii) Coordination efforts                 2,500           5,000
         involving adjacent rail modes
         of transportation..............
    (a)(5) Failure of the plan to
     address relationships with on-line
     emergency responders by providing
     for:
        (i) The development and                    3,000           6,000
         availability of training
         programs.......................
        (ii) Invitations to emergency              3,000           6,000
         responders to participate in
         emergency simulations..........
        (iii) Distribution of applicable           3,000           6,000
         portions of the current
         emergency preparedness plan....
    (a)(6) Failure of the plan to
     provide for, or the railroad to
     include on board each train and
     maintain and replace:
        (i) Emergency equipment.........           2,500           5,000
        (ii) First-aid kits.............           2,500           5,000
        (iii) Emergency lighting........           2,500           5,000
    (a)(7) Failure of the plan to                  3,500           7,000
     provide for emergency instructions
     inside each passenger car or to
     include additional safety awareness
     information........................
239.103 Failure to conduct a required              5,000           7,500
 full-scale simulation in accordance
 with the frequency schedule............
239.105 Debriefing and critique
    (a) Failure to conduct a debriefing            4,000           7,500
     and critique session after an
     emergency or full-scale simulation.
    (d)(1) Failure to maintain a record.           2,500           5,000
        (i) Failure to include date or             1,000           2,000
         location of the emergency or
         simulation.....................
        (ii) Failure to include date or            1,000           2,000
         location of the debriefing and
         critique session...............
        (iii) Failure to include names             1,000           2,000
         of participants in the
         debriefing and critique session
    (d)(2) Failure to make record                  1,000           2,000
     available..........................
239.107 Emergency exits

[[Page 621]]


    (a)(1), (a)(2):
        (i) Door not marked or                     2,500           5,000
         instructions not posted........
        (ii) Door improperly marked or             2,500           5,000
         instructions 1,000-2,000-
         improperly posted..............
    (b)(1) Failure to provide for                  5,000           7,500
     scheduled inspection, maintenance,
     and repair of emergency windows and
     doors..............................
    (b)(2):
        (i) Failure to test a                      3,000           6,000
         representative sample of
         emergency windows..............
        (ii) Emergency windows tested              1,500           3,000
         too infrequently...............
    (b)(3) Failure to repair an                    3,500           7,000
     inoperative emergency window or
     door exit..........................
    (c):
        (i) Failure to maintain a record           2,500           5,000
        (ii) Failure to make record                1,000           2,000
         available......................
    (d)(1) Insufficient limits or                  2,500           5,000
     controls on accessibility to
     records............................
    (d)(2) Missing terminal.............           1,000           2,000
    (d)(3) Inability of railroad to                1,000           2,000
     produce information in a usable
     format for immediate review........
    (d)(4) Failure by railroad to                  1,000           2,000
     designate an authorized
     representative.....................
    (d)(5) Failure to make record                  1,000           2,000
     available..........................
Subpart C--Review, Approval, and
 Retention of Emergency Preparedness
 Plans:
239.201 Filing and approval
    (a):
        (i) Failure of a railroad to               5,000           7,500
         file a written emergency
         preparedness plan..............
        (ii) Failure to designate a                1,000           2,000
         primary person to contact for
         plan review....................
        (iii) Failure of a railroad to             2,500           5,000
         file an amendment to its plan..
    (b)(1), (b)(2):
        (i) Failure of a railroad to               2,500           5,000
         correct a plan deficiency......
        (ii) Failure to provide FRA with           1,000           2,000
         a corrected copy of the plan...
    (b)(3):
        (i) Failure of a railroad to               2,500           5,000
         correct an amendment deficiency
        (ii) Failure to file a corrected           1,000           1,000
         plan amendment with FRA........
239.203 Retention of emergency
 preparedness plan
        (1) Failure to retain a copy of            2,500           5,000
         the plan or an amendment to the
         plan...........................
        (2) Failure to make record                 1,000           2,000
         available......................
Subpart D--Operational (efficiency)
 tests; Inspection of Records and
 Recordkeeping:
239.301 Operational (efficiency) tests
    (a) Testing Program.................           5,000           7,500
    (b)(1) Failure to maintain a record.           2,500           5,000
    (b)(2) Record improperly completed..           1,000           1,000
    (c)(1) Failure to retain a copy of             2,500           5,000
     the record.........................
    (c)(2) Failure to make record                  1,000           2,000
     available..........................
239.303 Electronic recordkeeping
    (a) Insufficient limits or controls            2,500           5,000
     on accessibility to records........
    (b) Missing terminal................           1,000           2,000
    (c) Inability of railroad to produce           1,000           2,000
     information in a usable format for
     immediate review...................
    (d) Failure by railroad to designate           1,000           2,000
     an authorized representative.......
    (e) Failure to make record available           1,000           2,000
------------------------------------------------------------------------
1 A penalty may be assessed against an individual only for a willful
  violation. The Administrator reserves the right to assess a penalty of
  up to $22,000 for any violation where circumstances warrant. See 49
  U.S.C. 21301, 21304, and 49 CFR part 209, appendix A. Further
  designations, not found in the CFR citation for certain provisions,
  are FRA Office of Chief Counsel computer codes added as a suffix to
  the CFR citation and used to expedite imposition of civil penalties
  for violations. FRA reserves the right, should litigation become
  necessary, to substitute in its complaint the CFR citation in place of
  the combined designation cited in the penalty demand letter.