[Code of Federal Regulations] [Title 18, Volume 1] [Revised as of April 1, 2004] From the U.S. Government Printing Office via GPO Access [CITE: 18CFR141.61] [Page 461] TITLE 18--CONSERVATION OF POWER AND WATER RESOURCES CHAPTER I--FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY PART 141_STATEMENTS AND REPORTS (SCHEDULES)--Table of Contents Sec. 141.61 FERC Form No. 423, Monthly Report of Cost and Quality of Fuels for Electric Plants. (a) Who must file. Every electric power producer having electric generating plants with a stream-electric generating capacity of 50 megawatts or greater during the reporting month must file with the Federal Energy Regulatory Commission for each such plant the FERC Form No. 423, ``Monthly Report of Cost and Quality of Fuels for Electric Plants,'' pursuant to the General Instructions set out in this form. (b) When to file and what to file. This report must be filed on or before the 45th day after the end of each reporting month. This report must be filed with the Federal Energy Regulatory Commission as prescribed in Sec. 385.2011 of this chapter and as indicated in the General Instructions set out in this form, and must be properly completed and verified. Filing on electronic media pursuant to Sec. 385.2011 of this chapter will be required commencing with the report required to be submitted for the reporting month of January 2002. [Order 622, 66 FR 67078, Dec. 28, 2001]