[Code of Federal Regulations]
[Title 18, Volume 1]
[Revised as of April 1, 2004]
From the U.S. Government Printing Office via GPO Access
[CITE: 18CFR157.209]

[Page 536]
 
           TITLE 18--CONSERVATION OF POWER AND WATER RESOURCES
 
  CHAPTER I--FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY
 
 PART 157_APPLICATIONS FOR CERTIFICATES OF PUBLIC CONVENIENCE AND NECESSITY 
 
  Subpart F_Interstate Pipeline Blanket Certificates and Authorization 
  Under Section 7 of the Natural Gas Act for Certain Transactions and 
                               Abandonment
 
Sec. 157.209  Temporary compression facilities.

    (a) Automatic authorization. If the cost does not exceed the cost 
limitations set forth in column 1 of Table I, under Sec. 158.208(d) of 
this chapter, the certificate holder may install, operate and remove 
temporary facilities provided that the temporary compressor facilities 
shall not be used to increase the volume or service above that rendered 
by the involved existing permanent compressor unit(s).
    (b) Reporting requirements. As part of the certificate holder's 
annual report of projects authorized under paragraph (a) of this 
section, the certificate holder must report the following in the manner 
prescribed in Sec. Sec. 157.6(a) and 385.2011 of this chapter;
    (1) A description of the temporary compression facility, including 
the size, type and number of compressor units;
    (2) The location at which temporary compression was installed, 
operated and removed, including its location relative to existing 
facilities;
    (3) A description of the permanent compression facility which was 
unavailable, and a statement explaining the reason for the temporary 
compression;
    (4) The dates for which the temporary compression was installed, 
operated and removed; and
    (5) If applicable, the information required in Sec. 157.208(e)(4).

[Order 603, 64 FR 26608, May 14, 1999]