[Code of Federal Regulations]
[Title 18, Volume 1]
[Revised as of April 1, 2004]
From the U.S. Government Printing Office via GPO Access
[CITE: 18CFR35.2]

[Page 245]
 
           TITLE 18--CONSERVATION OF POWER AND WATER RESOURCES
 
  CHAPTER I--FEDERAL ENERGY REGULATORY COMMISSION, DEPARTMENT OF ENERGY
 
PART 35_FILING OF RATE SCHEDULES AND TARIFFS--Table of Contents
 
                          Subpart A_Application
 
Sec. 35.2  Definitions.

    (a) Electric service. The term electric service as used herein shall 
mean the transmission of electric energy in interstate commerce or the 
sale of electric energy at wholesale for resale in interstate commerce, 
and may be comprised of various classes of capacity and energy sales 
and/or transmission services. Electric service shall include the 
utilization of facilities owned or operated by any public utility to 
effect any of the foregoing sales or services whether by leasing or 
other arrangements. As defined herein, electric service is without 
regard to the form of payment or compensation for the sales or services 
rendered whether by purchase and sale, interchange, exchange, wheeling 
charge, facilities charge, rental or otherwise.
    (b) Rate schedule. The term rate schedule as used herein shall mean 
a statement of (1) electric service as defined in paragraph (a) of this 
section, (2) rates and charges for or in connection with that service, 
and (3) all classifications, practices, rules, regulations or contracts 
which in any manner affect or relate to the aforementioned service, 
rates, and charges. This statement shall be in writing and may take the 
physical form of a contractual document, purchase or sale agreement, 
lease of facilities, tariff \1\ or other writing. Any oral agreement or 
understanding forming a part of such statement shall be reduced to 
writing and made a part thereof.
---------------------------------------------------------------------------

    \1\ The term tariff means a compilation, in book form, of rate 
schedules of a particular public utility, effective under the Federal 
Power Act, and a copy of each form of service agreement. In connection 
herewith, attention is invited to part 154 of this chapter, i.e., the 
Commission's regulations under the Natural Gas Act, as a guide to the 
form and composition of a tariff.
---------------------------------------------------------------------------

    (c) Filing date. The term filing date as used herein shall mean the 
date on which a rate schedule filing is completed by the receipt in the 
office of the Secretary of all supporting cost and other data required 
to be filed in compliance with the requirements of this part, unless 
such rate schedule is rejected as provided in Sec. 35.5. If the 
material submitted is found to be incomplete, the Director of the Office 
of Electric Power Regulation will so notify the filing utility within 60 
days of the receipt of the submittal.
    (d) Posting. The term posting as used herein shall mean, (1) keeping 
a copy of every rate schedule of a public utility as currently on file, 
or as tendered for filing, with the Commission open and available during 
regular business hours for public inspection in a convenient form and 
place at the public utility's principal and district or division offices 
in the territory served, and (2) mailing to each purchaser under a rate 
schedule a copy of such rate schedule on the date it is sent to this 
Commission for filing. Posting shall include, in the event of the filing 
of increased rates or charges, the mailing to each purchaser under a 
rate schedule or schedules proposed to be changed and to each State 
Commission within whose jurisdiction such purchaser or purchasers 
distribute and sell electric energy at retail, a copy of the rate 
schedule showing such increased rates or charges, comparative billing 
data as required under this part, and, if requested by a purchaser or 
State Commission, a copy of the supporting data required to be submitted 
to this Commission under this part. Upon direction of the Secretary, the 
public utility shall serve copies of rate schedules and supplementary 
data upon designated parties other than those specified herein.
    (e) Effective date. As used herein the effective date of a rate 
schedule shall mean the date on which a rate schedule filed and posted 
pursuant to the requirements of this part is permitted by the Commission 
to become effective as a filed rate schedule. The effective date shall 
be 60 days after the filing date, or such other date as may be specified 
by the Commission.

(16 U.S.C. 284(d), 792 et seq.; Pub. L. 95-617; Pub. L. 95-91; E.O. 
12009, 42 FR 46267)

[Order 271, 28 FR 10573, Oct. 2, 1963, as amended at 28 FR 11404, Oct. 
24, 1963; 43 FR 36437, Aug. 17, 1978; 44 FR 16372, Mar. 19, 1979; 44 FR 
20077, Apr. 4, 1979; Order 39, 44 FR 46454, Aug. 8, 1979]